Cost to Build a New Garage Cost Calculator NZ Superior Renovations ®

Quick answer: building a new garage in Auckland costs from around $1,800 per square metre for a basic build to about $2,300 per square metre for a high-end one. That puts a single garage from roughly $55,000 and a double from around $90,000, once you allow for the roof and cladding you choose. Size, build grade, roofing and cladding are the four things that move the number.

A garage is a proper consented build, not a kitset drop, so how much it costs to build a garage in New Zealand usually sits higher than people expect. Here’s the breakdown, and a quick way to price yours.

Free tool
Get an indicative cost to build your new garage

Open the new garage cost calculator →


How much does it cost to build a garage in NZ?

We price a new garage on floor area multiplied by a build grade, then adjust for the roofing and cladding you choose. These are the indicative Auckland figures behind our calculator:

Factor Indicative rate
Single garage (approx 30m²) base size
Double garage (approx 46m²) base size
Basic build from $1,800 per m²
Mid-range build from $1,950 per m²
High-end build from $2,300 per m²
Roofing & cladding choice adjusts the total up

These are indicative figures for planning, not a fixed quote. Your final cost depends on the size, the grade of finish, the roof and cladding materials, your site, and whether you need services like power or plumbing run to it.

💡 Quick tip: A standalone garage almost always needs a building consent and a compliant foundation, drainage and often a vehicle crossing. Those are the costs that separate a real build from a cheap kitset shed.

Single vs double garage cost

Size is the first lever. A single garage of around 30 square metres at the basic grade works out near $55,000 to $65,000 once roofing and cladding are added. A double garage of around 46 square metres runs closer to $90,000 to $110,000 at a mid-range grade.

Step up to a high-end finish, add a mezzanine or a sleepout fit-out, and it climbs from there. Choose your size, grade, roof and cladding in the new garage cost calculator and it builds the estimate for you, rather than you guessing off a per-metre rate. Our new garage cost guide has more on the options.


What size is a single or double garage in NZ?

Size drives the cost, so it pays to know the numbers before you plan. A tight single garage is about 18m², but most people build closer to 20-30m² to fit storage, a workbench or a bit of room around the car. A double garage starts around 36m² and runs up to about 46m² once you allow space to open both doors and move.

  • Single garage. Around 3.0-3.6m wide by 6m deep. Fits one car; go wider if you want storage down one side.
  • Double garage. Around 5.4-6m wide by 6m deep. Fits two cars, or one car plus a workshop or gym zone.
  • Oversized or high-stud. Extra width, depth or height for a boat, a trailer or a mezzanine adds floor area, and cost.

Standard garage sizes in NZ, in metres

There is no single legislated garage size in New Zealand. What exists is a set of dimensions the trade builds to, driven by car sizes, door widths and how much room you need to actually open a door once you have parked. These are the footprints we work from:

Garage type Typical width x depth Floor area
Tight single (car only) 3.0m x 6.0m around 18m²
Standard single 3.6m x 6.0m around 21m²
Single with storage or a workbench 4.2m x 7.0m around 30m²
Standard double 6.0m x 6.0m around 36m²
Double with room to move 6.4m x 7.2m around 46m²
Oversized (boat, trailer, high stud) 6.4m x 8.0m+ 50m² and up

The two dimensions people regret are width and stud height. Width, because a 3.0m single leaves you edging out of the driver’s door against the wall. Stud height, because a standard door opening will not clear a roof box, a hoist or a mezzanine, and raising the stud later means new framing and a new door. Both are cheap to add at design stage and expensive to add afterwards.

Our calculator uses generous footprints – a 30m² single and a 46m² double – so the estimate reflects a garage you can actually use, not just park in. Set your own dimensions in the new garage cost calculator to see how size moves the number.


How build grade, roof and cladding change the price

Two same-sized garages can differ by tens of thousands depending on the specification.

  • Build grade – basic, mid-range or high-end sets the base rate, covering the quality of the structure, doors, and finishing.
  • Roofing – a standard metal roof is the baseline; membrane, concrete tile, slate or copper each add to the total, with slate and copper the priciest.
  • Cladding – the exterior finish, from vinyl and steel through to timber, shifts the cost to match or complement your house.

Matching the garage to your existing home is worth doing, both for looks and for resale. The calculator lets you test each combination on the price before you commit.


Kitset vs a built-on-site garage

This is where a lot of the price confusion comes from. A kitset garage has a lower sticker price, but the sticker is not the finished cost. To make a kitset a permanent, compliant structure you still add a consented concrete foundation, drainage, a vehicle crossing where one is needed, and installation. Once those are in, the gap to a built-on-site garage narrows.

What the difference buys you:

  • It matches the house. A built garage is designed around your home and site – roofline, cladding and finish – rather than sitting apart as a shed.
  • Compliance is handled. Consent, foundation and sign-off are managed as one job, not bolted on afterwards.
  • Resale. A garage that reads as part of the home usually adds more value than a standalone kit.

What garage kit prices actually include

Kit prices are quoted for the kit. Read one carefully and it is usually the frame, the roofing, the cladding and the door, delivered flat-packed to the kerb. What sits outside that number is the part that costs real money:

  • The slab. A compliant reinforced concrete foundation, engineered for your ground conditions. On a sloping or filled Auckland section this alone can move by tens of thousands.
  • Site works and drainage. Cut and fill, stormwater, and connecting it so water goes where the council says it goes.
  • Consent. Drawings, the application, council fees and inspections.
  • Vehicle crossing. If the garage needs a new or widened crossing from the road, that is a separate council approval and a separate cost.
  • Erection labour. Unless you are building it yourself, someone has to put it up and sign it off.

So the honest comparison is not “kit price versus build price”. It is kit price plus everything above, versus build price. Run that comparison and the gap is usually far smaller than the advertised numbers suggest.

If budget is the priority a kitset can still make sense – just price it with the foundation, consent and install included, not the kit on its own.


Building a New Garage vs Converting the One You Have

Plenty of the people who land on a new-garage number are really weighing two options against each other: build a garage, or convert the existing one into a room and live with street parking. They are different jobs with different economics.

Converting is cheaper per square metre, because the expensive bones already exist. The slab, the frame and the roof are there. A conversion is insulation, lining, flooring, glazing, heating and often a bathroom, inside a shell you already own. Our live FAQ puts an Auckland garage conversion from around $40,000, against the $55,000 to $110,000 band for building a new garage from nothing.

What a conversion does not do is give you back the parking. That is the trade nobody costs properly at the start, and on a Millwater or Flat Bush section with a single crossing it matters more than the money. It is also why a common Auckland sequence is both: convert the attached garage into a bedroom, a home office or a granny flat, then build a detached garage at the back for the cars.

If the conversion route is the one you are weighing, our garage conversion cost guide covers the cost drivers, and converting a garage to a granny flat covers what changes when the room has to be self-contained. Either way it is the same crew: the Auckland team that both builds garages and turns them into habitable rooms.


Do you need consent to build a garage?

Almost always, yes. A new garage is a building over 10 square metres, so it needs an Auckland Council building consent, a compliant foundation, and sign-off. There are narrow exemptions for very small, single-storey detached buildings, but a standard single or double garage sits well over the threshold. Confirm your situation with Auckland Council, and the Building Performance (MBIE) guidance sets out what counts as building work needing consent – we manage the consent as part of the build.

Setbacks, vehicle crossings and the site rules that catch people out

Building consent is only half of it. Where the garage can physically sit is set by your zone under the Auckland Unitary Plan, and that is where most garage plans get redrawn:

  • Yard setbacks. How close the structure can sit to a side or rear boundary, which varies by zone and can be tighter again under a special character or heritage overlay.
  • Building coverage and impervious area. A garage adds roof and hardstand. On a small section you can hit the impervious-surface limit before you hit the coverage limit, which pulls stormwater design into the job.
  • Vehicle crossing. A new or widened crossing needs council approval separately from the building consent, and there are rules about how close it can sit to an intersection or a street tree.
  • Covenants and cross-lease titles. Neither shows up in a building consent check. A cross-lease in particular can require the other owners’ consent before you add a structure.

None of that is a reason not to build. It is a reason to check the site before you fall in love with a layout. We pull the property file and confirm the zone rules at feasibility stage, and where the answer needs a formal position it goes to Auckland Council or to a Licensed Building Practitioner rather than being guessed at.


Get your garage number, then get it confirmed

A well-built garage adds storage, security and value, and pairs well with wider outdoor work like driveways and landscaping. The smart first move is a realistic figure for the garage you actually want. Start with the new garage cost calculator, see how it fits a bigger project in our Auckland home renovation guide, then request a free feasibility report for a measured quote from the Superior Renovations team.

➡ Book your free in-home consultation with Superior Renovations
➡ Price your garage with the new garage cost calculator
➡ Request a free feasibility report for your project

Free tool
Price your new garage in under a minute

Open the new garage cost calculator →


How much does it cost to build a garage in NZ?

In Auckland, a new garage costs from about $1,800 per square metre for a basic build, $1,950 for mid-range, and $2,300 for high-end. That puts a single garage (around 30m2) from roughly $55,000 to $65,000, and a double (around 46m2) around $90,000 to $110,000, once roofing and cladding are added.

How much does it cost to build a double garage in NZ?

A double garage of around 46 square metres usually runs between $90,000 and $110,000 at a mid-range grade in Auckland, before any high-end finishes. The exact figure depends on the build grade and your choice of roofing and cladding. Our calculator prices your specific combination.

Why does a garage cost so much to build?

A standalone garage is a full consented build. It needs a building consent, a compliant concrete foundation, drainage, a framed and clad structure, a roof, and a garage door, plus often a vehicle crossing. That is a very different job from dropping a kitset shed on the lawn, which is why the cost is higher.

Do I need building consent to build a garage?

In almost all cases yes. A new garage is over 10 square metres, so it needs an Auckland Council building consent and sign-off. Only very small detached buildings may be exempt, and a standard single or double garage is well over that threshold.

Is it cheaper to build a garage or buy a kitset?

A kitset shed has a lower sticker price, but once you add a consented foundation, drainage, and installation to make it a permanent, compliant structure, the gap narrows. A built-on-site garage also integrates properly with your home and site, which matters for durability and resale.

How does the roof and cladding choice affect the cost?

Roofing and cladding both scale the total. A standard metal roof is the baseline, while membrane, concrete tile, slate or copper add more, with slate and copper the most expensive. Cladding options from vinyl and steel through to timber also shift the price. The calculator lets you test each combination.

How long does it take to build a garage?

A straightforward single garage often takes a few weeks on site once consent is granted, with a double or high-end build taking longer. Consent processing time is separate and sits before the build. Your project manager gives you a full timeline up front.

What size is a single garage in NZ?

A single garage in New Zealand is typically about 3.0 to 3.6 metres wide by 6 metres deep, roughly 18 to 21 square metres. Many people build a little larger, 20 to 30 square metres, to fit storage or a workbench alongside the car. The wider you go, the more usable the space.

How big is a double garage in NZ?

A double garage is usually around 5.4 to 6 metres wide by 6 metres deep, about 32 to 36 square metres, and up to roughly 46 square metres with room to open both doors and move around. That extra space is what makes room for a workshop, gym or storage as well as two cars.

Can I build a garage on the side of my house?

Yes, an attached garage on the side of the house is common and can share a wall with the home, which affects the foundation and structural design. It still needs a building consent, and boundary setbacks under the Auckland Unitary Plan may apply. Confirm your site rules with Auckland Council or a Licensed Building Practitioner.

How much do garage kit prices cover in NZ?

A kit price usually covers the frame, roofing, cladding and the garage door, delivered flat-packed. It does not cover the concrete foundation, drainage, the building consent, the vehicle crossing if you need one, or the labour to erect it. Those items are the difference between a kit price and a finished garage, and they are why the total lands much closer to a built-on-site garage than the advertised kit figure suggests.

Is it cheaper to convert an existing garage or build a new one?

Converting is almost always cheaper per square metre, because the slab, the frame and the roof already exist. A conversion means insulating, lining, glazing and heating an existing shell. Building new means a consent, a foundation, a structure and a roof from scratch. The catch is that converting removes your parking, so a lot of Auckland homeowners end up doing both: convert the attached garage into living space, then build a detached garage for the cars.


Further Resources for your new garage

  1. Featured projects and client stories to see specifications on some of the projects.
  2. Real client stories from Auckland.

Need more information?

Take advantage of our FREE Complete Home Renovation Guide (48 pages), whether you’re already renovating or in the process of deciding to renovate, it’s not an easy process, this guide which includes a free 100+ point check list – will help you avoid costly mistakes.

Download Free Renovation Guide (PDF)


Q Mastercard 18 month interest free payment option badge for Superior Renovations garage builds

Have you been putting off getting renovations done?

We have partnered with Q Mastercard ® to provide you an 18 Month Interest-Free Payment Option, you can enjoy your new home now and stress less.

Learn More about Interest-Free Payment Options*

*Lending criteria, fees, terms and conditions apply. Mastercard is a registered trademark and the circles design is a trademark of Mastercard International Incorporated.

 

 


Still have questions unanswered?

Book a no-obligation consultation with the team at Superior Renovations, we’d love to meet you to discuss your renovation ideas!

    Services

    Home RenovationKitchen RenovationBathroom RenovationOutdoor RenovationHouse ExtensionCommercialDesign ServicesOther

    By submitting this form, you agree to receive communications from us via email or text regarding our services, you can unsubscribe at any time.

    This site is protected by reCAPTCHA and the Google

    Privacy Policy and Terms of Service apply.


    References

    1. Building Performance (MBIE) – Check if you need consents
    2. Auckland Council – Building consents
    3. Auckland Council – Auckland Unitary Plan
    4. Licensed Building Practitioners (LBP) register
    laundry design
    House Renovation

    Renovation Aftercare NZ: Looking After Your Renovated Home

    Quick answer: Renovation aftercare is the maintenance, paperwork and follow-up that protect your renovation once the tradies leave. Your builder must hand over warranties, insurance and maintenance information, you get a 12-month defect repair period, and the Building Code assumes you keep up normal maintenance from day one.

    The build is finished. The scaffolding is gone, the last coat of paint has cured, and for the first time in months your house is quiet. Most Auckland homeowners treat that moment as the finish line. It isn’t. It’s the start of the part nobody briefs you on: the first twelve months, when your rights are strongest, your paperwork is worth the most, and the habits you form decide whether the renovation still looks new in five years.

    Free cost calculator

    How much will your renovation cost?

    Get an instant Auckland price range for your project — no details required to see it.

    Try our free cost calculators →

    This guide covers what happens after handover: the documents you are legally entitled to, how the defect repair period actually works, and the maintenance the Building Code quietly assumes you are doing. Some of it is legal. Most of it takes ten minutes a month.


    What Your Builder Must Hand Over When The Work Finishes

    There is a legal floor here, and it is lower-profile than it should be. Under New Zealand’s residential building consumer protection rules, a contractor must give you three things once the work is complete, no matter what the job cost. Not on request. Automatically.

    The three documents you are entitled to

    According to Building Performance (MBIE), on completion your contractor must provide:

    1. A copy of any current insurance policy held for the building work carried out under the contract.
    2. A copy of any guarantees or warranties for the materials or services used, including how to make a claim, whether the guarantee is transferable, and whether it has to be signed and returned to the issuer.
    3. Information about the processes and materials used to maintain the work, which MBIE notes matters most “if maintenance is required to meet the requirements of the Building Code or could affect any guarantee or warranty”.

    Neglecting to provide that information can mean a fine of $2,000. That third item is the one homeowners skim and later regret, because a warranty you void by cleaning something the wrong way is a warranty you no longer have.

    💡 Quick tip: Check every warranty for the words “must be signed and returned”. Some product guarantees only activate once the registration card or online form is completed, and the window is often 30 days from installation.

    What a Superior Renovations handover looks like

    Our version of this sits at the end of our eight-stage renovation process. When the work is done and the site is cleaned, your project manager runs the final check, then walks the finished spaces with you and your family. Anything you are not happy with gets fixed before sign-off, which is the entire point of walking it together rather than emailing a completion notice.

    You then receive the handover pack: workmanship warranty, product guarantees, and the compliance certificates your project required, including waterproofing (PS3), electrical and gas fitting where applicable. About a month after completion we call you, not to sell you anything, but to check how the spaces are working now you are living in them. You keep your project manager’s number.

    That single point of contact is deliberate. We split project management out of sales into its own department years ago, so the person who owned your build is still the person who picks up when a soft-close hinge needs adjusting in month seven.

    “The walkthrough is the only time everyone is standing in the room together with fresh eyes. Open every drawer, run every tap, look along the skirtings at eye level and then at floor level. Things you notice on that day get fixed on the spot. Things you notice in six months turn into an email chain.”
    — Dorothy Li, Design Manager, Superior Renovations


    The 12-Month Defect Repair Period, And How To Use It Properly

    You have an automatic 12-month defect repair period from the date the building work is complete, and it applies to all residential building work regardless of the price. Inside that year, if you tell your contractor in writing about defective work, they must put it right within a reasonable timeframe. If there is a dispute, the burden sits with them to prove the defect was not their fault, their subcontractor’s, or their product’s.

    Put it in writing, every timeA text message counts. A phone call does not. The protection is written into the process, so a verbal mention during a chat is exactly the kind of thing that gets remembered differently a year later. Send the note, keep the sent copy, add a photo.

    Timing matters too. The clock starts when all the physical building work you agreed to has been finished. If you have a small item outstanding at handover, ask when the completion date is being recorded, and get that in writing as well.

    💡 Quick tip: Set one calendar reminder for month ten. Walk the whole renovation with a torch and a notepad the way you did at handover. You will find the hairline gaps and sticking doors that appeared over a full cycle of Auckland seasons, while you still have two months of the strongest protection left.

    What changes after the first year

    The protection does not vanish at twelve months. Implied warranties under the Building Act apply for up to 10 years, whether or not they appear in your contract. What changes is who has to prove what: once the repair period lapses, the homeowner has to establish that a defect exists before the contractor is required to fix it.

    That is the practical reason the first year is worth using properly. It is also the reason to keep every photo, every invoice and every certificate somewhere you can find them in year eight.

    Important note: This is general information about your consumer rights, not legal advice. If a defect turns into a genuine dispute, talk to a property lawyer, and refer any question about consent, code compliance or restricted building work to Auckland Council or a Licensed Building Practitioner.


    The Maintenance The Building Code Assumes You Are Doing

    Here is the part almost no renovation content covers, and it changes how you read every warranty you were just handed. Building Code clause B2 sets minimum durability periods of 5, 15 or 50 years that building elements must meet “with only normal maintenance”. Those numbers are not a promise the building makes to you. They are a promise made on the assumption that normal maintenance happens.

    Maintenance is written into the compliance path

    It goes further than B2. As Level, BRANZ’s sustainable building resource, sets out, the Acceptable Solution E2/AS1 states that “maintenance shall be carried out as necessary to achieve the required durability of materials, components and junctions”, and describes specific requirements such as washing exterior surfaces, maintaining finish coatings and keeping minimum clearances clear.

    Wall claddings and coating systems are the ones most likely to need regular attention to stay waterproof and durable. Some cladding systems also have working parts, like cavity drainage outlets, that only keep functioning if they are kept clear.

    Neglect can cost you the redress, not just the finish

    MBIE is direct about the consequence in its guidance on protecting your investment: all buildings need ongoing maintenance and it is the owner’s responsibility to see that it happens in a timely way, partly to keep warranties and guarantees valid. If a problem traces back to maintenance that was skipped or done badly, a claim for defective workmanship gets a lot harder.

    National data suggests plenty of room to improve. The BRANZ House Condition Survey found that among owner-occupied homes, just under half were well maintained, with the rest split between reasonably and poorly maintained.

    How well maintained are NZ owner-occupied homes?

    BRANZ House Condition Survey, 2015/16 round

    Well maintained

    48%

    Reasonably maintained

    38%

    Poorly maintained

    14%

    Source: Level (BRANZ) — Maintenance. Bars scaled to the largest value; figures are for owner-occupied homes only.

