![]()
Project Details
New Bathroom Renovation
Type Of Project: Bathroom Renovation
Location: Greenhithe, Auckland
Year Completed: 2017
A full bathroom renovation in Greenhithe, on Auckland’s North Shore
This is a full bathroom renovation our team completed in Greenhithe, on Auckland’s upper North Shore, in 2017. The photos show the finished room: a calm, grey, stone-look bathroom built around a walk-in glass shower and a freestanding bath, with every wall and the floor tiled from edge to edge.
Greenhithe sits on the upper Waitemata Harbour, and much of the suburb went up through the 1990s and 2000s as it grew. Bathrooms from that era are usually sound but dated, and homeowners here tend to want what this project delivered: a bright, low-maintenance room that feels current and stands up to daily family use.
![]()
What the finished bathroom includes
Reading it straight from the photos, the completed room brings together:
- Large-format grey tiles in a concrete look, run floor to ceiling on the walls and across the floor so the room reads as one continuous surface.
- A walk-in shower behind a semi-frameless glass panel and door, with a rail-mounted handheld shower and a recessed tiled niche for bottles.
- A white freestanding bath set against the tiled wall, with a wall-mounted mixer.
- A wall-hung vanity with a handleless drawer front, a white benchtop and a rectangular above-counter basin, kept off the floor so the room feels larger and is easier to clean under.
- A large frameless mirror, a chrome ladder-style heated towel rail, a close-coupled toilet, and a ceiling heat-lamp and extraction unit.
How we build a bathroom like this
A full bathroom renovation is more sequenced than it looks. Once the old room is stripped back, the order of work usually runs: rough-in for any moved plumbing and wiring, then the wall and floor linings, then waterproofing, then tiling, and finally the fit-off of tapware, the vanity, glass and fittings. Each stage has to be signed off before the next one covers it, because almost none of it can be inspected once the tiles are on.
![]()
Waterproofing: the part behind the tiles
Tiles and grout are not waterproof on their own. In a tiled bathroom, water is held back by a waterproofing membrane applied under the tiles across the shower, the floor and the wet walls. New Zealand Building Code clause E3 Internal Moisture requires that surfaces likely to be splashed or to get wet are impervious and easily cleaned, and it is backed by the Acceptable Solution E3/AS1, published by MBIE Building Performance. The wet-area membranes themselves are made and tested to AS/NZS 4858. Getting the membrane, the falls to the floor waste and the ventilation right is what keeps water out of the framing behind a room like this. Where a renovation relocates plumbing or touches structure it can involve Restricted Building Work, which needs a Licensed Building Practitioner, so consent questions are best checked with a licensed practitioner or Auckland Council rather than assumed.
Bathroom renovations across Greenhithe and the North Shore
We design and build bathrooms right across the North Shore, and a project like this shows what a full bathroom renovation handled by our in-house Auckland team involves from strip-out to fit-off. If you are weighing up a walk-in shower, a freestanding bath, or both in the one room, our guide on choosing between a bath and a walk-in shower is a good place to start, and the shower glass guide covers the panel-and-door setup you can see here. You can also see more of the bathroom renovations we deliver for North Shore homeowners, or get a rough figure from our bathroom renovation cost calculator.
➔ Book your free in-home consultation with Superior Renovations
➔ Estimate your project with our bathroom cost calculator
➔ Request a free feasibility report for your project
How much does a bathroom renovation cost in Greenhithe or on the North Shore?
It depends on the size of the room, how much plumbing moves and the finish you choose. As a guide, our published Auckland pricing runs from around $9,000 to $16,000 for a budget refresh, $25,000 to $35,000 for a full mid-range renovation with design, all trades and project management, and $45,000 and up for a luxury or fully custom bathroom. Greenhithe sits in the same North Shore market, so those bands apply here too.
How long does a bathroom renovation take?
A standard full bathroom renovation runs about 3 to 4 weeks on site from the day demolition starts, provided the design is locked in and materials are on hand before we begin. If the work needs Auckland Council consent, for example because plumbing is being relocated, allow another 4 to 8 weeks for council processing before the build phase can start.
Can you replace a bath with a walk-in shower, or fit both?
Both are common. This Greenhithe bathroom kept a freestanding bath and added a generous walk-in shower behind a glass panel, which suits a main family bathroom. In a smaller room you might choose one or the other. Our guide on choosing between a bath and a walk-in shower runs through the trade-offs on space, resale and everyday use.
Do I need council consent for a bathroom renovation?
Often a like-for-like bathroom renovation does not, but relocating plumbing, altering drainage or changing structure can tip it into work that needs building consent, and some of it is Restricted Building Work that must involve a Licensed Building Practitioner. Rather than assume, check your specific plans with a licensed practitioner or Auckland Council before you start.
Why does waterproofing matter so much in a tiled bathroom?
Tiles and grout are not waterproof by themselves. Water is held back by a membrane under the tiles, and if it fails, moisture gets into the framing and causes rot and mould that is expensive to fix. New Zealand Building Code clause E3 requires wet-area surfaces to be impervious and easily cleaned, with membranes made to AS/NZS 4858. It is the single most important stage in a build like this, and it is hidden the moment the tiles go on.
What does a full bathroom renovation actually involve?
After the old room is stripped out, the work runs in order: plumbing and electrical rough-in, wall and floor linings, waterproofing, tiling, then the fit-off of tapware, vanity, toilet, glass and heating. Each stage is checked before the next one covers it. Managing that sequence, and the trades in the right order, is most of what keeps a bathroom on time and watertight.
Do you work in Greenhithe and across the North Shore?
Yes. We design and build bathrooms and full home renovations right across the North Shore, including Greenhithe, Albany and the surrounding upper-harbour suburbs. You can see more of our North Shore bathroom work on our service pages, or book a free in-home consultation to talk through your own room.