Old House Renovation in Auckland: What It Involves and Who to Hire

Last updated:

Quick answer: An old house renovation in Auckland starts behind the linings: an asbestos check on any home built before 2000, the state of the wiring, pipes, piles and framing, and any character-overlay or consent rules, before a price is fixed.

Most people who own an older Auckland home start with the fun list: a bigger kitchen, a bathroom that doesn’t grow mould, a lounge that is warm in July. The house has its own list, and it sits behind the gib and under the floor. Old wiring, rot in the weatherboards, asbestos in a 1960s bathroom lining, piles that have settled over a century. Price the fun list before you know what is on the house’s list and the quote you sign is a guess, and the gap lands on you as variations halfway through the job.

Free cost calculator

How much will your renovation cost?

Answer a few questions and we’ll email you an Auckland price range.

Try our free cost calculators →

So the order matters. Find out what the house is hiding, find out which rules apply to it, then design the version you want to live in. That is how you get an older villa, bungalow or 1960s weatherboard home to live like new without losing the reasons you bought it.


What an Old House Renovation in Auckland Actually Involves

An old house renovation in Auckland is rarely one job. It is a strip-out, a set of discoveries, a repair programme and then the renovation you actually asked for, run in that order. The skill is in sequencing it so the discoveries happen early, when they can still be designed around and priced, rather than in week six with the trades booked.

Start behind the linings, not with the finishes

On a pre-1940 villa or bungalow in Mt Eden, Grey Lynn or Ponsonby, the things that move the budget are rarely the tiles or the tapware. They are the subfloor and piles, the condition of the framing behind the bathroom and kitchen walls, the age of the wiring and switchboard, the pipework, and whatever earlier owners did in the 1970s and 80s. Hardboard over sarking, a lean-to laundry added without consent, a bathroom lined in fibre-cement sheet: each one changes what can stay and what has to come out.

Homes from the 1950s to the 1990s carry a different list. Asbestos-based linings and vinyl, aluminium joinery with no thermal break, ceilings with little or no insulation, and boxy layouts with a wall between every room. The fix is the same though: see as much as you can before the design is locked.

What a real one looked like: a two-storey Epsom bungalow

One of ours makes the point. The two-storey Epsom bungalow we finished in July 2020 was a five-bedroom character home with original timber floors, stained glass, panel ceilings, chandeliers and casement windows. The owners wanted a kitchen that worked for a young family, an updated ensuite and guest toilet, a full interior repaint, restored timber floors and new carpet, without the house feeling like a different house. It also dodged the usual bungalow problem: the old wiring was sound, so there was no full rewire to budget around. That single finding changed the shape of the whole job, and it is exactly the kind of thing you want to know before a price is signed, not after.

black undermount kitchen sink with matte black tapware and a roll-up drying rack in a renovated kitchen

Who runs it matters as much as what is in it

A full house renovation pulls in a long list of trades. Our renovation FAQ puts it at more than 20 on a full house job, against 7 to 8 on a single bathroom. On an older home that list grows when the house throws up rot, an asbestos survey or a structural fix. That is why we run every job with one project manager as your point of contact, a dedicated department since 2019, with oversight from our in-house Licensed Building Practitioner (LBP #BP156911) on process, documentation, workmanship and compliance.

💡 Quick tip: Before the first design meeting, write down every repair you already know about: the soft floorboard, the cracked chimney, the window that won’t open. A builder can only price what they can see, and that list is half the scope on an older home.


House Alterations on Older Auckland Homes: the Rules That Apply

Three sets of rules do most of the work on an older house: the Building Act for the building work, the Auckland Unitary Plan for what the outside can look like, and the asbestos regulations for what comes out (the next section). None of them is a reason not to renovate. All of them are cheaper to deal with at the design stage.