    💡 Quick tip: Ask your builder which items in your renovation carry a 5-year durability rating rather than 15 or 50. Sealants, coatings and moving hardware usually sit at the short end, and those are the ones that reward a yearly look.

    Want a price for your renovation?
    See the calculators →

    Kitchen Aftercare: Benchtops, Cabinetry And The Things That Move

    A kitchen takes more physical abuse than any other room in the house. Heat, steam, knives, spills and a few thousand door closes a year. The good news is that almost everything that ruins a new kitchen early is a cleaning product or a habit, not a fault.

    Benchtops, doors and cabinet interiors

    Melamine and laminate surfaces want warm water and a little detergent, and that is genuinely it for day-to-day cleaning. Laminex New Zealand’s care guide for Melteca notes that textured finishes sometimes need a soft brush to lift dirt build-up and the residue left by spray-on cleaners, and it names diluted Janola or Handy Andy for stubborn marks. Abrasive pads and scouring powders are what put permanent dull patches into a finish that was fine the day before.

    Stone and engineered stone benchtops have their own rules and they vary by manufacturer, which is exactly why the product guarantees in your handover pack are worth ten minutes of reading. The pattern we see most often is a homeowner reaching for the strongest cleaner in the cupboard on a stain that would have lifted with soapy water and patience.

    Hardware, hinges and the things that move

    Soft-close hinges and drawer runners are adjustable. They are meant to be. A door that has dropped a couple of millimetres or a drawer that no longer closes flush is a two-minute adjustment, not a defect you have to live with, and it is a standard aftercare call in the first year.

    The other habit worth forming is running the rangehood on low for a few minutes after cooking rather than switching it off with the element. Steam and cooking grease that stay in the room settle on cabinetry, and grease is the thing that makes a finish look tired long before it wears out. If you are still at the planning stage, this is the sort of detail our team works through when we specify cabinetry and benchtops for Auckland kitchens.

    Three engineered stone benchtop samples in white, speckled grey and pale grey on a workbench

    💡 Quick tip: Keep one microfibre cloth for the kitchen only and wash it weekly. Most “the finish has gone patchy” calls trace back to a cloth carrying grit or old cleaner residue around the room.


    Bathroom Aftercare: Silicone, Grout And Getting The Moisture Out

    Bathrooms are where Auckland’s climate does its quiet work. Warm, humid air, long showers, and in winter a room that never quite dries out between uses. Nearly all bathroom aftercare comes down to one idea: get the water off the surfaces and the moisture out of the room.

    Silicone, grout and the junctions that do the work

    The waterproofing under your tiles is a system, and the visible sealant lines at the wall-to-floor and wall-to-bath junctions are part of how it keeps performing. Silicone is a maintenance item with a finite life, not a permanent fixture. Watch for it lifting at the corners, going soft, or discolouring in a way that does not clean up, and replace it before water gets a route in behind.

    Grout behaves differently depending on what was specified. Cement-based grout is porous and benefits from sealing and gentle cleaners, while epoxy is denser and far less absorbent, at a higher cost. We compare the two in detail in our guide to epoxy grout versus cement grout, and the choice you made during the build determines the routine you need now.

    “People clean bathroom tiles beautifully and never touch the silicone. It’s the silicone that tells you what’s happening. If a line has gone soft or is pulling away in the corner, that’s the bathroom asking for ten minutes of attention before it becomes a bigger job.”
    — Cici Zuo, Head of Sales, Superior Renovations

    Ventilation is aftercare, not just design

    A well-specified extract fan only helps if it runs long enough. Leaving the fan going for fifteen to twenty minutes after a shower, with the door shut, clears far more moisture than switching it off as you leave, and it protects paint, joinery and grout at the same time. Squeegeeing the shower glass takes fifteen seconds and saves a weekly scrub, particularly in hard-water pockets.

    If mould keeps returning despite all of that, the problem is usually the system rather than your cleaning. Our guide to bathroom ventilation in New Zealand covers ducting, fan sizing and where the moist air actually ends up. Knowing how a bathroom gets waterproofed and sealed before the tiles go on helps too, because that hidden layer is what your surface maintenance is protecting.

     

    Ceiling-mounted bathroom unit combining a heater, light and extractor fan

    White four-button wall switch for the heater, light and fan on a grey tiled bathroom wall

    💡 Quick tip: MBIE’s maintenance guidance recommends keeping living spaces heated to at least 16°C as part of moisture control. In a Titirangi bush setting or a shaded Grey Lynn villa, that single habit does more for mould than any cleaning product.


    The Outside Of The House, And What Auckland’s Climate Does To It

    If your renovation touched the exterior (cladding, joinery, decking or a new roof), this is where maintenance moves from cosmetic to structural. Auckland gives you humidity, salt-laden air along the coast, and long damp winters. Washing is not a cosmetic job here; on most cladding systems it is a condition of the warranty.

    Washing, and how often

    Level’s maintenance guidance gives the kind of frequencies a maintenance schedule should contain: washing down painted weatherboard cladding at least six-monthly, and repainting every 8 to 10 years. Fibre-cement claddings should be washed at the interval the manufacturer specifies, using a soft brush and a low-pressure hose rather than a waterblaster.

    Rinnai gas continuous-flow hot water unit mounted on the exterior wall of the renovated home

    A continuous-flow gas hot water unit on the outside wall at West Harbour. Units like this need an annual service and a clear space around them, and both are the kind of thing that quietly stops happening once the builders have gone.

    Coastal suburbs are the ones to watch. Homes in Devonport, Herne Bay, Takapuna and along the eastern bays collect airborne salt on joinery, hardware and fixings, and a rinse with fresh water is the cheapest maintenance job in the country. Inland, the bigger issue is shade and moss, which is why Titirangi and the bush-edge suburbs need their roofs and gutters watched more closely than a sunny Flat Bush section.

    The annual walk

    MBIE’s guidance is refreshingly simple on frequency: inspect the roof annually, inspect cladding at least annually with extra attention on homes built from the 1990s onwards, and clear gutters and spouting at least once a year. Check window and door seals while you are there, along with flashings and any minimum ground clearances that garden beds or new paving may have quietly buried.

    That last one catches people after landscaping. A raised garden bed or a new path against the wall can bridge the clearance the cladding relies on, and it is a common cause of trouble in homes that were otherwise well built. The same logic applies across the way we scope, build and hand back a full home renovation: the details that protect the house are the ones you cannot see once the job is finished.

     

    Living room with a wall-mounted television, a linear fireplace and teal armchairs

    Underfloor Heating – Epsom- Auckland

     

    💡 Quick tip: Do the gutter clean in late autumn, after the leaf drop and before the winter rain properly arrives. In Auckland that usually means May, and it is the single highest-value hour you will spend on the house all year.

    Planning the next stage of your renovation?
    See the calculators →

    Build Yourself A Maintenance Schedule And Keep The Paperwork

    All of this works better written down. A maintenance schedule is simply a document listing the materials and building elements in your home and the maintenance each one needs, with frequencies attached. Level makes the case that it helps owners know what to do, records what a material actually was years after the build, and reduces a builder’s exposure when a problem is caused by maintenance that never happened.

    Where to start

    BRANZ publishes free homeowner maintenance guides covering roofs, subfloors, interiors, exteriors and building services at maintainingmyhome.org.nz. Start there, then add the specifics from your own handover pack, because a generic schedule cannot know that your splashback is a particular product with a particular cleaner it dislikes.

    Keep the file where you will find it

    Scan the whole handover pack the week you receive it and store it in the cloud alongside the consent documents and code compliance certificate. Photograph the finished rooms while they are empty and clean. If you sell in seven years, that folder is a genuine asset, and if something goes wrong in year eight it is the difference between a conversation and an argument.

    💡 Quick tip: Add three recurring calendar events the week you move back in: gutters in May, exterior wash twice a year, and a full walkthrough at month ten. Three reminders cover most of what a maintenance schedule asks of an average Auckland home.


    Renovation Aftercare: The First Year Is Yours To Use

    Renovation aftercare is not a chore list bolted onto the end of a project. It is the last stage of the build, and it is the one you control. The paperwork you file, the notes you send in writing, and the ten-minute habits you form in the first few months decide whether your renovation is still performing in a decade or whether you are having a conversation about who pays.

    Read the pack. Diarise the walkthrough. Wash the outside. And if something is not right, say so in writing while the clock is still in your favour.

    ➡ Book your free in-home consultation with Superior Renovations
    ➡ Price your next project with our free renovation cost calculators
    ➡ Request a free feasibility report for your project


    What is renovation aftercare?

    Renovation aftercare is everything that happens once the building work is finished: the final walkthrough, the handover of warranties, insurance and maintenance information, the 12-month defect repair period, and the ongoing maintenance that keeps your warranties valid. In New Zealand part of it is a legal obligation on your contractor, and part of it is the owner's responsibility. MBIE is clear that all buildings need ongoing maintenance and that it falls to the building owner to see that it is carried out in a timely way.

    What documents must my builder give me when the renovation is finished?

    Building Performance (MBIE) requires contractors to give you three things once residential building work is complete, regardless of the price: a copy of any current insurance policy held for the work, a copy of any guarantees or warranties for materials and services including how to claim and whether they are transferable, and information about the processes and materials needed to maintain the work. Neglecting to provide this information can mean a fine of $2,000.

    How long is the defect repair period in New Zealand?

    There is an automatic 12-month defect repair period running from the date the building work is complete, and it applies to all residential building work regardless of the price. If you notify your contractor in writing about defective work inside that year, they must remedy it within a reasonable timeframe, and in a dispute the onus is on them to show the defect was not their fault, their subcontractor's or their product's.

    Do I still have protection after the first 12 months?

    Yes. Implied warranties under the Building Act apply for up to 10 years from completion, whether or not they are written into your contract. What changes after the 12-month defect repair period is who carries the burden of proof: the homeowner then has to establish that a defect exists before the contractor is required to fix it. That is why keeping photos, invoices and certificates matters long after the job is done.

    Can poor maintenance void my renovation warranty?

    It can. MBIE's guidance on protecting your investment states that ongoing maintenance is the owner's responsibility partly in order to keep warranties and guarantees valid, and that owners cannot claim for defective workmanship where the problem stems from maintenance that was neglected or carried out incorrectly. Product guarantees frequently carry their own cleaning and maintenance conditions, which is why the maintenance information in your handover pack is worth reading properly.

    What does Building Code clause B2 mean for maintenance?

    Clause B2 sets minimum durability periods of 5, 15 or 50 years that building elements must achieve with only normal maintenance. The durability expectation is conditional on that maintenance happening. Acceptable Solution E2/AS1 goes further, requiring that maintenance be carried out as necessary to achieve the required durability of materials, components and junctions, and it describes tasks such as washing exterior surfaces, maintaining coatings and keeping minimum clearances clear.

    How often should I wash the outside of my house in Auckland?

    Level, BRANZ's sustainable building resource, gives painted weatherboard cladding a wash-down at least six-monthly with repainting every 8 to 10 years as a typical schedule. Fibre-cement cladding should be washed at the interval its manufacturer specifies, using a soft brush and a low-pressure hose rather than a waterblaster. Coastal Auckland suburbs such as Devonport, Herne Bay and Takapuna collect airborne salt on joinery and hardware, so a regular fresh-water rinse is worth adding.

    How do I look after a new kitchen so the finishes last?

    Warm water and a small amount of detergent handles most day-to-day cleaning on melamine and laminate surfaces. Laminex New Zealand's care guidance notes that textured finishes may need a soft brush to lift dirt and spray-cleaner residue, and it names diluted Janola or Handy Andy for stubborn marks. Avoid abrasive pads and scouring powders entirely, run the rangehood for a few minutes after cooking, and ask for soft-close hinges to be adjusted rather than living with a dropped door.

    How do I stop mould coming back in a new bathroom?

    Run the extract fan for fifteen to twenty minutes after a shower with the door closed, squeegee the shower glass, and keep the room heated. MBIE's maintenance guidance recommends heating living spaces to at least 16°C as part of moisture control. If mould keeps returning despite that, the ventilation system itself is usually the issue, most often an undersized fan or ducting that discharges into the roof space instead of outside.

    When should silicone and grout be replaced?

    Silicone sealant is a maintenance item with a finite life rather than a permanent fixture. Replace it when it lifts at the corners, goes soft, or discolours in a way that will not clean up, because those junctions are part of how the wet area keeps performing. Cement-based grout is porous and benefits from sealing and gentle cleaners; epoxy grout is denser and far less absorbent but costs more to install. Which one you have determines the routine your bathroom needs.

    Where can I get a home maintenance schedule for a renovated house?

    BRANZ publishes free homeowner maintenance guides covering roofs, subfloors, interiors, exteriors and building services at maintainingmyhome.org.nz. A maintenance schedule lists the materials and elements in your home with the maintenance each needs and how often. Start with the BRANZ guides, then add the product-specific instructions from your own handover pack, since a generic schedule cannot know which products were installed in your renovation.


    Further Resources for your renovation aftercare

    1. Featured projects and Client stories to see specifications on some of the projects.
    2. Real client stories from Auckland

    Need more information?

    Take advantage of our FREE Complete Home Renovation Guide (48 pages), whether you’re already renovating or in the process of deciding to renovate, it’s not an easy process, this guide which includes a free 100+ point check list – will help you avoid costly mistakes.

    Download Free Renovation Guide (PDF)


    Long Term Finance badge offering 18 months interest free

    Have you been putting off getting renovations done?

    We have partnered with Q Mastercard ® to provide you an 18 Month Interest-Free Payment Option, you can enjoy your new home now and stress less.

    Learn More about Interest-Free Payment Options*

    *Lending criteria, fees, terms and conditions apply. Mastercard is a registered trademark and the circles design is a trademark of Mastercard International Incorporated.

     

     


    Still have questions unanswered?

    Book a no-obligation consultation with the team at Superior Renovations, we’d love to meet you to discuss your renovation ideas!

      Services

      Home RenovationKitchen RenovationBathroom RenovationOutdoor RenovationHouse ExtensionCommercialDesign ServicesOther

      By submitting this form, you agree to receive communications from us via email or text regarding our services, you can unsubscribe at any time.

      This site is protected by reCAPTCHA and the Google

      Privacy Policy and Terms of Service apply.


      References

      1. Building Performance (MBIE) — Once building work finishes
      2. Building Performance (MBIE) — Protection for homeowners
      3. Building Performance (MBIE) — Protecting your investment
      4. Building Performance (MBIE) — B2 Durability
      5. Level (BRANZ) — Maintenance
      6. BRANZ — Maintaining My Home maintenance guides
      7. Laminex New Zealand — How to clean your Melteca cabinetry
      bathroom renovation cost
      Bathroom Renovation

      Bathroom Renovation Cost Calculator NZ: Get a Real Auckland Estimate

      Bathroom Cost Calculator: Get a Real Auckland Renovation Estimate

      Free cost calculator

      How much will your bathroom renovation cost?

      Get an instant Auckland price range for your project — no details required to see it.

      Open the Bathroom Cost Calculator →

      Quick answer: Our free bathroom cost calculator asks a dozen questions about your job (type of renovation, size in m², fittings quality, tiling, underfloor heating, consent and demolition) and sends an indicative Auckland estimate to your inbox. As a benchmark, a mid-range full bathroom renovation in Auckland costs $25,000–$35,000 in 2026, a budget refresh $8,000–$15,000, and a luxury bathroom $35,000–$65,000+.

      Most people start a bathroom renovation with a number in their head. Usually it’s wrong. Either it came from a mate’s job three years ago, or a clickbait headline about a $9,000 bathroom that turned out to be a paint-and-fittings refresh, not a real renovation.

      A bathroom cost calculator exists to replace that guess with something closer to reality. Ours is run by a company that designs and builds bathrooms across Auckland, so it works off Auckland pricing, not a national average that ignores the city’s labour rates. Answer the questions, get an indicative range emailed to you, and start the conversation already knowing roughly what you’re dealing with.

      Here’s how to use it properly, what the number means, and the things no calculator can see.

      ➡ Open the Free Bathroom Cost Calculator

      A dozen quick questions · results sent to your email · no obligation


      What the Bathroom Cost Calculator Actually Does

      The tool asks about a dozen questions, from the type of renovation to the size of the room and the quality of fittings, and returns an indicative cost range for your bathroom. The last screen asks where to send the results (first name, phone and email), and the breakdown lands in your inbox. We follow up after that, which is how the estimate turns into a consultation if you want one.

      It’s an estimate, not a quote. That distinction matters. A calculator works off averages and the inputs you give it. A quote comes after a designer has stood in your bathroom, seen the state of the framing, checked where the pipes run, and worked out exactly what your job needs. The calculator gets you in the right ballpark. The consultation gets you the actual number.

      The Questions the Calculator Asks, and How to Answer Them

      Most bad estimates come from a rushed answer to one question, usually the first. Here is every question the calculator asks, in order, with the answer that gets you a number you can actually plan around.

      Calculator question The options How to answer it well
      Type of bathroom renovation Minor alteration only (swap the toilet, shower and basin, everything stays in place) · Full bathroom renovation (full demolition including floors, rebuilt from scratch) · Designer bathroom (fully custom, designer products and fittings) Choose by scope, not budget. If the room is coming back to the framing or anything is moving, it is a full renovation.
      Underfloor heating Yes / No. Only applies to a full renovation, because it goes in before the tiles. Decide now. Adding it later means lifting a tiled floor. Our guide to underfloor heating in NZ covers running costs and options.
      Quality of fittings Low-end (suits rental properties) · Mid range (the most popular option for homes) · High-end (designer fittings) Pick mid range if you are unsure, then run it again at high-end to see the gap.
      Size of bathroom (m²) Length × width in metres Measure the floor, not the walls. A room 2.4m by 1.8m is 4.32m².
      Does the floor need tiling? Yes / No, priced on an average tile product cost Say yes for any full renovation. A premium tile choice pushes the real figure above the average.
      Renovate an additional toilet? Yes / No Yes if you have a separate toilet room you want done at the same time. Our guide to what a new toilet costs to install explains the separate job.
      Include building consent cost? Yes / No. The tool’s own note: extra plumbing or structural changes mean you are likely to need consent; if unsure, choose No. Yes if you are adding a fixture or touching structure (see the consent section below).
      Replace the hot water cylinder? Yes / No. A common add-on for homes with a low-pressure cylinder. Worth costing if your shower pressure is poor. It also widens your choice of tapware.
      Include demolition? Yes / No Yes, unless the old bathroom has already been stripped out.
      Are you located in Auckland? Yes / No. Prices outside Auckland can differ on labour, materials and travel. Answer honestly. The estimate is built on Auckland pricing.

      There is also a free-text box for anything else we should know. Use it for the things a tick-box can’t capture: a 1950s house, a second storey, a shower that has been leaking.

      Why a Renovation Company’s Calculator Beats a Generic One

      Search “bathroom cost calculator” and you’ll find plenty of tools run by sites that don’t actually renovate bathrooms. Some of them point you off to three other calculators. That’s not much use when you’re trying to budget for a real job in Glen Eden or Howick.

      Ours is different for one simple reason: it’s run by the company that does the work. The mid-range band we publish, $25,000–$35,000, is the same one on our renovation FAQ, and it covers design, supply, all trades and project management, not just products and a plumber.

      “People treat the estimate like a price tag, and it isn’t one. What it’s really good for is telling you whether your wishlist and your budget are even in the same room. If you’ve got $20,000 in mind and a full wet-room plan, the calculator will show you that gap before you’ve spent a cent on design.”
      — Cici Zuo, Head of Sales (NZ Dip. Interior Design), Superior Renovations

      💡 Quick tip: Run the calculator twice, once at your dream spec and once at a more modest one. The difference between the two numbers tells you exactly where your money is going, and where you’ve got room to compromise.


      How to Read Your Bathroom Renovation Estimate

      You’ve got your range. Now what does it actually mean? The calculator sorts most Auckland bathroom renovations into three tiers, and knowing which one you’re aiming for makes the estimate far more useful.

      The Three Tiers, in Plain Numbers

      Renovation Tier Auckland Cost (2026) What You Get
      Budget refresh $8,000–$15,000 New paint, fittings, minor tiling. Fixtures stay where they are. In the calculator, this is “Minor alteration only”.
      Mid-range full renovation $25,000–$35,000 Complete strip-out, new tiling and waterproofing, mid-range fixtures, full project management. Where most Auckland renovations land.
      Luxury / custom $35,000–$65,000+ Premium materials, structural changes or a wet room, custom joinery, high-end tapware and stone. In the calculator, this is the “Designer bathroom” option.

      These are the 2026 bands on our renovation FAQ. Auckland runs 10–20% above the national average, mostly down to qualified trade labour at $120–$150 an hour and compliance costs. If a calculator gives you a number well below these and claims to be NZ-specific, it’s likely quoting a national figure or leaving out trades.

      Bathroom Renovation Cost in NZ vs Auckland

      Searching “how much to renovate a bathroom NZ” gets you national averages, and most of them are lower than an Auckland quote. That gap is real, not padding. Work the 10–20% premium backwards and a $30,000 Auckland bathroom is roughly a $25,000–$27,000 job where trade rates run lower. That’s arithmetic on our published band, not a regional quote. The calculator asks whether you’re in Auckland for exactly this reason, and outside Auckland the result can differ on labour, materials and travel.

      What the Estimate Doesn’t Include

      This is where most budgets come unstuck. The headline range covers the planned work. It does not automatically cover the surprises, and bathrooms, of all rooms, are where surprises live.

      Behind the tiles and under the floor of an older Auckland home, you can find rot, failed waterproofing, or plumbing that should have been replaced a decade ago. Pre-1940s villas and bungalows are the usual suspects: a shower that has been leaking slowly into the floor framing for years looks completely normal until the tiles come off. Nothing on a calculator can see that. The fix runs from a few hundred dollars to several thousand, which is exactly why we tell every client to hold back a contingency of 10–20% on top of their estimate, leaning towards 20% in a pre-1940s home.

      Important note: Treat your calculator estimate as the cost of the visible job. Add 10–20% on top for the things that only show up once the demolition starts. On a $30,000 renovation, that’s $3,000–$6,000 set aside, far better than finding it mid-build.

      If you want the full tier-by-tier breakdown with line items, our Auckland bathroom renovation cost guide for 2026 goes deeper than a calculator can. For the same contingency logic across a whole house, see what a renovation costs in Auckland per square metre.


      The Factors That Move Your Calculator Number Most

      Two bathrooms the same size can come back with wildly different estimates. Here’s what’s pulling the number around, so when you run the tool, you know which lever you’re pulling.

      Whether the Plumbing Moves

      This is the single biggest swing. Keep the toilet, basin, shower, and bath roughly where they are and you keep costs down. Relocate the shower or move the toilet to the other wall and the plumbing line climbs by thousands before you’ve touched a tile. Moving a fixture within the room doesn’t automatically need consent, but adding a new one does, and we cover where that line sits further down.

      Tile Choice and Area

      Tiles are sneaky. A 6m² bathroom tiled floor-to-ceiling is closer to 30m² of tile once you count the walls. Double the price per square metre, say from a $40/m² ceramic to a $120/m² porcelain, and you’ve added well over a thousand dollars on that line alone. Tile Depot is a good place to compare what your range actually buys you. For bathroom design inspiration, browse our completed projects to see how those tile choices look finished.

      Want a price for your bathroom renovation?
      Open the calculator →

      Tapware, Joinery and the Vanity

      As a rough supply guide, an off-the-shelf vanity sits around $800–$2,000, while a custom NZ-made one with a stone top runs to several times that. Tapware does the same thing quietly: the gap between entry-level and premium across your mixer, shower and basin can swing the total by thousands. Brands like Reece are worth a look to see where your spec lands, and our guide to choosing bathroom tapware in NZ sorts the finishes and pressure ratings.

      “The calculator can’t tell you which $3,000 is worth spending. That’s the bit we love about the consultation, sometimes the smartest move is a modest vanity and a really good tap, not the other way round. Spend where your hand actually touches the bathroom every day.”
      — Alison Yu, Designer, Superior Renovations

      💡 Quick tip: Before you run the calculator, decide one thing, are you keeping the existing layout? That single answer changes your estimate more than any other input, because moving plumbing is the most expensive thing you can do in a bathroom.

      Want to put real numbers against your own bathroom? Have a go with the bathroom renovation cost calculator and the estimate will be in your inbox before the kettle’s boiled. If you’re weighing up the bigger picture first, see how we turn a bathroom estimate into a fixed-price build, start to finish.


      Ensuites, Full Renovations and Refreshes: Matching the Estimate to the Job

      The calculator returns a range for the job you describe. Describing it accurately is the part people get wrong, and there are three jobs that regularly get typed in as if they were the same thing.

      What “Full Bathroom Renovation” Actually Means

      A full renovation is a complete strip-out back to the framing. Everything comes out, the substrate is checked and repaired, new waterproofing goes down, the room is re-tiled, and all the fixtures, joinery and tapware are new. Every trade is scheduled and project-managed. That is the $25,000–$35,000 mid-range band, and it is where most Auckland bathroom renovations land.

      What it is not is a refresh. A refresh keeps every fixture where it is, updates the surfaces, and sits at $9,000–$16,000. The gap between those two numbers is not finish level, it is scope: waterproofing, tiling and project management across all trades. If you enter “full renovation” but you are picturing a refresh, the estimate will look alarming for no good reason. We’ve set the two side by side in our guide to full versus partial bathroom renovations.

      Renovating an Ensuite

      An ensuite is usually the smallest wet area in the house, and homeowners reasonably expect it to be the cheapest. It often isn’t, proportionally, and the reason is the same one that makes small kitchens expensive per square metre: the fixed costs do not shrink with the room.

      An ensuite still needs a full waterproofing system, a compliant fall to the waste, ventilation, and every trade through the door. Tiling is a smaller area but a fiddlier one, because a compact room is mostly cuts, corners and junctions. Where an ensuite does come in below a main bathroom is fixture count: often a shower, basin and toilet with no bath, and less tiled area overall.

      Two things move an ensuite out of that comfortable band:

      • Adding a brand-new ensuite where none existed. That is not a bathroom renovation, it is a new wet area: new drainage runs, new waste, new ventilation and framing changes. MBIE lists plumbing and drainage that creates an additional sanitary fixture as work that needs building consent. Enter it in the calculator as a full renovation with consent included, not as a refresh.
      • Going to a wet-room layout. Popular in ensuites because it makes a small footprint feel bigger, and it puts the waterproofing and floor falls under real scrutiny. We cover that in detail in our guide to wet room bathrooms in NZ.

      A master ensuite is the exception to “smaller means cheaper”. It is usually the room where people want the double vanity, the walk-in shower and the heated floor, so it can easily land in the luxury band rather than below a main bathroom. Run it in the calculator as a Designer bathroom at high-end fittings and you’ll see that straight away.

      Whether a new ensuite needs consent in your particular house is a question for Auckland Council or a Licensed Building Practitioner, not for a calculator. For layout ideas before you cost anything, our guide to ensuite bathroom design is a better starting point than a price.

      💡 Quick tip: Renovating a main bathroom and an ensuite together almost always beats doing them a year apart. One set of trades, one waterproofing visit, one project management line, one lot of disruption.

      How Long the Job Takes, and Why That Affects the Budget

      A standard full bathroom renovation takes 3 to 4 weeks from the day demolition starts. Consent, where it is needed, adds 4 to 8 weeks of Auckland Council processing before anything begins. Tiling itself is only a few days of that.

      Time matters to the budget in one specific way: if you are living in the house with one bathroom, a three-to-four-week job is a very different proposition to a two-week one, and that is a real cost even though it never appears on a quote. Our guides to how long a bathroom renovation takes and the stages of a bathroom renovation set out the sequence, and if you are at the very start of this, how to renovate a bathroom in NZ covers the decisions that come before any number.


      Small Bathrooms and Luxury Bathrooms: Both Ends of the Estimate

      The two searches we see most around this calculator sit at opposite ends of the scale: people with a tiny bathroom hoping for a small number, and people planning a luxury bathroom who want to know where the ceiling is. Both get surprised, for opposite reasons.

      Small Bathroom Renovation Cost in NZ

      A small bathroom is not proportionally cheaper, because most of the cost is fixed per room, not per square metre. The plumber makes the same connections at 4m² as at 7m². The waterproofing system, the fall to the waste, the extract fan, the electrician’s visit and the project management all arrive regardless of floor area. What shrinks is the tile, the adhesive and some labour hours.

      Our full cost guide puts a small (5–7m²) full renovation in Auckland at $20,000–$30,000, close to a mid-size bathroom. So in the calculator, get the renovation type right first. Size matters, but it is not where most of a small bathroom’s cost sits.

      If the budget is tight, the real choice is scope. Keep every fixture where it is and you’re in refresh territory at $8,000–$15,000. Our guide to bathroom renovations under $10,000 shows what that buys, and small bathroom design ideas covers the layout tricks that make 4m² feel bigger without moving a pipe. If you’re tempted to do part of it yourself, read what NZ law lets you DIY in a bathroom first, because waterproofing and plumbing are not on that list.

      💡 Quick tip: On a small bathroom, half-height tiling is one of the few savings that scales with the room. It’s first on the cost-saving list on our FAQ, along with keeping the plumbing where it is.

      Luxury Bathroom Renovation Cost in Auckland

      A custom luxury bathroom in Auckland sits at $35,000–$65,000+ on our published 2026 bands. The “+” is honest: there is no hard ceiling once you add structural change, stone and a wet room. What pushes a bathroom into this band is rarely one big item. It’s the stack:

      • Layout and structure. Moving walls, relocating the shower or adding a fixture brings in consent, and sometimes an engineer.
      • A wet room or level-entry shower. On its own, our FAQ puts a wet room in the mid-range band at about $20,000–$35,000. Combine it with premium finishes and structural work and you are in luxury territory.
      • Underfloor heating and a heated towel rail. Both are decisions you make before the tiles go down.
      • Custom joinery, stone and designer tapware. This is the “High-end range” choice in the calculator, and it compounds across every fitting in the room.

      For a line-by-line luxury breakdown (labour, materials, fixtures and plumbing as a share of the total), the Auckland bathroom cost guide sets it out by tier. The calculator’s job is narrower: run Designer bathroom at High-end fittings, then again at Mid range, and the difference is what the premium spec is costing you.

      💡 Quick tip: Before you run a luxury estimate, pick the three things you will notice every day (the shower, the vanity, the floor underfoot) and spec those first. Everything else can sit a tier lower without anyone noticing.

      Planning More Than a Bathroom?

      If the bathroom is one part of a bigger job, a single-room calculator will under-count. We run separate calculators for kitchens, extensions, garage conversions, recladding, reroofing and more on our renovation cost calculator hub. For a whole-house number, our Auckland renovation cost guide works from $2,000–$4,500 per square metre for a standard renovation, or $80,000–$160,000 for a mid-range full home.


      From Estimate to Real Quote: What Happens Next

      So you’ve run the numbers and the range feels workable. Where to from here?

      The calculator’s job is done. It’s told you whether your project is realistic and roughly what to budget. The only way to get an accurate, fixed price is a free in-home consultation, where one of our designers sees the actual space. That’s when the unknowns become knowns: the state of the substrate, where the pipes really run, whether your plan triggers consent.

      Do You Need Consent? The Calculator Can’t Tell You

      Most straightforward bathroom renovations, with new tiles, vanity, toilet and shower in the same spots, don’t need building consent. The detail sits in Schedule 1 of the Building Act 2004. Under Part 2, work done by a person authorised under the Plumbers, Gasfitters, and Drainlayers Act 2006 is exempt for replacing sanitary plumbing in the same position with a comparable product (clause 32), and for altering existing sanitary plumbing provided the total number of sanitary fixtures in the building is not increased and no specified system is affected (clause 35).

      The flip side is spelled out on MBIE’s check if you need consents page: plumbing and drainage that creates an additional sanitary fixture needs consent, and so does structural work, including alterations. So an extra basin, a new shower where there wasn’t one, or moving a wall all push you into consent. Electrical work is a separate regime: a registered electrician does it and certifies it.

      Consent isn’t just a cost; it’s time. We tell clients to allow 4 to 8 weeks for Auckland Council processing before the build can start. Worth knowing before you set a move-in-ready deadline. The exemptions have conditions, so confirm your own scope with Auckland Council or a Licensed Building Practitioner before you rely on one.

      Why Talk to a Renovation Company Rather Than Piece It Together

      A full bathroom renovation pulls in a long line of trades: demolition, plumbing, electrical, waterproofing, tiling, cabinetry, painting. Coordinating that lot yourself is the single biggest source of stress for homeowners who go it alone. Superior Renovations runs all of it as one job: in-house design, a fixed-price contract, one project manager, our 147+ point quality assurance process, and a 12-month maintenance agreement and workmanship warranty on top of the trade warranties. It’s the difference between an estimate on a screen and a finished bathroom that doesn’t leak in two years.

      Our showroom at 16B Link Drive, Wairau Valley is open if you’d rather see real tiles, vanities, and tapware in person before you commit to a spec.


      Get Your Bathroom Cost Estimate Today

      A good estimate turns a vague plan into a real decision. Run the calculator, sit with the number, then let’s talk about turning it into a bathroom you actually want to stand in.

      ➡ Get My Free Bathroom Cost Estimate

      Free · a dozen quick questions · no obligation

      ➡ Book your free in-home consultation with Superior Renovations
      ➡ Open the bathroom renovation cost calculator
      ➡ Request a free feasibility report for your project


      Is the bathroom cost calculator free to use?

      Yes. The bathroom cost calculator was built by Superior Renovations and is completely free, with no obligation. It asks about a dozen questions and the indicative cost breakdown is emailed straight to you. We then follow up to answer any questions and, if you're keen, arrange a free in-home consultation for an accurate fixed-price quote. There's no charge for the tool or the follow-up.

      How much does a bathroom renovation cost in Auckland?

      In Auckland in 2026, a mid-range full bathroom renovation costs $25,000–$35,000, covering design, supply, all trades, and project management. A budget refresh (new paint, fittings, minor tiling) runs $8,000–$15,000. A custom luxury bathroom with premium materials, structural changes or a wet room sits at $35,000–$65,000+. Auckland runs 10–20% above the national average, mostly on qualified trade labour at $120–$150 an hour.

      How accurate is a bathroom cost calculator?

      A calculator gives you a realistic indicative range, not a fixed price. It works off averages and the inputs you provide, bathroom size, type of work, finish level. It can't see the state of your framing, where your plumbing runs, or whether you'll uncover water damage during demolition. Treat the estimate as the cost of the visible job, then add a 10–15% contingency. An accurate price only comes after an in-home consultation.

      What does a bathroom cost calculator estimate include?

      The calculator prices the job you describe: the type of renovation, the room size, the quality of fittings and whether the floor is tiled. You choose whether to include demolition, building consent, underfloor heating, a hot water cylinder replacement and an additional toilet. It does not include hidden repairs like rotten framing or failed waterproofing, which only show up once work begins. That's why we recommend holding back 10–20% of your budget as a contingency on top of the calculator figure.

      Do I need building consent for a bathroom renovation?

      Most standard bathroom renovations, replacing tiles, vanity, toilet and shower in the same positions, do not need building consent. Schedule 1 of the Building Act 2004 exempts an authorised plumber altering existing sanitary plumbing as long as the number of sanitary fixtures doesn't increase. MBIE lists plumbing that creates an additional sanitary fixture, and structural alterations, as work needing consent. Allow 4 to 8 weeks for Auckland Council processing. We assess this at your consultation and manage the application; confirm your scope with council or an LBP.

      Why is the calculator estimate higher than I expected?

      Usually because the number reflects a full renovation by a company that manages every trade, not a DIY fixture swap. A budget refresh of $8,000–$15,000 is a different job to a $25,000–$35,000 mid-range renovation with new waterproofing, tiling, and project management. The other common reason is Auckland pricing, which sits 10–20% above the national average. Running the calculator at two different spec levels shows you exactly where the cost sits.

      How long does a bathroom renovation take in Auckland?

      A standard full bathroom renovation takes 3 to 4 weeks from the day demolition begins, assuming the design is finalised and all materials are on site before work starts. If your project needs consent, for moving plumbing or structural changes, add 4 to 8 weeks for Auckland Council processing before the build can begin. Your project manager gives you a clear timeline at the start and keeps you updated throughout.

      How much does a small bathroom renovation cost in NZ?

      Less than a large one, but not proportionally less. Our Auckland cost guide puts a small (5-7m2) full renovation at $20,000-$30,000, close to a mid-size bathroom, because the plumbing connections, waterproofing system, ventilation and project management cost much the same at 4m2 as at 7m2. Keeping every fixture where it is drops the job into refresh territory at $8,000-$15,000. Outside Auckland, trade rates usually run lower; Auckland sits 10-20% above the national average.

      What's the difference between a budget refresh and a full renovation?

      A budget refresh ($8,000–$15,000) keeps every fixture where it is and updates the surface: new paint, new fittings, maybe minor tiling. A full mid-range renovation ($25,000–$35,000) is a complete strip-out, new waterproofing, full tiling, new fixtures, and project management across all trades. The calculator lets you estimate both so you can see whether a refresh gets you what you want, or whether you need the full job.

      Should I use a contingency on top of my estimate?

      Yes, always. We recommend 10–20% of your renovation budget held back as a contingency, closer to 20% in a pre-1940s villa or bungalow. Bathrooms in older Auckland homes commonly hide water damage, rot, or failed waterproofing behind the tiles and under the floor, none of which a calculator can predict. On a $30,000 renovation that's $3,000–$6,000 set aside. If you don't need it, you've saved it. If you do, you're not scrambling mid-build.

      How much does an ensuite renovation cost in Auckland?

      An ensuite is priced off the same Auckland bands as any other bathroom: a refresh $8,000-$15,000, a full mid-range renovation $25,000-$35,000, and luxury or custom $35,000-$65,000+. A master ensuite with a double vanity and walk-in shower can land in the luxury band. It is smaller, but not proportionally cheaper, because the fixed costs do not shrink with the room. You still need a full waterproofing system, a compliant fall to the waste, ventilation and every trade through the door, and a compact room is mostly tile cuts and junctions. Adding a brand-new ensuite where none existed is a different job again: it creates new sanitary fixtures, which MBIE lists as needing building consent.

      How much does a luxury bathroom renovation cost in Auckland?

      A custom luxury bathroom in Auckland costs $35,000-$65,000+ in 2026, on our published bands. What pushes a bathroom there is usually a stack of choices: structural or layout changes that bring in consent, a wet room or level-entry shower, underfloor heating, custom joinery and stone, and designer tapware. In the calculator, choose Designer bathroom with High-end fittings, then rerun it at Mid range to see what the premium spec is costing you. Our Auckland bathroom cost guide breaks the luxury tier down line by line.


      Further Resources for your bathroom renovation

      1. Featured projects and Client stories to see specifications on some of the projects.
      2. Real client stories from Auckland

      Need more information?

      Take advantage of our FREE Complete Home Renovation Guide (48 pages), whether you’re already renovating or in the process of deciding to renovate, it’s not an easy process, this guide which includes a free 100+ point check list – will help you avoid costly mistakes.

      Download Free Renovation Guide (PDF)


      18 months 0 percent interest long term finance badge

      Have you been putting off getting renovations done?

      We have partnered with Q Mastercard ® to provide you an 18 Month Interest-Free Payment Option, you can enjoy your new home now and stress less.

      Learn More about Interest-Free Payment Options*

      *Lending criteria, fees, terms and conditions apply. Mastercard is a registered trademark and the circles design is a trademark of Mastercard International Incorporated.