Alterations have to leave the house no worse

Under section 112 of the Building Act 2004, council cannot grant a building consent to alter an existing building unless, afterwards, it complies as nearly as is reasonably practicable with the Building Code provisions on means of escape from fire (and on access for people with disabilities, where section 118 requires it), and it keeps complying with the rest of the Code at least as well as it did before the work began. In plain terms, you don’t have to bring a 1910 villa up to new-build standard to alter it, but the alteration can’t make it worse, and fire escape gets particular attention.

Insulating the outside walls is a consent question

Schedule 1 of the Act lists building work that doesn’t need a building consent. Clause 13 covers installing thermal insulation in an existing building, but not in an external wall or a fire separation wall. Ceiling and underfloor insulation are usually straightforward. Insulating the exterior walls of a villa, which normally means taking linings or weatherboards off, is not on the exempt list, so it is a question for council or an LBP before anyone opens a wall.

Character overlays control the outside, not the kitchen

A lot of Auckland’s villas and bungalows sit inside the Special Character Areas Overlay. Chapter D18 of the Auckland Unitary Plan treats restoration and repair as permitted, along with minor alterations to the rear that use the same design and materials. External alterations or additions are a restricted discretionary activity, which means a resource consent, and so is total or substantial demolition (more than 30 per cent of wall elevations and roof area) in areas such as Isthmus A. Plan Change 120 proposes changes to this chapter, so check the current position for your address with council before you design. Interior work, a new kitchen or bathroom inside the existing walls, is not what the overlay is managing.

The design and consent side of this, including what a heritage or character overlay lets you change on the street front, is Sonder Architecture’s explainer on what an Auckland overlay allows you to alter. Sonder’s architectural designers do our consent drawings; we build what they draw.

The alterations owners of older homes ask for most

Most house alterations on an older Auckland home fall into a handful of types, and each one raises its own question before it raises a price.

Taking out a wall to open up the back of the house is a structural question. Adding a second bathroom or an ensuite brings new plumbing and drainage, and often a consent. Replacing a sagging lean-to at the back is an external alteration, which matters if the house sits in a character overlay. Raising or relevelling a house on new piles is foundation work. Moving the kitchen is mostly about where the drains and the switchboard can reach.

None of these is unusual, and none is a reason to walk away from a house. The point is to know which questions your plan raises before you pay for drawings.

Important note: Whether your alteration needs a building consent or resource consent, and whether it is Restricted Building Work, depends on your house and your plans. Confirm it with Auckland Council or a Licensed Building Practitioner before work starts. This article is general information, not consent advice.

Want a ballpark for your renovation?
See the calculators →

Asbestos in Older Homes: the Check That Comes Before the Price

If your house was built before 1 January 2000, asbestos is part of the renovation conversation whether anyone mentions it or not. The law puts the duty on the business doing the work. Your job is the timing: a survey done at the design stage is far easier to plan around than a discovery in week six.

What the regulations say

Subpart 4 of the Health and Safety at Work (Asbestos) Regulations 2016 applies to the refurbishment of a structure built before 1 January 2000 (regulation 19), though not to minor or routine maintenance. Regulation 26 says a business carrying out refurbishment of a home must make sure all asbestos likely to be disturbed is identified and, so far as is reasonably practicable, removed before the refurbishment starts. Removal itself must be done by a licensed asbestos removalist, unless the whole project involves 10 m² or less of non-friable asbestos, in which case it can be done by a trained, competent person (regulation 27).

Where it hides in an Auckland house

WorkSafe’s guidance on asbestos in the home is blunt that you cannot tell whether something contains asbestos just by looking at it; only a tested sample confirms it. Its list of likely places reads like the scope of a typical older-home renovation: textured ceilings, asbestos cement sheet (sold under names like Fibrolite) in kitchens, bathrooms, toilets and laundries, the backing of wall tiles and splashbacks, older carpet underlay, patching compounds and vinyl floor tiles. WorkSafe also points out that once you pay someone to work on it, your home becomes a workplace for the duration of the job.

Get the timing right

Have the survey done at the design stage, before the price is fixed, so anything it finds goes into the programme and the contract instead of your contingency. We’re a renovation company, not an asbestos surveyor or removalist: identification goes to a competent surveyor and removal to a licensed removalist. What an asbestos survey involves before the linings come off is set out step by step in our asbestos guide.