       

       


      Still have questions unanswered?

      Book a no-obligation consultation with the team at Superior Renovations, we’d love to meet you to discuss your renovation ideas!

        Services

        Home RenovationKitchen RenovationBathroom RenovationOutdoor RenovationHouse ExtensionCommercialDesign ServicesOther

        By submitting this form, you agree to receive communications from us via email or text regarding our services, you can unsubscribe at any time.

        This site is protected by reCAPTCHA and the Google

        Privacy Policy and Terms of Service apply.


        References

        1. Building Performance (MBIE) — Check if you need consents
        2. New Zealand Legislation — Building Act 2004, Schedule 1 (clauses 32 and 35)
        3. Superior Renovations — Renovation cost and timeline FAQ
        garage conversion cost calculator
        House Renovation

        Garage Conversion Cost NZ: Bedroom, Double Garage and Granny Flat Prices

        Garage Conversion Cost NZ: Bedrooms, Bathrooms and Double Garages

        Free cost calculator

        How much will a garage conversion cost?

        Get an instant Auckland price range for your project — no details required to see it.

        Open the Garage Conversion Calculator →

        Quick answer: A garage conversion in Auckland starts from around $40,000 for a dry room such as a bedroom, office or gym. Adding a bathroom takes it to $80,000–$110,000, a self-contained single-garage unit runs $110,000–$145,000, and a double garage turned into a two-bedroom unit lands at $160,000–$220,000, build cost only.

        You’re staring at the garage. The car’s parked on the drive most weeks anyway. What if that space became a teenager’s bedroom, a home office, a rental income stream, or somewhere for your mum to live closer without moving in?

        The first question is always the same: what’s it actually going to cost? You’ve probably already pulled up a few ranges online, and they run from about $30,000 to well past $200,000. Useful as a wall poster. Useless for planning. Once you’ve got a budget in mind, see how we turn an Auckland garage into a consented, habitable room, from the first drawing to the final inspection.

        What you need is a number that fits your garage. Your section. Your conversion type.

        That’s what this calculator gives you.


        Get Your Personalised Estimate

        A short set of questions about your project, then where to send the result. Free, and no obligation.

        Open Garage Conversion Cost Calculator →


        How Much Does a Garage Conversion Cost in NZ?

        The type of room you’re creating sets the price far more than the size of the garage does. These are the bands Superior Renovations publishes for Auckland: the starting point on our renovation FAQ, and the project bands in our garage to granny flat cost and consent guide.

        What you’re creating Typical floor area Build cost (Auckland)
        Dry room in a single garage: bedroom, office, gym or studio 18–22m² From around $40,000, typically $40,000–$60,000
        Habitable room, no kitchen or bathroom ~30m² $55,000–$80,000
        Habitable room with a bathroom ~30m² $80,000–$110,000
        Self-contained unit with kitchen and bathroom ~30m² $110,000–$145,000
        Double garage to a two-bedroom unit ~50–60m² $160,000–$220,000
        New detached granny flat instead of converting Up to 70m² $180,000–$260,000

        Those are build costs, and they leave three things out. Design and consent typically add $10,000–$20,000. A self-contained unit with its own kitchen can trigger Auckland Council Development Contributions of $5,000–$20,000 depending on the zone. And foundation remediation or a drainage pump system sits outside the bands too, which is why we tell people to hold a 10–15% contingency on top of any quoted figure.

        Notice the two-bedroom row needs 50–60m². A standard double garage is 36–40m², so measure yours before you plan for two bedrooms.


        Why a Calculator Beats a Generic “Per m²” Estimate

        On our own published bands, an Auckland garage conversion runs from around $40,000 for a bedroom to $220,000 for a two-bedroom unit. That’s accurate. It’s also useless for budget planning.

        The range is that wide because “garage conversion” covers wildly different projects. Converting a single garage into a teenager’s bedroom on a flat section in Albany sits at the bottom. Turning a double garage into a self-contained granny flat with kitchen, bathroom, and separate entry on a leaky-era home in Glen Eden sits near the top. Both are “garage conversions in Auckland.” Both sit inside that spread. They cost vastly different amounts.

        The headline range alone doesn’t tell you which one you are.

        That’s where the calculator earns its keep. Instead of giving you a number that covers everyone, it asks the specific questions that move your number, type of room, size of garage, whether you need plumbing, the condition of what’s already there, and narrows the range to the kind of project you’re actually planning.

        It takes a few minutes, and what it gives you isn’t a quote. More on that below.


        What Goes Into the Estimate

        The calculator works through the same variables we look at when we price a real project. Each one is a genuine cost driver, and below is roughly what each does to the number.

        Type of conversion. This is the single biggest driver. A dry-room conversion (bedroom, study, gym) starts from around $40,000. Add a bathroom and you’re at $80,000–$110,000. A self-contained unit with kitchen, bathroom and separate entry runs $110,000–$145,000 in a single garage, and $160,000–$220,000 as a two-bedroom unit. The jump isn’t linear: wet areas need plumbing, drainage connections, waterproofing, ventilation and higher-spec fixtures.

        Size of the garage. Single garages typically run 18–22m². Double garages 36–40m². A double conversion costs more in absolute terms but the per-m² rate often comes down because fixed costs (consent fees, design, structural assessment) spread across more floor area.

        Foundation and floor condition. Most garage slabs were never designed for habitable use: often no damp-proof membrane and no insulation underneath. Bringing the floor up to habitable standard means either insulating over the existing slab (you lose ceiling height) or breaking out and re-pouring, which we’d budget at roughly $8,000–$15,000 as an indicative planning figure. A slab that sits below the surrounding ground is harder again, because getting drainage to work around it gets complicated quickly.

        Insulation and weathertightness. Turning a garage into habitable space brings the H1 energy-efficiency clause into play, so walls, ceiling and floor all have to hit current R-values. The current documents (H1/AS1 and H1/VM1, 6th edition) took effect on 27 November 2025, and the previous 2022 editions stay valid only for consents lodged up to 26 November 2026 — worth asking which edition your design is being drawn to. Most garages were never lined or insulated in the first place, so plan on insulating the lot. Our guide to insulating an NZ home covers the products and where each one goes.

        Plumbing and electrical. Running new water, waste and drainage to a detached garage costs more than to an attached one. On a self-contained unit, the longer runs and separate connections can add $10,000–$25,000 over the same conversion on an attached garage, and a low-lying site that can’t get fall to the sewer may need a pump system as well, at $4,000–$8,000 plus ongoing maintenance. Electrical needs to be brought up to current Standards and usually means a new sub-board.

        Finish level. Standard GIB and vinyl, or feature timber lining and engineered flooring? On a 30m² self-contained conversion, interior finishes (flooring, painting, ceiling, joinery) typically run $12,000–$18,000 at a standard spec. Feature linings and premium flooring push that line up fast.

        💡 Quick tip: The cheapest conversion isn’t always the smartest one. A $60K dry-room conversion can become a $120K rework two years later when you realise you needed a bathroom. Plan for what the space will actually do, not just what you can afford this year.


        See Your Personalised Number

        Room type, size, plumbing and condition: the four inputs that move the number most.

        Open Garage Conversion Cost Calculator →


        Converting your garage?
        Open the calculator →

        What the Calculator Gives You, and What It Can’t

        The calculator asks a short set of questions about your project, then where to send your result. Treat what comes back as a planning range, not a price.

        It’s not a quote. Quotes need site visits, drawings, and detailed scope. The estimate is the layer before that: the number that tells you whether your project sits in a budget you can work with, or whether you need to rescope before going further.

        Check what any number leaves out. The bands on this page are build costs. Design and consent fees, Development Contributions on a self-contained unit, resource consent if your plans breach a zone rule, and anything hiding under the slab or behind the existing lining all sit outside them. We’d rather flag the limits than pretend they don’t exist.

        If the number looks workable, the next step is usually a feasibility consultation, where we walk through your specific garage, what you’re trying to achieve, and what’s realistic on your section. The consent drawings come from Sonder Architecture, our architectural division, so the people drawing your garage work alongside the team that builds it. That conversation comes after you’ve seen the estimate, not before.


        Single, Double or Detached: What Your Garage Type Changes

        Two things about your garage set the shape of the whole project before anyone talks about finishes: how big it is, and whether it is attached to the house.

        Single Garage Conversions (roughly 18–22m²)

        A single garage gives you one good room. A bedroom, a home office, a gym, a studio. It is the cheapest conversion available and it sits at the bottom of the $40,000–$60,000 dry-room band, but the per-square-metre rate is the highest of any conversion type, because the consent, design and structural assessment cost the same whether you are converting 20m² or 40m².

        If you want a bathroom in a single garage, be realistic about what is left. Take out 3–4m² for a compact bathroom and the habitable room that remains is small. That is usually the point at which people either accept a dry room or start looking at the double.

        Double Garage Conversions (roughly 36–40m²)

        This is the footprint that makes a genuinely self-contained unit work: open-plan living, a bedroom, a bathroom and a kitchenette without any of it feeling like a corridor. It also spreads the fixed costs across twice the floor area, so the per-m² rate drops even though the total goes up. Two bedrooms is the stretch: our published band for a two-bedroom unit is $160,000–$220,000 at 50–60m², which is more floor area than a standard double, so a disciplined layout and smaller rooms are the price of fitting both in.

        Attached vs Detached: The Services Question

        An attached garage is almost always the cheaper conversion, and the reason is plumbing rather than structure. Water, waste and drainage are already a few metres away, and the wall between garage and house is often already close to a habitable build-up.

        Concept plans · three layouts, one shell
        Layout is the biggest number the calculator cannot see
        Existing
        Option 1
        Option 2
        Option 3
        Three arrangements of one double garage. The shell costs the same in all three; the plumbing, the number of internal walls and the amount of new glazing do not. Use the calculator for the envelope, then let the layout decide the rest. Concept plans by Sonder Architecture. Concept only, not consent documentation.

        A detached garage at the back of the section is a different job. Water, waste and drainage have to be trenched out to it, and on a self-contained unit those longer runs and separate connections can add $10,000–$25,000 over the same conversion on an attached garage, before anything happens inside the building. Power usually means a new sub-board and a run out to the structure. Detached conversions also tend to be the ones that hit boundary, height-to-boundary and impervious-area rules, because they sit near the edge of the section.

        Garage Typical footprint What it realistically becomes Band
        Single, attached 18–22m² One good room: bedroom, office, gym $40,000–$60,000
        Single, with bathroom 18–22m² Bedroom plus compact bathroom, tight $80,000–$110,000
        Double, attached 36–40m² Self-contained unit with room to move; two bedrooms only in a larger garage $110,000–$220,000
        Detached, any size — Add services trenching and boundary-rule risk +$10,000–$25,000 on services for a self-contained unit

        Converting a Garage Into a Bedroom

        This is the most common brief we get, and it is the cheapest useful thing a garage can become. There is no plumbing, no drainage, no waterproofing, so the whole wet-area cost jump never happens.

        What it still needs, and what people underestimate: the slab has to come up to habitable standard, which means either insulating over it and losing ceiling height, or breaking it out and re-pouring (allow roughly $8,000–$15,000 as an indicative figure). The walls, ceiling and floor all have to meet current H1 R-values. The garage door opening usually becomes a window or a wall, and that changes both the structure above it and the look of the street frontage. Ventilation and natural light have to satisfy the Building Code for a habitable room, which a garage was never designed to do.

        💡 Quick tip: Check your ceiling height before you fall in love with the idea. Insulating over an existing slab eats 100mm or more, and a garage that started low can end up below the height a habitable room needs. Measure first, design second.

        Whether the finished room can be rented, and whether it counts as a separate dwelling for rates and consent purposes, is a question for Auckland Council or a Licensed Building Practitioner rather than a calculator. If you are weighing the conversion against other ways of adding a room, our guides to converting a garage into a granny flat, container homes versus regular granny flats, and the cost of building a new garage cover the alternatives. If losing the garage is the sticking point, our garage build cost guide prices putting a replacement elsewhere on the section.


        Converting a Garage Into a Kitchen, Studio, Gym or Living Area

        Bedrooms get the most enquiries, but plenty of people want something else from the space. One rule holds across all of them: dry rooms are cheap, wet rooms are not, and a kitchen changes what the building is.

        Garage to Home Office, Studio or Gym

        Price these like a bedroom. There’s no plumbing, so they sit in the same dry-room band that starts from around $40,000, and the same slab, insulation, light and ventilation work applies once you intend to use the space as a habitable room. A gym is the one to think twice about. Heavy plates on a slab that’s been insulated over need a floor build-up that can take the load, so tell the designer what you’ll be lifting before the floor is specified.

        Not every gym or workshop has to become a habitable room. Our granny flat guide treats a space with no plumbing that nobody sleeps or works in full-time as non-habitable, which is a smaller and cheaper job. Whether yours qualifies is a question for Auckland Council or a Licensed Building Practitioner, not a calculator.

        Converting a Garage Into a Kitchen

        Adding a kitchen is where the project changes category. A garage with its own kitchen and bathroom is a self-contained unit, which runs $110,000–$145,000 in a single garage on our published bands, and in Auckland a second self-contained unit commonly brings resource consent and Development Contributions into play alongside the building consent. If what you actually want is a second cooking space for the main house, such as a scullery or an entertaining kitchen off the living area, say so at the design stage, because how the space is classified changes the consent path. Check your zone with Auckland Council or ask us before you draw it.

        Garage to Living Space: Extending the House Into It

        An internal or attached garage that opens straight into the house is the easiest conversion to make feel like part of the home. Widen the internal doorway and the garage becomes a family room, rumpus or second lounge, with services close by and no separate entry to build. The wall you open up is the structural question. If it’s load-bearing, get an engineer and an LBP involved before anyone picks up a saw, and expect the beam to be part of the consented work. Attached conversions can also need a fire-rated wall between the new room and the rest of the house, depending on the design.

        Half a Garage: Converting One Bay of a Double

        Keeping one car bay and converting the other is a popular compromise where the section has nowhere else to park. Just don’t expect half the garage to cost half as much. The design, consent and structural assessment cost much the same whatever the floor area, and you’re adding a new wall between the room and the remaining car bay, built to habitable-room standard on the room side. Per square metre, a half conversion is one of the more expensive ways to add a room, so price the full double before you rule it out.


        The Three Variables That Move Your Number the Most

        If you’ve used the calculator and want to understand what drove your result, these three factors do most of the heavy lifting.

        1. Whether you’re adding plumbing. The single biggest jump in cost is the leap from a dry room to a wet one. On our published bands, adding a bathroom takes a project that starts from around $40,000 to $80,000–$110,000, and adding a kitchen as well takes a single-garage unit to $110,000–$145,000. If the goal is just usable floor space, a dry-room conversion gives you the best return per dollar. If you’re going self-contained, expect the budget to roughly double or more.

        2. Condition of the existing structure. Garages weren’t built to habitable standard. A garage with a sound slab, intact roof, good wall framing and services nearby converts faster and cheaper. A tired garage with rotting bottom plates, a cracked slab or old fibre-cement cladding can soak up a big share of the budget before the conversion proper even starts, and anything that might contain asbestos needs testing before anyone cuts into it. Our guide to asbestos testing and removal in an Auckland renovation explains who tests, who pays and what happens next. Get a builder to assess the structure before you commit to a budget.

        3. Labour, and how it’s priced. Qualified trades in Auckland charge $120–$150 an hour, the rate Superior Renovations publishes on its FAQ, and a conversion runs a builder, electrician, plumber, gib stopper and often a tiler in sequence. A fixed-price quote can look higher than a charge-up estimate because the builder is carrying the risk of whatever turns up behind the lining. On a charge-up job, that risk sits with you.

        Where the money goes on a self-contained conversion. Our granny flat guide breaks a $130,000, 30m² self-contained build down like this: bathroom $22,000–$28,000, kitchenette with appliances $18,000–$28,000, slab works, linings, insulation and weather membrane $25,000–$35,000, plumbing and electrical $15,000–$22,000, glazing and joinery to replace the garage door $12,000–$18,000, and interior finishes $12,000–$18,000.

        Knowing which of these three is the biggest factor on your garage tells you where to focus when you’re trying to bring the number down, or where to brace yourself if it has to stay where it is.


        Convert the Garage, or Demolish and Build New?

        This question matters more in 2026 than it did a year ago.

        In January 2026, the Schedule 1A granny flats exemption came into force. According to MBIE’s Building Performance guidance, a small standalone dwelling of up to 70m² can be built without a building consent if it has a simple design and meets the Building Code, the homeowner notifies council before building starts and once it’s complete, the work is carried out or supervised by licensed building professionals, and every exemption condition is met. That’s a structural shift in the economics of adding a second dwelling to your property.

        Here’s the awkward bit: the exemption applies to building new, not to converting existing structures. A garage conversion still triggers building consent because it changes the use of an existing building, involves structural alterations, and almost always involves plumbing and electrical work.

        Which means homeowners now have a genuine choice:

        Convert the existing garage. Cheaper if the garage is in good condition. Faster start. Keeps the existing footprint. Consent required. From around $40,000 to $220,000 depending on scope.

        Demolish the garage and build a new exempt dwelling of up to 70m². Higher upfront cost: our published band is $180,000–$260,000 for the build. But no building consent and no consent processing wait, more floor area, and standalone status. You still apply for a project information memorandum (PIM), notify council before and after, and pay any development contributions, and resource consent is a separate question that depends on your zone. The numbers can work out closer than they look once you factor in the consent timeline avoided.

        The break-even point depends heavily on the condition of the existing garage. If it’s structurally sound with good services nearby, convert. If it’s rotten, undersized, or full of asbestos, the new-build pathway can be the cleaner answer.

        The calculator gives you the conversion estimate. If you want to weigh that against a new-build SSAD option, that’s worth a feasibility conversation before you commit to either path.


        Get Your Free Estimate Now

        Free, no obligation, and built around the same variables this page walks through.

        Open Garage Conversion Cost Calculator →

        ➡ Book your free in-home consultation with Superior Renovations
        ➡ Work out your own number with the garage conversion cost calculator
        ➡ Request a free feasibility report for your project


        Frequently Asked Questions

        Is the garage conversion cost calculator free?

        Yes. There's no charge and no obligation. Superior Renovations built it so Auckland homeowners can get a realistic starting range for a garage conversion before they talk to anyone. It asks a short set of questions about your project and where to send the result, and what it gives you is a planning figure rather than a quote.

        How accurate is the estimate?

        Accurate enough for budget planning and feasibility, not for signing a contract. It works from the variables that genuinely move the price, such as the type of room, the garage size, plumbing and the condition of the building, but it cannot see your slab, your drainage fall or what's behind the existing lining. Final pricing needs a site visit, drawings and a detailed scope.

        How much does a garage conversion cost in Auckland?

        On Superior Renovations' published bands, a dry room such as a bedroom, office or gym starts from around $40,000. A habitable room with a bathroom runs $80,000–$110,000. A self-contained single-garage unit with kitchen and bathroom runs $110,000–$145,000, and a double garage converted to a two-bedroom unit of 50–60 square metres runs $160,000–$220,000. Those are build costs; design and consent typically add $10,000–$20,000.

        Does a garage conversion require building consent in Auckland?

        Yes, almost every garage conversion needs building consent because it changes the use of the structure from non-habitable to habitable and usually involves structural, plumbing and electrical work. Budget $10,000–$20,000 for design and consent together, and check Auckland Council's building control fees for the council's share. Resource consent is separate: it applies if the design breaches a zone rule such as a boundary or height-to-boundary standard, and is commonly needed when the garage becomes a second self-contained unit.

        Can I use the new Schedule 1A granny flats exemption for a garage conversion?

        No. According to MBIE's granny flats exemption guidance, the Schedule 1A exemption covers small standalone dwellings of up to 70 square metres, not the conversion of an existing structure. If your garage is in poor condition, demolishing it and building a new exempt dwelling can be the cleaner path. You skip building consent, but you still notify council before and after the build, apply for a PIM, and use licensed building professionals.