Important note: Don’t disturb a material you suspect contains asbestos. Follow WorkSafe’s guidance and use a licensed asbestos assessor or removalist; WorkSafe publishes a licence holder register.


Living Like New in an Older Auckland Home: Warmth, Layout and Services

Once the house’s own list is known, the renovation you wanted can start. On older homes, four things do most of the work of making it feel new: warmth, a layout that suits how you live now, services wired for the way you use a house, and a kitchen and bathroom that are built properly underneath the finishes.

Warmth first, then the pretty bits

An older Auckland house that is cold and damp in winter will still be cold and damp with a new kitchen in it. EECA’s window insulation page says up to 40% of a home’s heating energy is lost through windows, making them the biggest source of heat loss in an otherwise well insulated home, and that double glazing can reduce this to 25% or less. On a villa with sound sash windows, retrofit glazing in the existing joinery is often possible; rotten or draughty frames are a replacement conversation.

Ceiling and underfloor insulation come first because they are usually the cheapest gains. As at 19 Oct 2026, EECA’s Warmer Kiwi Homes programme offers grants of 50% to 90% off insulation, and up to 90% off heating for those in most need, to people who own and live in a home built before 2008 and meet its card or area criteria. Check eligibility before you build insulation into the renovation price.

close-up of a white bathroom wall switch panel with separate heater, light and extractor fan buttons

Opening up the layout

The classic villa plan is a long hallway with rooms off it and the kitchen at the back, away from the sun. Opening the back of the house into one kitchen, dining and living space is the change many villa owners have in mind. Which walls can go, what beam replaces them and whether the change needs consent is a job for a structural designer and an LBP, not a guess on site. Knock out the wrong wall in a 100-year-old house and the cracks show up three rooms away.

Wiring for how you live now

Older homes were wired for a few lights and a radio. A renovation is the cheapest time to add the circuits, data cabling and positions you will want for the next 20 years: a video intercom at the door, a smart lock, speakers, heated towel rails, an extractor fan on its own switch. Once the linings are back on, every one of those becomes a patch-and-paint job. All of it is electrical work, so it is done and certified by a registered electrician.

close-up of a wall-mounted Panasonic video intercom screen with talk and off buttons

close-up of a black front door fitted with a Yale smart lock and a lever handle

close-up of a smart speaker beside a smartphone showing a device setup screen

Kitchens and bathrooms that last

In an old house the wet areas are where the hidden work concentrates: rotten framing around a shower, a floor that has been tiled over three times, pipework nobody has looked at since the 1960s. A new bathroom is only as good as the substrate and the waterproofing under it. Character still has a place in the finishes. Brushed brass tapware, a classic tile and timber that suits the house can sit on top of a properly built modern wet area. Keep the original kauri or rimu floors, the sash windows and the ceiling detail where they are sound; they are the part of the house you can’t buy new.

Repair, restore or replace?

Not everything old has to go. Original timber floors that have been under carpet for decades often come up well with a sand and a finish, which is what the Epsom owners did. Sash windows with sound frames can usually be eased, re-corded and fitted with new glass rather than replaced. Weatherboards with rot at the ends or along the bottom row can often be patched in matching profile rather than stripping a whole wall.

The calls go the other way when the damage is structural or hidden: framing that is soft around a shower, piles that have moved, or wiring that is past it. Those get replaced, because a renovation that keeps them only covers them up. A fair test: if it is sound and it is part of why you love the house, keep it; if it is the reason the house is cold, damp or unsafe, it goes.

close-up of a brushed brass shower mixer with a hot and cold dial in a character-style bathroom

💡 Quick tip: Ask for an electrical and plumbing walk-through during the strip-out, before the new linings go up. It is the last cheap moment to add a power point, move a light or reroute a pipe.

Want a ballpark for your renovation?
See the calculators →

Choosing an Old House Renovation Builder in Auckland

Whether you already own the house or you are looking at do-ups for sale, the questions are the same. What is this house hiding, what will it cost to find out, and who carries the risk when the walls come open?

Looking at a do-up for sale

Imagine you have found a 1920s bungalow in Mt Albert listed as a do-up. Before you go unconditional, four checks save the most grief.

First, the build date, which tells you whether the asbestos regulations reach it. Second, whether it sits in a character overlay, which you can look up on the Auckland Unitary Plan maps. Third, the council property file, which shows what was consented and what wasn’t. Fourth, any later additions: a plastered extension from the mid-1990s to the mid-2000s needs the same weathertightness scrutiny as the rest of that era’s housing.

Important note: If an older home has been extended or reclad and you suspect a weathertightness problem, get it assessed by a building surveyor or an LBP, or ask Auckland Council, before you buy or design. Remediation can mean a full reclad of the affected walls rather than a repair.

What to ask any builder

  • Will you get an asbestos survey done before you fix the price, and who does it?
  • Who is the Licensed Building Practitioner on the job, and which parts need one?
  • Who handles the consent drawings and the council process?
  • When you open a wall and find rot, how is the extra work priced and approved?
  • Who is my single point of contact, and how often will I hear from them?

Our own answers are on the page that shows the stages we take an older home through, from first visit to handover. The short version: you’ll know the price, the timeline and exactly what’s included before any work starts, and any variation is presented to you in writing and approved by you before additional work begins. We’ve done more than 1,000 Auckland renovations since 2017.

What it costs and how long it takes

Our published FAQ says a full renovation of a standard single-level Auckland home starts from around $140,000, and a two-level home from $180,000 upwards, with the average spend on a full home renovation including bathrooms and kitchen between $80,000 and $160,000 depending on size, scope and product choices. It doesn’t state GST treatment for those bands, so confirm it on any quote.

Timing on the same page: a full house renovation typically takes 3 to 6 months, and two bathrooms, a kitchen, interior painting and flooring for a three-bedroom home generally takes 12 to 16 weeks. Book 3 to 6 months ahead if the job needs consent.

On an older house, what is found when the linings come off is the biggest variable, which is why the survey and investigation come before the number. For the way we put that number together on a whole house, see how we scope and price an older Auckland home as one renovation.

💡 Quick tip: If two quotes for the same old house are far apart, ask each builder what they have allowed for asbestos, rot and subfloor work. The cheaper quote has usually left one of them out.


Where to Start With Your Older Home

The cheapest hour in any old house renovation is the one spent finding out what the house is hiding. Get that done first, design the version you want around it, and the house you bought for its character can live like new for the next 50 years.

➡ Book your free in-home consultation with Superior Renovations using the form at the bottom of this page, or call 0800 199 888
➡ See how we renovate older Auckland homes from strip-out to handover
➡ Request a free feasibility report for your project


What does an old house renovation in Auckland involve?

Usually a strip-out, an investigation of what is behind the linings and under the floor, any repairs that turns up, and then the renovation you asked for. On older Auckland homes the budget is driven by the subfloor and piles, framing around wet areas, wiring, pipework and asbestos, not the finishes. Finding those early is what keeps the fixed price honest.

Do I need an asbestos check before renovating an older home?

If the house was built before 1 January 2000, yes. Regulation 19 of the Health and Safety at Work (Asbestos) Regulations 2016 applies to refurbishment of structures built before that date, and regulation 26 puts the duty to identify asbestos likely to be disturbed on the business doing the refurbishment. Have the survey done at the design stage, before the price is fixed.

Do house alterations on an old home need building consent?

Many do, and some don't. Schedule 1 of the Building Act 2004 lists exempt work, and section 112 sets what an altered building must meet if it does need consent. Insulating external walls is not on the Schedule 1 insulation exemption. Confirm your project with Auckland Council or a Licensed Building Practitioner before work starts.

Can I renovate a villa in a special character area?