        What's the difference between a garage conversion and a granny flat?

        A garage conversion means turning an existing garage into habitable space, which can be a single room, a bedroom-plus-bathroom, or a fully self-contained unit. A granny flat is the self-contained unit at the top end of that spectrum, with its own kitchen, bathroom, and separate entry. Not every garage conversion is a granny flat. Every granny flat conversion is a garage conversion.

        How much does a double garage conversion cost?

        It depends on what goes in it. A standard double garage is 36–40 square metres, enough for a one-bedroom self-contained unit with a real bedroom, bathroom and kitchen. Superior Renovations' published band for a two-bedroom self-contained unit of 50–60 square metres is $160,000–$220,000, build cost only, so two bedrooms usually needs a larger-than-standard garage. A double converted to dry rooms only, such as a bedroom and a rumpus, costs far less because there's no wet-area work.

        Does the estimate include GST and consent fees?

        Treat the bands on this page as build cost only. Design and consent fees (typically $10,000–$20,000), Auckland Council Development Contributions on a self-contained unit ($5,000–$20,000 depending on the zone), foundation remediation and drainage pump systems are extra. When you compare a calculator figure with a builder's quote, check whether each one includes GST, because a 15% difference is easy to mistake for a cheaper builder.

        How long does a garage conversion take?

        Superior Renovations puts a typical Auckland garage conversion at 4–12 weeks on site, driven mostly by whether you're adding a bathroom and a kitchen. Design and building consent come before that and take time of their own, so the whole project from first drawing to finished room runs longer than the build itself. A dry-room bedroom conversion sits at the short end of that range.

        How much does it cost to convert a garage into a kitchen or studio?

        A studio, home office or gym has no plumbing, so it prices like a bedroom, from around $40,000. A kitchen changes the category: a garage with its own kitchen and bathroom is a self-contained unit, which runs $110,000–$145,000 in a single garage on Superior Renovations' published bands, and in Auckland it commonly brings resource consent and Development Contributions into play. Confirm your zone with Auckland Council before you design one.

        How much does it cost to convert a garage into a bedroom in NZ?

        A dry-room conversion, which is what a bedroom is, sits at the bottom of the range, from around $40,000 and typically $40,000-$60,000 for a single garage in Auckland. There is no plumbing, drainage or waterproofing, so you avoid the biggest cost jump in the whole project. The work that remains is bringing the slab up to habitable standard (insulating over it, or breaking out and re-pouring at roughly $8,000-$15,000 as an indicative figure), meeting current H1 R-values in the walls, ceiling and floor, closing in or reworking the garage door opening, and satisfying the Building Code on ventilation and natural light.

        Is it cheaper to convert an attached or a detached garage?

        Attached, almost always, and the reason is services rather than structure. Water, waste and drainage are already metres away on an attached garage. On a self-contained unit, the longer runs and separate connections to a detached garage can add $10,000-$25,000 over an equivalent attached conversion, a low-lying site may need a pump system at $4,000-$8,000, and power usually means a new sub-board plus a run out to the structure. Detached garages are also the ones that most often run into boundary, height-to-boundary and impervious-area rules, because they sit near the edge of the section.


        Please note: Cost factors vary project to project, and the calculator’s accuracy depends on the inputs you provide. The estimate is a planning tool, not a quote. Rates and material costs shift with the market, and final project pricing requires a site visit and detailed scope assessment of the existing garage. While information is considered current at the date of publication, Superior Renovations isn’t liable for any decisions made solely on the calculator output.


        Further Resources for your garage conversion

        1. Featured projects and Client stories to see specifications on some of the projects.
        2. Real client stories from Auckland

        Need more information?

        Take advantage of our FREE Complete Home Renovation Guide (48 pages), whether you’re already renovating or in the process of deciding to renovate, it’s not an easy process, this guide which includes a free 100+ point check list – will help you avoid costly mistakes.

        Download Free Renovation Guide (PDF)


        18 months 0 percent interest long term finance badge

        Have you been putting off getting renovations done?

        We have partnered with Q Mastercard ® to provide you an 18 Month Interest-Free Payment Option, you can enjoy your new home now and stress less.

        Learn More about Interest-Free Payment Options*

        *Lending criteria, fees, terms and conditions apply. Mastercard is a registered trademark and the circles design is a trademark of Mastercard International Incorporated.

         

         


        Still have questions unanswered?

        Book a no-obligation consultation with the team at Superior Renovations, we’d love to meet you to discuss your renovation ideas!

          Services

          Home RenovationKitchen RenovationBathroom RenovationOutdoor RenovationHouse ExtensionCommercialDesign ServicesOther

          By submitting this form, you agree to receive communications from us via email or text regarding our services, you can unsubscribe at any time.

          This site is protected by reCAPTCHA and the Google

          Privacy Policy and Terms of Service apply.


          References

          1. Building Performance (MBIE) — Check if you need consents
          2. Building Performance (MBIE) — Granny flats exemption guidance (Schedule 1A)
          3. Building Performance (MBIE) — H1 Energy Efficiency, current editions
          4. Auckland Council — Building control fees and charges
          Hamptons-style kitchen with white shaker cabinetry, a marble-look island with VJ panelling and brass pendant lights
          Design Department, Kitchen Renovation

          Hamptons Style Homes in NZ: The Look, the Cost and Getting It Right

          Hamptons style is a design direction, not a price tier. You’re paying for a quality kitchen or full-home renovation, then choosing the finishes that give it the look: shaker cabinetry, marble-look benchtops, panelled walls and a soft, coastal palette. In Auckland a Hamptons kitchen sits in the same range as any quality kitchen reno, roughly $30,000–$50,000 and up, with the style set by the details rather than a premium on the label.

          The Hamptons look travelled a long way to get here, from the beach houses of Long Island to Auckland renovations. Done with restraint it’s timeless and it suits our villas and weatherboard homes beautifully. Done as a copy-paste of a US Pinterest board, it reads as pastiche. Here’s how to get the look right in a New Zealand home, and what it actually involves.

          Free tool
          Estimate your Hamptons kitchen or renovation

          Open the kitchen cost calculator →

          Hamptons-style kitchen with white shaker cabinetry, a marble-look island with VJ panelling and brass pendant lights

          Illustration: a Hamptons-style kitchen with white shaker cabinetry, a marble-look island with VJ panelling and a warm oak floor.

           

          Get the look: Hamptons kitchen:

          A genuine Hamptons kitchen comes down to a short list of details, done well. Start with shaker cabinetry — flat-panel doors with a recessed centre, painted rather than raw timber, since the paint finish is what makes or breaks the look. Pair it with a marble-look benchtop in engineered stone, which gives the classic veined look without the maintenance of real marble. Add VJ panelling on an island end or splashback for texture, brushed nickel or brushed brass tapware and cup-pull handles for the hardware, and a farmhouse or apron-front sink as the centrepiece. Ground the whole room with wide engineered oak flooring in a warm mid-tone, so the palette doesn’t feel cold in Auckland’s cooler light.

          For colour, Resene’s Hamptons range is the reference point for New Zealand homes: soft off-whites like Resene Black White, Resene Sea Fog or Resene Merino for walls, ceilings and trims, with a coastal blue such as Resene Coast, Resene Biscay or Resene Blue Night reserved for cabinetry or a single feature wall. Keep the palette to two or three tones repeated through the room — that restraint is what separates an elegant Hamptons kitchen from an over-themed one.


          What actually defines Hamptons style?

          Strip away the marketing and Hamptons comes down to a handful of consistent elements. It’s relaxed coastal elegance – light, classic, and built around natural materials.

          • Shaker cabinetry. Flat-panel doors with a recessed centre, usually in white or a soft muted tone. This is the signature.
          • Marble or marble-look benchtops. Classic veined stone, or an engineered stone that mimics it, over timber or painted joinery.
          • Panelling. VJ or board-and-batten wall panelling adds the coastal-classic texture, on an island end, a splashback, or feature walls.
          • A soft, muted palette. Whites, warm neutrals, soft greys and blues, grounded with natural timber floors.
          • Classic fixtures. Brushed nickel or brass tapware, pendant lighting, a farmhouse or apron sink, Shaker-profile detailing.

          The thread through all of it is restraint. Hamptons is classic, not busy – a few quality materials repeated, not every coastal cue at once.


          Hamptons in a New Zealand home – what to keep, what to adapt

          The look was born in a US summer-house climate, so it pays to translate rather than copy.

          • It suits our housing stock. Villas, bungalows and weatherboard homes already have the bones – high ceilings, timber floors, classic proportions – that Hamptons flatters. It sits far more naturally here than in a hard-edged modern box.
          • Adapt for the NZ climate. Auckland’s humidity is hard on cheap painted joinery and porous surfaces. Quality cabinetry, durable engineered stone and proper ventilation matter more here than the aesthetic alone.
          • Keep it warm, not stark. The all-white version can feel cold in a NZ winter. Timber floors, warm neutrals and layered lighting keep it liveable rather than showroom-cold.
          • Avoid pastiche. The difference between elegant and theme-park is restraint and quality of finish. One or two strong Hamptons moves, executed well, beats a checklist of coastal clichés.

          Which New Zealand homes wear Hamptons best?

          Hamptons sits most naturally on the homes it visually rhymes with. A weatherboard villa or bungalow already has the vertical proportions, timber floors and classic joinery the style was built around, so a Hamptons kitchen or bathroom feels like it belongs rather than like a costume. That is why it has become one of the most requested looks for character-home renovations across the older Auckland suburbs.

          A 1970s or 80s brick-and-tile home takes a bit more work. The bones are lower and squarer, so the look leans harder on internal joinery, panelling and palette to carry it, and a brick exterior does not speak the same language as white weatherboard. Some owners go as far as re-cladding to a bevel-back weatherboard profile to get the full exterior look. That is a significant job, and because it affects the weathertightness of the building it can require building consent, so it is worth pricing and planning properly rather than treating as a cosmetic change. Auckland Council sets out when that kind of work needs consent.


          What does a Hamptons renovation cost in Auckland?

          Because Hamptons is a style, not a scope, it costs what the underlying renovation costs – the look comes from the finishes you choose. A Hamptons kitchen in Auckland lands in the normal kitchen range: expect around $30,000–$50,000 for a 10–12m² kitchen, at roughly $2,500–$4,000 per square metre, with higher-end builds running well beyond that. Take the style through a full home and you’re into full-renovation territory.

          Where the Hamptons choices move the number:

          • Cabinetry. Shaker doors and painted or timber joinery cost more than flat slab fronts. This is the biggest style-driven line.
          • Benchtops. Marble is premium and needs sealing; marble-look engineered stone gives the look for less and wears better.
          • Panelling and detailing. VJ panelling, cornices and Shaker profiles add joinery and paint time.

          These are indicative figures to plan around, not a fixed quote. For a number built on your own kitchen, start with the kitchen cost calculator, and our kitchen renovations page covers the wider process.


          Where Hamptons works: kitchen, bathroom, or whole home

          The style scales. A Hamptons kitchen is the most popular entry point – it’s where the shaker cabinetry and island do the most work. A Hamptons bathroom leans on panelling, classic tapware and a freestanding bath. Taken through a full home renovation, it becomes a cohesive language of trim, palette and joinery from room to room.

          We’ve delivered plenty of classic and classic-contemporary kitchens and bathrooms across Auckland that lean on the same principles – quality joinery, timeless palettes, and restraint over trend-chasing. You can browse the finishes in our kitchen design gallery and see completed work in our project case studies.


          The Hamptons palette, done for New Zealand light

          Getting the colours right is what separates a genuine Hamptons home from a white kitchen with a couple of blue accents. The palette is deliberately narrow: crisp and warm whites, soft greys, and the signature coastal blues, grounded by natural timber. Resene, whose colour team has documented the look for New Zealand homes, builds it around soft off-whites such as Resene Black White, Resene Sea Fog and Resene Merino for walls, ceilings and trims, with the blues coming through on cabinetry, a hero wall or accents.

          On the exterior, Resene’s Hamptons schemes lean on weatherboard tones like Resene Half Delta or Resene Half Periglacial Blue with crisp white trims, which is exactly the palette that flatters an Auckland weatherboard villa. Inside, deeper coastal blues such as Resene Coast, Resene Biscay or Resene Blue Night give a Hamptons kitchen or bathroom its depth without tipping into nautical theme-park. One adjustment is worth making for our light: New Zealand’s cooler winter light can make a stark blue-white feel cold, so warmer whites and a timber floor keep the room liveable. Resene’s Hamptons colour guides are a good place to test combinations before you commit.


          The details that carry a Hamptons room

          Hamptons is a style of details, and it is the details, not the floor plan, that most people get wrong. A few carry more weight than the rest.

          • Panelling. VJ (tongue-and-groove) or board-and-batten on an island end, a splashback, or a bathroom wall is one of the quickest ways to read as Hamptons. Used on one or two surfaces it adds texture; wrapped around every wall it becomes too much.
          • Trims and cornices. A generous skirting, a Shaker-profile door and a classic cornice do a lot of quiet work. This is where the look either feels considered or feels flat.
          • Tapware and hardware. Brushed nickel or aged brass, cup-pull handles and a farmhouse or apron-front sink are the jewellery of a Hamptons kitchen. Keep the metals consistent through the room.
          • Flooring. Wide engineered oak boards in a warm mid-tone ground the palette and stop a white room feeling clinical. This matters more in New Zealand light than the coastal imagery suggests.

          None of these is expensive on its own, but together they are the difference between a kitchen that happens to be white and a room that is unmistakably Hamptons. Pick the two or three that suit your space and spend on getting them crisp rather than scattering all of them thinly.


          Getting the look right

          The homes that pull Hamptons off well tend to share three habits:

          • They commit to quality joinery. Shaker cabinetry lives or dies on the crispness of the doors and the paint finish. It’s the wrong place to save.
          • They keep the palette disciplined. A tight set of two or three tones, repeated, reads as considered. Too many competing colours breaks the calm.
          • They design it as a whole. Hamptons is about cohesion – cabinetry, benchtop, tapware, flooring and lighting all speaking the same language. That’s exactly the kind of decision our Design Studio team works through before anything is built.

          The mistakes that tip Hamptons into pastiche

          The line between elegant and theme-park is thinner than most people expect, and the same handful of missteps show up again and again.

          • Too many coastal cues at once. Shiplap, rope, anchors, five shades of blue and a driftwood sign in one room reads as a stage set. Pick two or three strong moves and let them breathe.
          • The wrong white for our light. A cool, stark white that looks crisp in a Long Island summer can feel grey and cold in an Auckland winter, which is why Resene’s Hamptons palettes lean on warmer off-whites.
          • Cheap joinery. Shaker cabinetry lives or dies on the crispness of the door and the quality of the paint finish. A budget shaker front in the wrong paint is the fastest way to make a whole room look like an imitation.
          • Overdoing the blue. The blues are an accent, not the base. When they take over, the calm that makes Hamptons work disappears.

          Restraint is the whole discipline. A few quality materials, a tight palette, and clean detailing beat a checklist of coastal clichés every time.


          Plan the whole scheme before you build

          Hamptons is a language of cohesion, so it works best when the cabinetry, benchtop, tapware, flooring, panelling and palette are decided together rather than chosen one at a time on the fly. That is where a design-led process earns its keep: seeing the whole scheme drawn up and costed before anything is ordered means the blues, whites and timbers resolve into one room instead of four competing decisions. Our Design Studio works this through with you first, and where a project involves layout changes or a re-clad we bring in the team at Sonder Architecture for the design and consent side.


          Bringing Hamptons style to your Auckland home

          Hamptons is one of the few styles that genuinely suits New Zealand’s classic homes and still feels current. The key is quality finishes and restraint, planned properly from the start.

          → Estimate the cost with our kitchen cost calculator
          → Explore the process in our Auckland kitchen renovations guide
          → Request a free feasibility report to plan your renovation with our team


          What is Hamptons style?

          Hamptons style is a relaxed coastal-classic look originating from the beach homes of Long Island, New York. In a home it means shaker cabinetry, marble or marble-look benchtops, wall panelling, a soft muted palette of whites, neutrals and blues, natural timber floors, and classic fixtures like brushed nickel or brass tapware and pendant lighting. The thread is restraint and quality over busyness.

          How much does a Hamptons kitchen cost in NZ?

          Because Hamptons is a style rather than a scope, a Hamptons kitchen costs what a quality kitchen renovation costs. In Auckland that is roughly $30,000-$50,000 for a 10-12m2 kitchen, at about $2,500-$4,000 per square metre, with premium builds running higher. The Hamptons look mainly adds cost through shaker cabinetry, panelling and marble-look benchtops.

          Does Hamptons style suit New Zealand homes?

          Yes, particularly villas, bungalows and weatherboard homes, which already have the high ceilings, timber floors and classic proportions the style flatters. It is worth adapting for the NZ climate with durable joinery and good ventilation, and keeping the palette warm rather than stark so it stays liveable through winter.

          What is the difference between Hamptons and coastal style?

          They overlap, but Hamptons is the more formal, classic end of coastal. Coastal style is casual and beachy; Hamptons adds tailored elements like shaker cabinetry, panelling, marble and symmetrical, considered detailing. Think of Hamptons as coastal style dressed up for a classic home.

          What colours are used in Hamptons style?

          A soft, muted palette: crisp and warm whites, greige and warm neutrals, soft greys, and the signature soft blues, all grounded with natural timber. The look relies on a disciplined set of two or three tones repeated through the space rather than lots of competing colours.

          What cabinetry is used in a Hamptons kitchen?

          Shaker cabinetry is the signature - flat-panel doors with a recessed centre, usually painted white or a soft muted tone. Quality of the door profile and the paint finish is what separates an elegant Hamptons kitchen from a flat imitation, so it is not the place to cut the budget.

          Can you do Hamptons style on a budget?

          Partly. You can get the look for less with marble-look engineered stone instead of real marble, and painted MDF shaker fronts rather than solid timber. But the style leans on quality joinery and finish, so a very tight budget tends to show. It is better to do a smaller Hamptons project well than a large one cheaply.

          Is Hamptons style still in fashion?

          Hamptons is a classic rather than a trend, which is part of its appeal - done with restraint it has stayed popular for years and dates slowly. The versions that look tired are the over-themed ones. A disciplined, quality execution tends to stay looking current far longer than a fashion-led fit-out.


          Further resources


          Need more information?

          Take advantage of our FREE Complete Home Renovation Guide (48 pages), whether you’re already renovating or in the process of deciding to renovate, it’s not an easy process, this guide which includes a free 100+ point check list – will help you avoid costly mistakes.

          Download Free Renovation Guide (PDF)


          Long Term Finance badge offering 18 months interest free

          Have you been putting off getting renovations done?

          We have partnered with Q Mastercard ® to provide you an 18 Month Interest-Free Payment Option, you can enjoy your new home now and stress less.

          Learn More about Interest-Free Payment Options*

          *Lending criteria, fees, terms and conditions apply. Mastercard is a registered trademark and the circles design is a trademark of Mastercard International Incorporated.


          Still have questions unanswered?

          Book a no-obligation consultation with the team at Superior Renovations, we’d love to meet you to discuss your renovation ideas!

            Services

            Home RenovationKitchen RenovationBathroom RenovationOutdoor RenovationHouse ExtensionCommercialDesign ServicesOther

            By submitting this form, you agree to receive communications from us via email or text regarding our services, you can unsubscribe at any time.

            This site is protected by reCAPTCHA and the Google

            Privacy Policy and Terms of Service apply.


            References

            1. Resene — Hamptons living (colour inspiration)
            2. Resene — Bring the Hamptons home
            3. Habitat by Resene — Transforming your home into a Hamptons retreat
            4. Auckland Council — Building and consents
            Wet room bathroom with a single glass divider between the open shower and the vanity, a linear drain, a wall niche and a heated towel rail
            Bathroom Renovation

            Wet Room Bathrooms in NZ: Cost, Design and Waterproofing

            A wet room in Auckland usually sits in the mid-range bathroom band, about $25,000–$35,000, and up from there. It rarely comes in at the budget end, because the whole room gets tanked and tiled, not just the shower. Converting an existing bathroom to a doorless wet-area layout can be less. What you’re really paying for is waterproofing done right.

            A wet room is the most misunderstood bathroom in New Zealand. Done well, it’s the most usable room in the house. Done badly, it’s a leak waiting to happen. Here’s what one actually costs, what the Building Code requires, and how we build them so they last.

            Free tool
            Estimate your wet room or bathroom cost

            Open the bathroom cost calculator →

            Wet room bathroom with a single glass divider between the open shower and the vanity, a linear drain, a wall niche and a heated towel rail

            No step, no shower tray, no lip to catch a toe on — just a fully waterproofed floor doing all the work


            What is a wet room, exactly?

            A wet room is a fully waterproofed bathroom where the shower area is open to the rest of the room, with no step and often no screen or just a single pane of glass. The whole floor is tanked and tiled, laid to a gentle fall so water runs to a drain. There’s no shower tray and no lip to step over.

            That’s the difference from a standard bathroom, where waterproofing is concentrated in a contained shower. In a wet room the water can go anywhere, so the whole room has to be built to handle it. It’s also why a wet room feels bigger and cleaner-lined than a normal bathroom of the same size, and why it suits small bathrooms and accessible layouts so well. If step-free access is the priority, our accessible bathroom renovation guide goes deeper on that side of it.

            Level-entry wet room with a single floor waste, a wall-hung timber vanity, black shower fittings and a towel rail

            The tiled floor runs without a break from the shower zone into the rest of the room — the defining feature of a properly built wet room.


            What does a wet room cost in Auckland?

            We price wet rooms the way we price any bathroom, but the scope pushes them up the range. Here’s where they land against our 2026 Auckland bathroom bands:

            Scope Indicative cost
            Doorless wet-area layout within an existing bathroom $15,000–$25,000
            Full wet room, mid-range finish $20,000–$35,000
            Luxury wet room (premium tiles, heating, custom glass) $35,000–$65,000+

            Wet rooms sit mid-range and up because the whole room is tanked and tiled, not just the shower zone. The bigger cost drivers: full-room waterproofing, floor-to-ceiling tiling (stone runs $100–$150/m2 against ceramic at $30–$50/m2), the drainage falls, and custom glass. Labour is 40–50% of any bathroom budget, and a wet room is labour-heavy because every surface is a wet surface. These are indicative figures to plan around, not a fixed quote. Plug your own scope into the bathroom renovation cost guide and calculator for a closer read.


            Waterproofing is the whole game

            This is where a wet room is made or ruined. Because water isn’t contained to a tray, the entire floor and the lower walls have to be tanked and waterproofed to AS/NZS 3740 before a single tile goes down. Get the membrane, the falls to the drain, and the junctions right and it lasts decades. Get them wrong and you’re chasing a leak through the ceiling below.

            Three things we don’t cut corners on:

            • The fall to the drain. The floor has to be set to a consistent gradient so water always runs to the outlet, never pools. This is set in the substrate, before tiling.
            • Membrane continuity. The waterproof membrane has to be unbroken across the floor, up the walls, and around every penetration – the drain, the mixer, the niche.
            • The right substrate. In an older Auckland home with a timber floor, the substrate often needs work before it’s fit to tank. We check this before quoting, not after demo.

            Bathroom waterproofing and drainage is restricted building work, and reconfiguring a wet room can trigger a building consent (Auckland Council consent fees run about $500–$2,000). Confirm your own consent pathway with Auckland Council or a Licensed Building Practitioner. The waterproofing standard itself sits under the Building Code’s internal-moisture clause (E3) via Building Performance (MBIE).

            The standard behind all of this is the Building Code’s internal-moisture clause, E3, and its Acceptable Solution E3/AS1. According to BRANZ, the waterproof membrane has to run at least 25mm beyond the wet zone, shower walls are tanked to at least 1800mm above the floor, and any adjacent walls to at least 150mm. The membrane system itself must be BRANZ-appraised or CodeMark-certified and installed by a trained applicator, not improvised on site. That is the line between a wet room that lasts decades and one that fails in a few winters.


            Does a wet room need building consent?

            Often, but not always. A straight like-for-like bathroom refit usually does not need building consent. Turning a standard bathroom into a wet room frequently does, because you are almost always altering drainage and sometimes moving walls, and both sanitary plumbing and waterproofing are Restricted Building Work that has to be done or supervised by a licensed tradesperson.

            The waterproofing has to meet Building Code clause E3 either way. Where consent does apply, Auckland Council fees on a typical bathroom job run about $500 to $2,000, and the finished work is inspected and signed off before you get a Code Compliance Certificate. We work out the consent pathway for your specific job at quote stage, and where it needs design or consent input we bring in the team at Sonder Architecture. For the rules first-hand, Auckland Council covers consents and BRANZ’s Level guide sets out the statutory wet-area requirements.


            Wet room design that works in an NZ home

            A wet room can look like a hotel or feel like a wet, cold cave. The difference is in a few decisions:

            • Keep the rest dry. A single pane of glass or a smart layout keeps spray off the vanity and toilet while still feeling open. Fully doorless works best in larger rooms.
            • Heat it. Underfloor heating and a heated towel rail dry the room out fast, which matters in Auckland’s damp winters and keeps mould at bay.
            • Ventilate it. A wet room holds moisture, so a good extractor is non-negotiable.
            • Small rooms love it. Losing the shower tray and screen makes a small bathroom feel noticeably bigger, which is why wet rooms suit compact Auckland ensuites and villas.

            For the full range of layouts and finishes, our bathroom design ideas and the bathroom design gallery are worth a look.


            Will a wet room suit your home?

            Wet rooms earn their keep in two situations especially. The first is small bathrooms and ensuites, where losing the tray and screen buys back real floor space and makes a tight villa bathroom feel open. The second is accessibility. A step-free, doorless wet area is the most future-proof bathroom you can build, which matters if you are renovating a forever home or planning to age in place. Designing step-free access in now is far cheaper than retrofitting it later.

            Two honest caveats before you commit. A fully open wet room in a large family bathroom can leave the whole floor wet after every shower, so unless the room is genuinely big, a single pane of glass to keep the vanity and toilet dry is usually the smarter call. And an older Auckland home with a sprung timber floor needs its substrate checked before anything is tanked. We flag both at the quote, not halfway through the build. There is more on step-free layouts in our accessible bathroom guide.


            How we build a wet room, step by step

            Every wet room we build runs through the same sequence, and the order is what keeps water where it belongs.

            • Strip-out and substrate check. The old bathroom comes out and we assess the floor. In an older home the substrate often needs firming up or re-sheeting before it is fit to tank.
            • Plumbing and drainage set to the fall. The waste and the floor gradient go in first, so water always runs to the drain rather than pooling in a low spot.
            • Tanking. A continuous waterproof membrane goes over the floor and up the walls, sealed around the drain, the mixer and any niche, then left to cure. Nothing later in the build can make up for a rushed membrane.
              Grey waterproof membrane rolled across a bathroom floor and up the lower walls around the drain and mixer outlet, before tiling

              Step 2 — tanking. The membrane goes over the floor and up the walls, sealed around every penetration, and left to cure before a single tile is laid.

               

            • Tiling. Floor and walls are tiled onto the cured membrane, keeping the falls true so the finished floor drains cleanly and never ponds.
              Tiler setting large-format floor tiles with spacers around a floor drain in a bathroom build

              Step 3 — tiling. Floor and walls go onto the cured membrane, keeping the fall true so the finished floor drains cleanly and never ponds.

               

            • Fit-off and heat. Tapware, glass, heated towel rail and underfloor heating go in, the extractor is commissioned, and the room is checked over.
            • Sign-off. Where the job was consented it is inspected for its Code Compliance Certificate, and either way it goes through our quality-assurance check before handover.

            Keeping a wet room warm and dry

            A wet room holds more moisture than a standard bathroom because more of the room gets wet, so managing that moisture is part of the design, not an afterthought. Clause E3 of the Building Code is specifically about protecting the home from internal moisture, and in practice that means three things working together: a properly sized extract fan vented outside, underfloor heating and a heated towel rail to dry the room quickly, and tiling and joinery that shrug off damp. Get those right and an Auckland wet room stays warm and mould-free through winter. Skimp on ventilation and even a perfectly waterproofed room will feel clammy and grow mould in the grout.

            bathroom renovation north shore

            A fully tiled shower with a recessed niche and no hob at the entry. Getting the floor to fall correctly to the waste without a step is the whole job, and it is decided by the subfloor long before anyone picks a tile.

            One more point that is easy to overlook: because the whole floor gets wet, we specify slip-resistant floor tiles with a higher slip rating than you would use in a dry bathroom. It keeps a wet floor safe underfoot for young kids and older users, and it is a small choice that matters most in exactly the step-free, doorless layout a wet room is built around.


            Wet rooms we’ve built in Auckland

            We build wet-area bathrooms across Auckland, so this isn’t theory.

            In Westmere, we stripped out a character-home bathroom and rebuilt it around a generous wet area – moss-green feature tiling, floor-to-ceiling dark tile, a doorless custom-cut glass divider, matte gold tapware, and the whole room fully waterproofed to standard before tiling. The brief was “warm, not clinical,” and the wet-area layout is what made a modest room feel like somewhere to wind down. You can see it in our rustic wet-room project.

            In Torbay, a two-ensuite renovation used an open wet area with a bathtub and a doorless glass shower to give a sense of space, with underfloor heating and demister mirrors. It’s written up in our designer bathroom project on the North Shore.


            Thinking about a wet room?

            A wet room is one of the smartest ways to modernise a bathroom or squeeze more out of a small one – as long as the waterproofing is done properly. That starts with a realistic figure and a proper look at your space.

            → Estimate the cost with our bathroom cost calculator
            → Explore the options in our Auckland bathroom renovations guide
            → Request a free feasibility report for a measured quote from our team


            How much does a wet room cost in NZ?

            In Auckland, a full wet room typically costs $20,000-$35,000 at a mid-range finish, rising to $35,000-$65,000+ for premium tiles, heating and custom glass. A doorless wet-area layout within an existing bathroom can come in around $15,000-$25,000. Wet rooms sit higher than a standard bathroom because the whole room is tanked and tiled, not just the shower.

            What is the difference between a wet room and a normal bathroom?

            In a wet room the shower is open to the rest of the room with no tray and no step, and the entire floor is waterproofed and laid to a fall so water runs to a drain. A standard bathroom contains the water in a shower tray or enclosure. The wet room approach feels more open and suits small or accessible bathrooms.

            Are wet rooms a good idea in New Zealand?

            Yes, when they're built properly. They make small bathrooms feel bigger, suit step-free and accessible layouts, and are easy to clean. The catch is waterproofing - because water isn't contained, the whole room must be tanked to AS/NZS 3740. A wet room built by someone who cuts that corner is a leak risk, so the build quality matters more than in a standard bathroom.

            Do wet rooms leak?

            A properly built wet room does not leak. The whole floor and lower walls are tanked with a continuous waterproof membrane, laid to a fall to the drain, with every penetration sealed. Leaks come from poor waterproofing, a bad fall, or a broken membrane junction - all avoidable with the right build. That is why waterproofing is the part not to save money on.

            Do I need building consent for a wet room?

            Reconfiguring a bathroom into a wet room can trigger an Auckland Council building consent, especially if you move plumbing or walls. Bathroom waterproofing and sanitary plumbing is also restricted building work. A like-for-like refit may not need consent. Always confirm your situation with Auckland Council or a Licensed Building Practitioner before starting.

            Can you put a wet room in a small bathroom?

            Wet rooms are ideal for small bathrooms. Removing the shower tray and screen opens the space up and makes a compact room feel noticeably larger, which is why they suit small Auckland ensuites and villa bathrooms. A single glass pane can still keep the vanity and toilet dry.

            Do wet rooms need underfloor heating?

            It is not compulsory, but it is strongly recommended. Underfloor heating and a heated towel rail dry the room quickly, which matters in Auckland's damp winters and helps keep mould away. Paired with good ventilation, heating keeps a wet room warm and dry rather than cold and clammy.

            How long does it take to build a wet room?

            A wet room takes a little longer than a standard bathroom because of the full-room waterproofing and the time the membrane needs to cure before tiling. Most run a few weeks on site. Your project manager gives you a full timeline before work starts.


            Further resources


            Need more information?

            Take advantage of our FREE Complete Home Renovation Guide (48 pages), whether you’re already renovating or in the process of deciding to renovate, it’s not an easy process, this guide which includes a free 100+ point check list – will help you avoid costly mistakes.

            Download Free Renovation Guide (PDF)


            Long Term Finance badge offering 18 months interest free

            Have you been putting off getting renovations done?

            We have partnered with Q Mastercard ® to provide you an 18 Month Interest-Free Payment Option, you can enjoy your new home now and stress less.

            Learn More about Interest-Free Payment Options*

            *Lending criteria, fees, terms and conditions apply. Mastercard is a registered trademark and the circles design is a trademark of Mastercard International Incorporated.


            Still have questions unanswered?

            Book a no-obligation consultation with the team at Superior Renovations, we’d love to meet you to discuss your renovation ideas!

              Services

              Home RenovationKitchen RenovationBathroom RenovationOutdoor RenovationHouse ExtensionCommercialDesign ServicesOther

              By submitting this form, you agree to receive communications from us via email or text regarding our services, you can unsubscribe at any time.

              This site is protected by reCAPTCHA and the Google

              Privacy Policy and Terms of Service apply.


              References

              1. Building Performance (MBIE) — E3 Internal Moisture
              2. BRANZ — E3/AS1 and wet area flooring
              3. MBIE — Code of Practice for Internal Wet-area Membrane Systems (PDF)
              4. BRANZ Level — Wet areas: statutory requirements
              5. Auckland Council — Building and consents
              kitchen cost
              Kitchen Renovation

              Kitchen Renovation Cost Calculator Tool (NZ)

              Quick answer: Our free kitchen renovation cost calculator NZ asks 12 questions about your finishes and scope, then emails you an indicative Auckland price. A mid-range Auckland kitchen costs $26,000–$35,000 + GST; use the calculator figure to set a budget, then compare real quotes line by line.

              black cabinetry kitchen island with black granite sink and quartz benchtop

              Planning Your Kitchen Renovation in Auckland

              If you’re thinking about renovating your kitchen in Auckland, the first question is almost always the same: what’s it going to cost? At Superior Renovations, we know that every home is different, and so is every budget. This page is about the part that comes before a quote: getting a realistic number, turning it into a budget you can defend, and then working out why two quotes for the same kitchen can sit thousands of dollars apart. If you want every line item priced by tier, our full kitchen renovation cost guide for Auckland covers the detail; this page is the planning and quote-checking companion to it.

              We’ll cover the stages of a full renovation, the hidden costs that catch people out, what drives a quote for kitchen cabinets, and how to read a quote once it lands. Our Kitchen Cost Calculator NZ is here too, so you can run your own numbers before anyone measures up.

               


              Get started with the calculator

              Free cost calculator

              How much will your kitchen renovation cost?

              Get an instant Auckland price range for your project — no details required to see it.

              Open the Kitchen Cost Calculator →

              Takes less than 60 seconds, results sent straight to your inbox.

              Open Kitchen Renovation Cost Calculator


               

              What Goes Into a Full Kitchen Renovation?

              A full kitchen renovation isn’t just swapping out cabinets. It’s a multi-stage process, and each stage affects your budget. Whether you’re in Ponsonby or Papakura, here’s what a complete kitchen overhaul actually involves.

              Every stage has to fit the next one or the whole job suffers. Based on our own kitchen work at Superior Renovations, here’s what you’re looking at, and how each stage affects your overall cost. Treat the stage ranges below as indicative planning figures, not quotes; the published totals in the cost section further down are what to budget against.

                • Planning and Design: This is where your vision becomes a workable plan. You’ll work with a designer, like our Design Manager Dorothy Li, to map out the layout, workflow, and aesthetic. A 3D render helps you see the space before anything is ordered. Expect $2,000–$5,000 for professional design services in Auckland, depending on complexity. As Dorothy puts it: a well-planned kitchen saves time, money, and stress during the build. For layout and finish starting points, browse our gallery of kitchen design inspiration.

               

              3D render of a galley kitchen renovation design with skylights and oak island

                • Demolition and Removal: Old cabinets, benchtops, and appliances come out. In older Auckland homes, you’ll sometimes find surprises, outdated wiring being the most common. Demolition typically costs $1,500–$3,000 depending on kitchen size and condition.
                • Structural Changes: If you want open-plan, walls may need to come down. Load-bearing walls need engineering sign-off and a building consent, so council fees and engineering costs land before any work starts. Check your pathway with Auckland Council early.
                • Plumbing and Electrical: Moving a sink or adding new lighting is standard in a kitchen reno, but it needs licensed professionals. Budget $2,000–$6,000. Auckland Council’s guidance is that plumbing and drainage work only qualifies for a consent exemption when an authorised person does it. Cut corners here and you’ll regret it.
                • Flooring and Wall Finishes: From tiles to timber, flooring sets the tone for the whole kitchen. In Auckland, quality materials like ceramic or hardwood run $50–$150 per m². Wall finishes and splashback tiles add another $1,000–$3,000. Our designer Alison Yu makes the point well: choosing durable flooring matters in a busy Auckland kitchen, you’ll thank yourself later.

              marble-look quartz benchtop and splashback in a renovated kitchen with blue bar stools

              • Cabinets and Benchtops: Cabinets are the backbone of the kitchen, $5,000–$25,000 depending on materials (laminate through to solid timber). Benchtops in granite or engineered stone range from $2,000 to $10,000.
              • Appliances: A full suite, oven, fridge, dishwasher, runs $3,000–$15,000. Energy-efficient options cost more upfront but save money over time. Consumer NZ’s kitchen appliance reliability data is worth reading before you choose brands.
              • Finishing Touches: Lighting, handles, and the details that pull it all together. Budget $1,000–$3,000. These are the things people notice, or notice are missing.

              Timeline: a standard kitchen renovation takes 5 to 6 weeks from the day demolition starts, as long as the design is finalised and the cabinetry is already being made. Cabinetry manufacturing takes 4 to 6 weeks, so it gets ordered early, and a job that needs consent adds 4 to 8 weeks for Auckland Council processing (figures from our renovation FAQ).

              Here’s a summary of the phases and their cost ranges:

              Phase Estimated Cost Key Considerations
              Planning and Design $2,000–$5,000 Work with a designer for a layout that actually works
              Demolition $1,500–$3,000 Watch for hidden issues in older homes
              Structural Changes $3,000–$10,000 May require Building Consent
              Plumbing/Electrical $2,000–$6,000 Licensed professionals only
              Flooring/Walls $2,000–$6,000 Choose durable, easy-to-clean materials
              Cabinets/Benchtops $7,000–$35,000 Balance quality and budget
              Appliances $3,000–$15,000 Factor in energy efficiency
              Finishing Touches $1,000–$3,000 The details that make it look finished

              Our Kitchen Cost Calculator lets you model these costs for your specific project in under a minute.

               


              Get started

              Takes less than 60 seconds, results sent straight to your inbox.

              Open Kitchen Renovation Cost Calculator


               

              Hidden Costs That Can Derail Your Kitchen Renovation Budget

              You’re halfway through a kitchen renovation in your Mount Eden villa, the new island is taking shape, when the builder finds dodgy wiring behind the walls. Budget blown. If that sounds familiar, you’re not alone. Unexpected costs catch Auckland homeowners out more often than you’d think. Here’s what to watch for.