Yes. Under Chapter D18 of the Auckland Unitary Plan, restoration, repair and minor rear alterations using the same design and materials are permitted, while external alterations or additions need resource consent. Interior work is not what the overlay manages. Plan Change 120 proposes changes, so check your address with council and talk to a designer early.

How much does it cost to renovate an old house in Auckland?

Our FAQ says a full renovation of a standard single-level Auckland home starts from around $140,000, and a two-level home from $180,000 upwards, with the average full home renovation including bathrooms and kitchen between $80,000 and $160,000. The FAQ does not state GST treatment. On an older home, what is found behind the linings is the biggest variable.

How long does a full renovation of an older home take?

Our FAQ puts a full house renovation in Auckland at typically 3 to 6 months, and two bathrooms, a kitchen, interior painting and flooring for a three-bedroom home at 12 to 16 weeks. Book 3 to 6 months ahead for a full home or a job that needs consent, and allow for investigation on an older house before the programme is set.

What should I check before buying a do-up house in Auckland?

Four things: the build date, which tells you whether the asbestos regulations reach it; whether it sits in a character overlay on the Auckland Unitary Plan maps; the council property file for what was and wasn't consented; and any later plastered additions, which need a weathertightness assessment by a building surveyor or LBP.

Are there grants to insulate an older home?

EECA's Warmer Kiwi Homes programme offers grants of 50% to 90% off insulation, and up to 90% off heating for those in most need, to people who own and live in a home built before 2008 and meet its card or area criteria (as at 19 Oct 2026). Check your eligibility on EECA's site before pricing insulation into a renovation.

Is double glazing worth it in an old villa?

EECA says up to 40% of a home's heating energy is lost through windows and double glazing can reduce this to 25% or less. Sound sash windows can often take retrofit glazing in the existing joinery, while rotten or draughty frames usually need replacing. In a character overlay, changes to street-facing windows can need resource consent.

What should I ask an old house renovation builder?

Ask whether they get an asbestos survey before fixing the price, who the Licensed Building Practitioner on the job is, who handles consent drawings, how rot found behind the walls is priced and approved, and who your single point of contact is. Get the answers in writing before you sign.

Related guides


Further Resources

  1. Featured projects and Client stories to see specifications on some of the projects.
  2. Real client stories from Auckland

Need more information?

Take advantage of our FREE Complete Home Renovation Guide (48 pages), whether you’re already renovating or in the process of deciding to renovate, it’s not an easy process, this guide will help you avoid costly mistakes.

Download Free Renovation Guide (PDF)


Q Mastercard: up to 18 months interest-free, available through Superior Renovations

Have you been putting off getting renovations done?

We have partnered with Q Mastercard ® to offer up to 18 months interest-free, so you can enjoy your new home now and stress less.

Learn More about Interest-Free Payment Options*

*Lending criteria, fees, terms and conditions apply. Mastercard is a registered trademark and the circles design is a trademark of Mastercard International Incorporated.

 

 


Still have questions unanswered?

Book a no-obligation consultation with the team at Superior Renovations, we’d love to meet you to discuss your renovation ideas!

    Services

    Home RenovationKitchen RenovationBathroom RenovationOutdoor RenovationHouse ExtensionCommercialDesign ServicesOther

    By submitting this form, you agree to receive communications from us via email or text regarding our services, you can unsubscribe at any time.

    This site is protected by reCAPTCHA and the Google

    Privacy Policy and Terms of Service apply.


    References

    1. Building Act 2004, section 112: Alterations to existing buildings (legislation.govt.nz)
    2. Building Act 2004, Schedule 1: Building work for which building consent is not required (legislation.govt.nz)
    3. Health and Safety at Work (Asbestos) Regulations 2016 (legislation.govt.nz)
    4. WorkSafe New Zealand, Asbestos in the home
    5. Auckland Unitary Plan, D18 Special Character Areas Overlay: Residential and Business (Auckland Council)
    6. Auckland Unitary Plan maps (Auckland Council)
    7. EECA, Window insulation for home energy efficiency
    8. EECA, Warmer Kiwi Homes: insulation and heater grants