              Drawing on our own jobs, plus Consumer NZ’s home renovation guide for the wider checklist:

                • Structural surprises: Knocking down a load-bearing wall can add $3,000–$10,000 for structural reinforcement on a typical job, before consent. Jeff Zhang, our LBP and Site Manager, is blunt about this one: get a structural engineer’s report before anything touches a wall. Fixing a sagging ceiling costs a lot more than the report did.

              before and after kitchen renovation showing old cabinetry replaced with white cabinetry and black tile splashback

                • What’s behind the walls: Older homes in Grey Lynn or Remuera regularly turn up asbestos, outdated plumbing, or old wiring. These add $1,000–$5,000 once discovered. A pre-renovation inspection ($500–$1,000) is worth it. Build a 10–20% contingency into your budget from the start, the range on our Auckland renovation cost guide, and plan nearer the top of it on a pre-1940s villa or bungalow.
                • Cabinet costs: Budget cabinets warp and wear. Quality options run $5,000–$25,000 depending on materials. Our view is blunt: put the money into cabinets that last. You open them dozens of times a day, and a sagging door or a failed drawer runner is the first thing that makes a new kitchen feel old.
                • Appliances: A full package, induction cooktop, integrated fridge, dishwasher, can hit $3,000–$15,000, not including installation. EECA’s appliance guidance is to compare the Energy Rating Label: the stars for efficiency, and the kWh-per-year figure for running cost.

              white quartz benchtop and stone-look splashback around a black induction cooktop

              • Professional fees and consents: Design fees, contractor costs, and architect fees add $2,000–$10,000. Building Consents for structural changes add $500–$2,000. Don’t try to avoid these: work that needed a consent and didn’t get one becomes your problem, and the next owner’s, when the house is sold.

              Start with a realistic plan. Our Kitchen Cost Calculator NZ asks whether demolition, electrical and plumbing work, and building consent fees are in your scope, so those lines are in the number from the start rather than added later.

              Hidden Cost Estimated Cost (NZD) How to Manage It
              Structural Changes $3,000–$10,000 Engineer’s report before touching walls
              Hidden Issues (wiring, plumbing) $1,000–$5,000 Pre-renovation inspection
              Quality Cabinets $5,000–$25,000 Choose durable materials
              Appliances $3,000–$15,000 Energy-efficient models reduce running costs
              Professional Fees and Consents $2,000–$10,000 plus council fees Consent fees follow Auckland Council’s fee schedule

              How Much Does a Kitchen Renovation Cost in Auckland?

              For a full kitchen renovation in Auckland, new cabinets, benchtops, flooring, and plumbing and electrical work, a mid-range project costs between $26,000 and $35,000 + GST for a 10–12m² kitchen, which works out to roughly $2,300 per square metre. Basic refreshes start from $15,000, and larger kitchens (18m²+) or premium builds with custom joinery, stone and integrated appliances run $62,000 to $138,000 or more. Those are the figures published on our own renovation cost FAQ and Auckland renovation cost guide for 2026. Here is how they break down by tier:

                • Basic refresh or small kitchen ($15,000–$25,000): New laminate benchtops, standard cabinets, basic appliances, existing layout kept. Suitable for rental properties or straightforward refreshes on a tight budget.
                • Mid-range ($26,000–$35,000 + GST): A 10–12m² kitchen with custom cabinets, stone benchtops and quality appliances, covering design, cabinetry, benchtop, splashback, appliances and installation. This is where most Auckland homeowners land. Our designer Cici Zuo puts it well: mid-range kitchens balance style and practicality, you get a good result without overcapitalising.

              before and after open-plan kitchen renovation with black cabinetry and pendant lighting

              • Large or premium ($62,000–$138,000+): Kitchens of 18m² and over, or premium builds with custom joinery, stone benchtops and integrated appliances. Layout changes, specialist stone and solid timber or lacquered cabinetry push a job toward the top of this band.

              What drives these costs? The choices you make. Vinyl flooring over hardwood saves thousands. Moving plumbing for an island adds $2,000–$5,000. Auckland Council is explicit that you are unlikely to need a building consent to remodel an existing kitchen within the same space with the sink left where it is, which is also the cheapest way to build.

              For cabinetry, benchtop, flooring and appliance prices by tier, the full cost guide linked at the top of this page goes line by line. Where the money goes is usually a choice, not a surprise. The most common pattern we see on Auckland kitchens is a mid-range budget with one deliberate upgrade, most often the benchtop, paid for by keeping the layout and the flooring exactly where they are.

              Renovation Type Estimated Cost (NZD) What You Get
              Basic refresh / small kitchen $15,000–$25,000 Laminate benchtops, standard cabinets, basic appliances, existing layout
              Mid-range (10–12m²) $26,000–$35,000 + GST Custom cabinets, stone benchtops, quality appliances, roughly $2,300/m²
              Large (18m²+) or premium $62,000–$138,000+ Custom joinery, stone benchtops, integrated appliances

               

               


              Get started

              Takes less than 60 seconds, results sent straight to your inbox.

              Open Kitchen Renovation Cost Calculator


               

              Auckland-specific factors: Auckland runs above the national average on labour rates, $120–$150 an hour for qualified trades, and on compliance costs (per our FAQ). Older homes, Devonport villas, Grey Lynn bungalows, often need additional work for outdated wiring or plumbing once the old cabinets come out.

              How to keep costs down: Think about how you actually use your kitchen. If you cook seriously, an island might be worth it. If the kitchen is mostly for quick meals, focus on functional storage upgrades rather than premium finishes. Our designer Alison Yu puts it simply: think about your kitchen daily, that’s what should guide your budget decisions.

              Want a price for your kitchen renovation?
              Open the calculator →

              What a Small Kitchen Renovation Costs

              A small kitchen does not cost proportionally less than a large one, and that catches people out. A small kitchen renovation in Auckland starts from around $15,000 to $25,000, which is the same budget-refresh band as a larger kitchen kept simple. The reason is that a kitchen is mostly fixed costs: the same trades attend, the same appliances go in, the same plumbing and electrical work is done, and the same design and project-management time is spent whether there are eight cabinets or eighteen.

              What genuinely scales with size is cabinetry and benchtop area. On a compact galley or L-shaped kitchen that is a smaller share of the total than most people assume, so the honest advice on a small kitchen is to spend the saving on the things you touch every day, the drawer runners, the tapware, the benchtop, rather than assuming the whole job will come in cheap.

              If your kitchen is genuinely tight, layout does more for you than budget. Our guide to design ideas for small kitchens and our kitchen planning measurements reference cover the clearances that make a small space work.

              How Much Do Kitchen Designers Charge in NZ?

              Professional kitchen design in Auckland typically runs $2,000 to $5,000, depending on complexity and how much documentation the build needs. That normally buys a measured survey, a layout worked through in plan, cabinetry and appliance specification, finishes selection, a 3D render so you can see it before anything is ordered, and drawings the installer can build from.

              Charging models vary. Some designers work to a fixed fee for a defined package, some charge hourly, and some charge a percentage of the project value. The one to ask about directly is whether the fee is credited back if you proceed with the same company for the build, because that changes the real number considerably.

              At Superior Renovations the design sits in our own design department rather than being contracted out, and the designer who draws your kitchen stays involved through the build. Practically, that means the person who chose the cabinetry is the person answering the question when a site measurement comes back 15mm off. You can see the range of work in our Auckland design studio.

              Do You Need a Building Consent for a Kitchen Renovation?

              Usually not. Auckland Council states you are unlikely to require a building consent to remodel an existing kitchen within the same space, leaving the kitchen sink in the same position. Swapping cabinets, benchtops, flooring and appliances in a like-for-like layout is normally exempt work.

              Consent enters the picture when the job stops being a swap: removing a load-bearing wall to open the kitchen to the living area, adding a new sanitary fixture or moving drainage rather than reconnecting an existing one, or altering the structure of the house. Those are the changes that also carry the biggest cost, which is why the consent question and the budget question tend to arrive together.

              Treat that as general guidance rather than a ruling on your own kitchen. Confirm your specific pathway with Auckland Council or a Licensed Building Practitioner before you commit to a layout change, and be aware that any restricted building work has to be carried out or supervised by an LBP. If you’re weighing up doing part of the job yourself, our guide to which kitchen work NZ law lets a homeowner do sets out where the line sits.

              Factors That Drive Kitchen Renovation Costs in NZ

              Two kitchens in Auckland can have wildly different price tags. Here’s what actually drives the difference.

              Think of your kitchen renovation like ordering coffee in Ponsonby, a flat white or a double oat milk latte with all the trimmings. Every choice adds up. Here’s what matters most:

                • Kitchen size and layout: A small 8m² kitchen in Papakura sits at the bottom of the refresh band. A 20m² open-plan kitchen in St Heliers is a mid-range project or beyond. Relocating a sink or adding an island adds $2,000–$5,000 in plumbing and electrical work. Dorothy Li’s advice: stick to your existing layout wherever possible. It’s the single most effective way to control cost.
                • Materials: Laminate benchtops cost $1,000–$3,000. Quartz or granite runs $5,000–$10,000. Vinyl flooring sits at $50–$80/m², hardwood or tiles at $100–$150. The benchtop is the line with the widest spread for the smallest area, so it’s the first place to look when a quote comes in high.
                • Appliances: A basic package costs around $3,000. High-end smart appliances can push that to $15,000. Our rule of thumb: choose appliances that suit how you cook, not how you’d like to cook. Check the Consumer NZ reliability results before you commit.
                • Structural changes: Load-bearing wall removal costs $3,000–$10,000 plus engineering and consent fees. Skip a consent you needed and you’ll face problems at sale time.
                • Labour and professional fees: Qualified Auckland trades charge $120–$150 an hour. Across a kitchen, expect $2,000–$10,000 for skilled trades, design and project management on top of materials.
                • What’s behind the walls: Older Auckland homes regularly turn up plumbing or wiring that needs replacing. A pre-renovation inspection ($500) is cheap insurance against finding out mid-build.

              How to prioritise: If you host regularly, invest in the island. If you’re a low-key cook, focus on durable basics and smart storage. Our Kitchen Cost Calculator NZ lets you adjust these variables and see how they affect the total in real time.

              Factor Estimated Cost Impact (NZD) How to Manage It
              Kitchen Size and Layout $2,000–$10,000 Keep existing layout to save on plumbing and electrical
              Materials (Benchtops and Flooring) $2,000–$15,000 Mid-range materials offer the best durability-to-cost ratio
              Appliances $3,000–$15,000 Energy-efficient models reduce running costs
              Structural Changes $3,000–$10,000 Structural engineer’s report before any wall comes down
              Labour and Professional Fees $2,000–$10,000 Licensed professionals avoid rework costs
              Hidden Issues $1,000–$5,000 10–20% contingency from the start

              3D render of a white kitchen design with island bench and twin skylights

              Custom Cabinetry vs Flat-Pack: What the Difference Actually Costs

              Cabinetry is the single largest line in almost every kitchen quote, so it is the line where the price gap between two quotes usually opens up. Understanding the three options is the fastest way to work out why.

              Flat-pack uses standard carcass sizes off a shelf. It is the cheapest route and it is genuinely fine in a rectangular room with no obstacles. The cost lands where the room stops cooperating: a chimney breast, a window in the wrong place, a wall that is 40mm out of square over three metres, and you end up with filler panels doing the work that cabinetry should be doing.

              Modular with modifications sits in the middle. Standard boxes, non-standard doors, fronts and fillers made to suit. Most mid-range Auckland kitchens are built this way and the result is good.

              Fully custom means every cabinet is made to the millimetre for your room. You pay for it in the cabinetry line, and you get it back in usable space: drawers that run the full width instead of stopping short, a pantry that fills its recess, a run that finishes flush against the wall rather than with a 60mm filler.

              What Drives a Quote for Kitchen Cabinets

              A kitchen cabinet quote is priced on four things: how many units there are, what they’re made of, what’s inside them, and who installs them. Two quotes for the “same” kitchen usually differ on at least one of those, and it’s rarely the one you’d guess.

              • Unit count and type. A bank of drawers costs more than a cupboard of the same width, because each drawer carries its own box and runner set. Tall pantry and oven towers, corner units and an island with panels on all four sides add up quickly.
              • Door and panel finish. Our calculator prices six cabinetry finishes: melamine, fibre board, plywood, thermoformed, acrylic and lacquer or paint finish. Melamine sits at the practical end; a painted or lacquered door carries extra finishing work, and is priced that way.
              • Hardware and internals. Soft-close hinges and drawer runners, pull-out bins, corner mechanisms and internal organisers. Ask for the hardware brand by name, because this is the line that decides how the kitchen feels in ten years.
              • Exposed ends and fillers. End panels, kickboards, scribe strips and filler pieces. On an out-of-square wall in an older Auckland home these can be a real number.
              • Installation. Supply-only and supply-and-install quotes are not comparable. Installation also decides who is responsible when a door won’t line up.

              Questions to Ask Before You Compare Cabinet Quotes

              1. Is the benchtop in this price, or quoted separately? What about the splashback?
              2. What board are the carcasses made from, and what edging is used on them?
              3. Which hinge and runner hardware is specified, and is it soft-close throughout?
              4. Does the price include removal of the old kitchen, delivery and installation?
              5. Are plumbing and electrical disconnection and reconnection included, or left to you to arrange?
              6. Is the figure including or excluding GST?

              If a quote can’t answer those six, it isn’t finished yet. Our guide to choosing custom kitchen cabinets goes further into finishes and storage.

              💡 Quick tip: Ask for the cabinetry drawing with the quote, not just a price. A unit-by-unit plan is the only way to check two quotes are pricing the same number of drawers.

              Where Our Cabinetry Is Made

              This is one of the few parts of a kitchen quote where it is worth asking who actually builds it. Ours is made in-house. In January 2023 Little Giant Interiors moved into a 700m² factory in Rosedale on the North Shore, more than four times the 150m² Henderson unit it replaced, sitting alongside the group’s head office.

              The floor runs a Format-4 CNC machining centre for cutting and drilling panels repeatably, a Homag edgebander applying laser edge banding, and a Micronair extraction system pulling dust away at the source. The reason that matters to your budget is not the machinery itself, it is that custom sizing stops being an expensive exception when the factory is set up to cut to a measurement rather than to a catalogue. If a cabinet has to be 812mm wide, it is 812mm wide.

              It also removes a handover. When the cabinetmaker, the designer and the project manager are the same organisation, a site measurement that comes back different does not turn into a three-week negotiation between suppliers. For an idea of what that looks like finished, see our kitchen designs and styles and the kitchen design gallery, or open the drawers yourself on the kitchen displays at our Wairau Valley showroom at 16B Link Drive.

              💡 Quick tip: If the cabinetry carcasses are sound and only the fronts are dated, replacing doors and drawer fronts is a fraction of a full rebuild. Our guide to the cost of replacing kitchen cupboard doors covers when that is the smarter call.


              How Our Kitchen Renovation Cost Calculator Works

              Planning a kitchen renovation in Auckland without a cost picture is guesswork. How do you know whether you’ve budgeted enough for that benchtop, or whether the plumbing is about to catch you out? That’s what our Kitchen Cost Calculator NZ is for. It’s free, it’s built around how Auckland kitchens are actually priced, and it sends an indicative figure to your inbox.

              We built it because renovation pricing is opaque, and nobody should commit to a conversation, let alone a contract, without a realistic idea of the number.

              What the Calculator Asks You

              Twelve questions, all about scope and finish. This is the full list, so you can have your answers ready:

              Question Your options
              Type of kitchen renovation Mid-range or high-end
              Cabinetry material Melamine, fibre board, plywood, thermoformed, acrylic, lacquer/paint finish
              Benchtop material Engineered stone, laminate, polished concrete, marble, granite, or don’t know yet
              Splashback Tiled, toughened glass, mirrored glass, acrylic, stainless steel, or none
              Quality of fittings Low-end, mid-range or high-end
              Scope switches (yes/no) Flooring, demolition, LED lighting, electrical and plumbing work, building consent fees
              Location Whether the project is in Auckland
              Anything else A free-text note on your kitchen

              The result is sent to the email address you give at the end, along with your name and phone number, so the figure arrives in writing and one of our team can follow it up if you want them to.

              What It Doesn’t Price

              Be clear on the gaps, because they’re where a calculator figure and a real quote part company:

              • Appliances. There’s no appliance question, because a $900 oven and a $9,000 one both fit the same hole. Budget for them separately.
              • Room size and layout moves. The calculator doesn’t measure your kitchen. A larger room, or moving the sink, hob or drainage, is something only a site measure prices properly.
              • What’s behind the walls. Old wiring, galvanised pipes and soft framing only show up once the old kitchen is out. That’s what the contingency is for.

              How to Get a More Useful Number

              Run it twice. Once at mid-range with the finishes you’d accept, and once at high-end with the finishes you actually want. The gap between the two figures is the size of the decisions still in front of you, and it’s more useful than either number on its own.

              Answer “don’t know yet” on the benchtop rather than guessing, and switch on demolition, electrical and plumbing for any full renovation; a like-for-like swap with none of those is a refresh, not a renovation. As Dorothy Li, our Design Manager, puts it: the calculator is a roadmap rather than a quote, and it shows you where the money goes before you commit to anything.

              How accurate is it? It’s an indicative figure, not a quote, and it’s only as good as your answers. It won’t replace a measured quote for one of the kitchens we design, make and install across Auckland, but it gets you into the right band before you talk to anyone.

              💡 Quick tip: Write down the two calculator figures before your first consultation. A designer can tell you very quickly which of your choices moved the number, and that’s the conversation that saves money.


              Turning a Calculator Estimate Into a Kitchen Budget

              A calculator number is a starting point. A budget is that number plus everything the calculator was never going to know. Here is the order we’d build it in.

              1. Start with your calculator range. Use the mid-range and high-end runs as the floor and the ceiling.
              2. Check it against the published bands. A mid-range 10–12m² Auckland kitchen is $26,000–$35,000 + GST. If your number sits well outside that, one of your answers is doing a lot of work, and it’s worth knowing which.
              3. Add appliances as their own line. EECA suggests comparing the kWh-per-year figure on the Energy Rating Label: its worked example is an appliance using 180kWh a year at 30c per kWh, which costs about $54 a year to run. Retailers are legally required to display the label on regulated appliances.
              4. Confirm the GST basis. Some figures you’ll see are + GST, some include it. At 15%, that’s $3,900 on a $26,000 kitchen, so put every number on the same footing.
              5. Add a 10–20% contingency. Plan nearer 20% on a pre-1940s villa or bungalow, where old wiring and plumbing turn up once the kitchen comes out.
              6. Map the timing. Cabinetry takes 4 to 6 weeks to make, the on-site work 5 to 6 weeks from demolition, and consent adds 4 to 8 weeks if your layout needs one. Payments follow those stages.
              Budget line Where the number comes from
              Kitchen build (cabinetry, benchtop, splashback, trades, install) Calculator range, checked against the published bands
              Appliances Your own shortlist, compared on the Energy Rating Label
              GST 15% on any figure quoted + GST
              Contingency 10–20% of the build, nearer 20% on older homes
              Consent and engineering (layout or structural change only) Confirmed at design stage with Auckland Council or an LBP

              If the total is more than you want to spend, the levers are, in order: keep the layout, step the benchtop down a material, then simplify the cabinetry finish. Cutting the contingency is not a lever.


              How to Compare Kitchen Renovation Quotes

              Two quotes for the same kitchen can sit thousands apart and both be honest. Usually they’re pricing different things. Put them side by side and check each of these before you compare totals.

              Check What to look for
              Fixed price or estimate A fixed price only moves through written variations; an estimate can move with time and materials
              Allowances Prime cost (PC) sums for items not yet chosen and provisional sums for work not yet scoped. Low allowances make a quote look cheap and get topped up later
              Design Whether a measured design, 3D render and drawings are included or charged separately
              Cabinetry Unit count, carcass board, door finish, hardware brand, supply and install
              Benchtop and splashback Material, thickness, edge detail, and whether they are in the price at all
              Trades Demolition and rubbish removal, plumbing, electrical, painting and flooring, each named
              Appliances Supplied and installed, installed only, or excluded
              Consent Who obtains it, and whether fees are included
              GST and payments Including or excluding GST, and how many payment stages

              What the Law Says a Kitchen Contract Must Include

              A mid-range Auckland kitchen at $26,000–$35,000 + GST is $29,900–$40,250 once GST is added, which puts most full renovations at or over the $30,000 line. MBIE’s Building Performance guidance says residential building work costing $30,000 or more, including GST, must have a written contract, and your contractor must give you a disclosure statement and a consumer protection checklist before you sign. The contract has to cover, among other things, the price or how it will be calculated, a description of the work including materials and products, who obtains any building consents, the payment process, how defects will be fixed, and how variations are agreed before work continues. There is also a 12-month defect repair period under the implied warranties, whether or not you have a written contract.

              Our guides to when a written building contract becomes compulsory and what to get in writing before you sign a renovation contract cover the detail.

              How We Quote a Kitchen

              Every Superior Renovations kitchen is quoted as a fixed price, with in-house design and 3D renders, demolition, plumbing and electrical, cabinetry, benchtop and splashback, appliance installation and painting under the one contract and one dedicated project manager. The only additions to a fixed price are variations you’ve approved in writing, either changes you ask for or conditions nobody could see until the old kitchen came out. Having completed more than 1,000 Auckland renovations, we’d rather tell you the full number at the start than explain a new one halfway through.

              💡 Quick tip: If one quote is far cheaper than the rest, read its exclusions list first. The difference is usually there, not in the workmanship.

               

              Ready to Get Started?

              Whether you’re hosting in Botany or cooking quick weeknight meals in Mt Eden, the kitchen is where your household actually runs, and it’s the room where a vague budget costs the most. You now have the order to work in: run the calculator, build the budget around it, then make every quote show its working.

              Our Kitchen Cost Calculator is the first step, a personalised, indicative figure based on Auckland pricing, sent to your inbox once you’ve answered twelve questions. After that, the team that designs and builds Auckland kitchens end to end is here to talk through the detail, from the first layout to the final handle.

               


              Get started

              Takes less than 60 seconds, results sent straight to your inbox.

              Open Kitchen Renovation Cost Calculator


               

              ➡ Book your free in-home consultation with Superior Renovations
              ➡ Run your numbers through the kitchen renovation cost calculator
              ➡ Request a free feasibility report for your project


              Kitchen Renovation Cost Calculator FAQs

              How much does a kitchen renovation cost in Auckland?

              A mid-range kitchen renovation in Auckland costs $26,000 to $35,000 + GST for a 10 to 12 square metre kitchen with custom cabinets, stone benchtops and quality appliances, roughly $2,300 per square metre. Basic refreshes start from $15,000, and larger (18 square metres plus) or premium kitchens run $62,000 to $138,000 or more. Our Kitchen Cost Calculator NZ gives you a figure for your own finishes and scope.

              Is the kitchen renovation cost calculator free?

              Yes. It asks 12 questions about your renovation type, cabinetry material, benchtop, splashback, fittings and scope, including flooring, demolition, lighting, electrical and plumbing, and consent fees. The indicative figure is emailed to you once you add your name, phone number and email. It does not price appliances or measure your room, so treat a measured site visit as the next step.

              How much does a small kitchen renovation cost?

              A small kitchen renovation in Auckland starts from around $15,000 to $25,000. It is not proportionally cheaper than a large kitchen, because most of the cost is fixed: the same trades attend, the same appliances go in, and the same design and project-management time is spent. Only the cabinetry and benchtop area scale down with the room.

              What affects a quote for kitchen cabinets?

              Four things: how many units there are (drawers cost more than cupboards of the same width), what they are made of (from melamine through to lacquer or paint finishes), the hardware and internal fittings, and whether installation is included. Exposed end panels and fillers add more on out-of-square walls. Always check whether the benchtop and splashback are in the cabinet quote or priced separately.

              How do I compare two kitchen renovation quotes?

              Check whether each is a fixed price or an estimate, then compare what is included rather than the totals: design, cabinetry specification, benchtop and splashback, demolition, plumbing, electrical, painting, appliances, consent and GST. Look closely at prime cost and provisional sums, because low allowances make a quote look cheaper than the job will be. Ask for the cabinetry drawing so both quotes price the same units.

              Do I need a written contract for a kitchen renovation?

              If the work costs $30,000 or more including GST, yes. MBIE's Building Performance guidance says residential building work at that level must have a written contract, and the contractor must give you a disclosure statement and consumer protection checklist before you sign. Below that threshold a written contract is still the sensible choice, and implied warranties apply either way.

              How much do kitchen designers charge in NZ?

              Professional kitchen design in Auckland typically runs $2,000 to $5,000 depending on complexity. That usually covers a measured survey, the layout, cabinetry and appliance specification, finishes selection, a 3D render and drawings the installer can build from. Ask whether the design fee is credited back if you proceed with the same company for the build, because that changes the real cost.

              Do I need a building consent for a kitchen renovation?

              Usually not. Auckland Council states you are unlikely to require a building consent to remodel an existing kitchen within the same space with the sink left in the same position. Consent is needed once you remove a load-bearing wall, add a new sanitary fixture or alter drainage or structure. Confirm your own pathway with Auckland Council or a Licensed Building Practitioner.

              What are the biggest cost drivers in a kitchen renovation?

              Kitchen size, cabinetry type, benchtop material, appliances, and whether the layout moves. Relocating a sink or adding an island adds $2,000 to $5,000 in plumbing and electrical work alone. Hidden issues such as outdated wiring or old plumbing can add $1,000 to $5,000, so build a 10 to 20 percent contingency into your budget from the start, nearer 20 percent on older homes.

              Is custom cabinetry worth the extra cost over flat-pack?

              It depends on the room. Flat-pack works well in a rectangular kitchen with no obstacles. Once there is a chimney breast, an awkward window or walls that are out of square, standard carcasses need filler panels and you lose usable space. Custom cabinetry is made to the millimetre for the room, so drawers run full width and runs finish flush. That is what you are paying for.

              How long does a kitchen renovation take?

              A standard kitchen renovation takes 5 to 6 weeks from the day demolition begins, provided the design is finalised and cabinetry is already being made. Cabinetry manufacturing takes 4 to 6 weeks, so it is ordered early, and custom splashbacks are installed on a separate visit. If consent is required, allow an extra 4 to 8 weeks for Auckland Council processing.

              How can I keep kitchen renovation costs down without cutting quality?

              Keep the layout. Moving the sink, hob or drainage is the single most expensive decision in a kitchen, and it also triggers the consent question. After that, spend on the things you touch daily, the drawer runners, tapware and benchtop, and save on the things you do not, such as internal cabinet finishes and specialty appliances you will rarely use.


              Further Resources for your kitchen renovation

              1. Featured projects and Client stories to see specifications on some of the projects.
              2. Real client stories from Auckland
              3. Kitchen renovation cost in Auckland – the full cost guide, line item by line item
              4. How long a kitchen renovation takes

              Need more information?

              Take advantage of our FREE Complete Home Renovation Guide (48 pages), whether you’re already renovating or in the process of deciding to renovate, it’s not an easy process, this guide which includes a free 100+ point check list – will help you avoid costly mistakes.

              Download Free Renovation Guide (PDF)


              Q Mastercard 18 month interest free finance option for Superior Renovations kitchen renovations

              Have you been putting off getting renovations done?

              We have partnered with Q Mastercard ® to provide you an 18 Month Interest-Free Payment Option, you can enjoy your new home now and stress less.

              Learn More about Interest-Free Payment Options*

              *Lending criteria, fees, terms and conditions apply. Mastercard is a registered trademark and the circles design is a trademark of Mastercard International Incorporated.

               

               


              Still have questions unanswered?

              Book a no-obligation consultation with the team at Superior Renovations, we’d love to meet you to discuss your renovation ideas!

                Services

                Home RenovationKitchen RenovationBathroom RenovationOutdoor RenovationHouse ExtensionCommercialDesign ServicesOther

                By submitting this form, you agree to receive communications from us via email or text regarding our services, you can unsubscribe at any time.

                This site is protected by reCAPTCHA and the Google

                Privacy Policy and Terms of Service apply.


                References

                1. Auckland Council – Kitchen and bathroom home renovations (consent requirements)
                2. MBIE Building Performance – Contracts for your building project
                3. EECA – Choose good appliances (Energy Rating Labels)
                4. Consumer NZ – Most reliable kitchen appliances
                5. Consumer NZ – Home renovation guide
                6. Superior Renovations – Renovation cost FAQ (2026 figures)
                7. Superior Renovations – Renovation costs Auckland (per-m² rates and contingency)

                Please note: Whilst all information is considered to be true and correct at the date of publication, changes in circumstances after the time of publication may impact on the accuracy of the information. The information may change without notice and Superior Renovations is not in any way liable for the accuracy of any information printed and stored or in any way interpreted and used by a user.

                 

                 

                house recladding cost calculator - Superior Renovations
                Recladding

                House Recladding Cost Calculator Tool (NZ)

                Quick answer: recladding a house in Auckland typically runs from around $1,450 per square metre for a standard home to about $2,175 per square metre for an architectural one, before fees. On a mid-sized home that usually means a total somewhere between $150,000 and $350,000 once you add architectural fees, council consent and scaffolding. Leaky or monolithic-clad homes sit at the higher end because of what’s found once the old cladding comes off.

                Recladding is one of the biggest spends a homeowner will face, and vague “it depends” answers don’t help you plan. Here’s how the cost actually breaks down, what changes the number, how long the job takes, and a way to get a figure for your own home in about a minute.

                Free tool
                Get an indicative recladding cost for your Auckland home

                Open the recladding cost calculator →


                How much does recladding cost in NZ?

                We price recladding on a per-square-metre basis, set by the type of home, because that’s what drives the labour and materials. These are the indicative Auckland rates behind our calculator:

                Home type Indicative cost
                Standard home (mix of plaster and brick) from $1,450 per m²
                Leaky / plaster home from $1,837 per m²
                Architectural home from $2,175 per m²

                On top of the per-metre rate, three costs are usually added because recladding almost always triggers a building consent:

                • Architectural and design fees – around $10,150, because a reclad needs documented plans for consent.
                • Auckland Council consent fees – around $4,995.
                • Scaffolding and full wrap – around $35,000 for a full reclad, though this varies with height and access.

                These are indicative figures to help you plan, not a fixed quote. Every reclad is different once the cladding comes off. For a wider look at materials, our cladding options guide runs through the choices, and our national recladding cost guide goes deeper on how those figures compare across the country.

                💡 Quick tip: The single biggest variable is what’s behind the cladding. Rotten framing and damp-damaged structure found mid-project is the most common reason a reclad budget moves, so build in a contingency.

                What does it cost to reclad a whole house?

                Let’s put real numbers on it. Take a standard single-storey Auckland home with around 150 square metres of wall area. At $1,450 per m² that’s about $217,500 for the cladding work, and once you add architectural fees, council consent and scaffolding you’re near $270,000. A larger two-storey home, or one classed as leaky or architectural, climbs from there.

                That’s why a total like “$330,000” only means something next to your home’s size and type. Plug your wall area and home type into the recladding cost calculator and it does the maths for you, including the consent and scaffolding costs most guides leave out.

                One thing worth knowing before you compare quotes: recladding sits well over the threshold at which a written building contract stops being optional. MBIE is explicit that a contractor must provide a written contract for residential building work costing $30,000 or more, including GST, along with a consumer protection checklist and a disclosure statement. On a reclad you should have all three before anything is signed. If you’re still weighing up who to give the job to, our guide on choosing the right renovation company covers what to check.


                Replacement cladding options and what they do to the price

                The rate table above is set by home type, but the cladding system you choose on the way back on moves the number too. Two homes of identical size can land a long way apart depending on what goes back up, how much detailing it needs, and whether the substrate has to change to suit it.

                These are the systems we most often specify on an Auckland reclad, and how they tend to sit against each other on cost:

                Replacement cladding Relative cost on a reclad What drives it
                Fibre-cement weatherboard Lower to mid Fast to fix, forgiving on older framing, painted finish is a recurring maintenance cost.
                Timber weatherboard Mid Profile and timber species; the labour to fix and finish it is where the money goes, not the board.
                Modern plaster over a cavity system Mid to higher Multi-stage finish and controlled drying time; the cavity behind it is what separates it from 1990s monolithic work.
                Brick veneer Higher Needs a foundation ledge to sit on, so it is rarely a straight swap on a house that was never bricked.
                Vertical panel and board-and-batten systems Mid to higher Junction and flashing detail around windows; the panels are the cheap part, the detailing isn’t.
                Mixed cladding (weatherboard plus a feature material) Higher Every change of material is another junction to flash and seal, and junctions are where the labour sits.

                What it costs to reclad a weatherboard home

                A weatherboard house is usually the more straightforward reclad, and it tends to sit at the standard rate rather than the leaky-home one. The boards come off, the building wrap and any damaged framing are dealt with, and new boards go back on. What lifts the price is rot in the framing behind, and the fact that older weatherboard homes were often built without a drained cavity – so bringing the wall up to a current-code system is part of the job, not an optional extra.

                Whichever system you choose, it has to satisfy Building Code clause E2, which requires that external roof and wall claddings and openings prevent external moisture from causing undue dampness or damage, per MBIE’s Building Performance guidance on E2 external moisture. That is the standard your new wall has to meet, and it is why a reclad is a design job before it is a building job.

                💡 Quick tip: If you’re replacing windows anyway, do it during the reclad. The walls are already open and the scaffold is already up, so the same work costs far less than doing it as a separate project two years later.

                Recladding a leaky or monolithic home

                A lot of Auckland recladding is driven by leaky-building issues, especially on monolithic-clad homes from the late 1990s and early 2000s. These sit at the higher $1,837 per m² rate because the work is rarely just cladding – once the monolithic plaster is off, you often find damaged framing that has to be replaced and treated before the new system goes on.

                If your home is monolithic-clad and you’ve seen damp patches, swelling around windows, or a musty smell, it’s worth acting early. The longer moisture sits in the frame, the bigger the repair. For the weathertightness background, the Building Performance (MBIE) guidance is the authority, and our post on monolithic cladding in NZ covers the warning signs.

                What leaky home repair costs actually cover

                People search for leaky home repair costs expecting a separate price list. There isn’t one, and that’s the honest answer: on almost every Auckland job, the leaky-home repair is the reclad. The rate you’re quoted already assumes the wall comes off and the structure behind it gets assessed.

                What sits inside the per-square-metre rate:

                • Removing the failed cladding and any saturated building wrap.
                • Installing a drained and vented cavity system behind the new cladding.
                • New flashings at every window, door and junction – the detail that usually failed in the first place.
                • The new cladding and its finish.

                What sits outside it, and belongs in your contingency:

                • Structural framing replacement. Nobody can price this before the cladding is off, because nobody can see it. This is the number that moves.
                • Internal repairs where moisture reached linings, insulation or flooring.
                • Window and joinery replacement, if the units themselves have failed rather than just their flashings.

                Important note: If you were counting on the Weathertight Homes Resolution Service, that door has closed. MBIE confirms the deadline to bring a claim expired on 31 December 2021 and no new claims can be lodged. For anything to do with your own legal position, take advice from a property lawyer rather than a builder.


                Recladding across Auckland: where the demand sits

                Monolithic and plaster homes aren’t spread evenly across the city. The subdivisions built through the late 1990s and early 2000s cluster hard on the North Shore, which is why so much of the recladding work we quote comes from Albany, Rosedale, Glenfield, Browns Bay, Torbay and Devonport, with a steady stream from Takapuna and the newer pockets out toward Hobsonville.

                Being based on the Shore is part of why we take on this work rather than avoiding it. Our showroom is at 16B Link Drive, Wairau Valley, which puts most of those suburbs inside a fifteen-minute drive – it means a site visit before quoting is normal rather than a favour, and it means the project manager can actually be there on the day the cladding comes off and the framing is exposed. That is the day the scope changes on a reclad.

                The other half of it is the design and consent stage. A reclad can’t start without documented plans and a consent, and since December 2024 that work has sat inside the group with Sonder Architecture, a team of architectural designers who prepare the drawings a consent application needs and liaise with the council so the paperwork keeps pace with the build. We coordinate that process on your behalf; the council still issues the consent, and any restricted building work is handled by the appropriate licensed people. If you want to see how the whole sequence runs, from weathertightness assessment through to the final sign-off, that’s what the team that strips, repairs and re-clads Auckland homes does week in, week out.


                Do you need consent to reclad?

                In most cases, yes – recladding a house is building work that needs an Auckland Council building consent. That’s why architectural and consent fees are built into a realistic budget. There are narrow exceptions for minor like-for-like repairs, but a full reclad almost always needs plans, a consent, and inspections. We walk through the detail in can I reclad my house without building consent, and confirm the exact pathway with Auckland Council as part of the project.

                Treat this as general information rather than a ruling on your own house. Whether your specific job is exempt, and what restricted building work it involves, is a question for Auckland Council or a Licensed Building Practitioner.


                How long does a reclad take, and can you stay in the house?

                Two questions come up in almost every first conversation, and the honest answers are less alarming than most people expect.

                The timeline

                The build itself is not usually the long part. Design and consent come first, and that stage has its own rhythm: measured drawings, a consent application, council processing, then any requests for further information. Only then does the scaffold go up.

                Once on site, a straightforward single-storey reclad typically runs several weeks. A larger two-storey home, or one where significant framing has to be replaced, runs longer – and the extension almost always traces back to what was found behind the old cladding rather than to the new cladding itself. Your project manager sets a realistic programme once the scope is confirmed after removal, which is the only point at which a date means anything.

                Living in the house

                Most people stay. The work is happening on the outside of your walls, so the kitchen and bathroom keep working and you keep sleeping in your own bed. What you live with is scaffolding wrapped around the house, reduced natural light through the wrap, noise during the day, and a period where some rooms are noticeably cooler because their wall is temporarily just framing and building paper.

                Where it gets harder is if windows are being replaced at the same time, or if internal linings have to come off to reach damaged framing. We sequence that room by room so the house stays liveable. If you’d rather not be there for the messy fortnight, say so early – it’s much easier to plan the noisy work around a booked absence than to arrange one at short notice. Our guide to staying put versus moving out during a renovation works through that decision properly.


                What drives the final recladding cost

                • Home type and cladding system – the biggest lever, from standard through to architectural.
                • Structural repairs – rotten or damp framing found once the old cladding is off.
                • Height and access – two-storey homes and tight sites need more scaffolding.
                • New windows and joinery – many owners replace windows while the walls are open.
                • Finishes – the cladding material and any painting or detailing you choose.
                • Roof condition – if the roof is near the end of its life, doing it while the scaffold is already up saves a second mobilisation. Our Auckland reroofing cost guide covers what that adds.

                Recladding is a major project, but it’s also a chance to lift a home’s warmth, weathertightness and value in one hit. The first step is a realistic number. Start with the recladding cost calculator, read the wider picture in our Auckland home renovation guide, then request a free feasibility report for a measured quote from the Superior Renovations team.

                ➡ Book your free in-home consultation with Superior Renovations
                ➡ Price your reclad with the recladding cost calculator
                ➡ Request a free feasibility report for your project

                Free tool
                Price your reclad in under a minute

                Open the recladding cost calculator →


                How much does it cost to reclad a house in NZ?

                In Auckland, recladding runs from about $1,450 per square metre for a standard home, $1,837 for a leaky or plaster home, and $2,175 for an architectural home, before fees. Once you add architectural fees (around $10,150), council consent (around $4,995) and scaffolding (around $35,000), a mid-sized home usually totals between $150,000 and $350,000.

                How much does it cost to reclad a monolithic house?

                Monolithic-clad homes usually sit at the higher leaky-home rate of around $1,837 per square metre, because removing the plaster often reveals damaged framing that must be replaced and treated. That structural repair is the main reason monolithic reclads cost more than a straightforward one.

                How much does it cost to reclad a weatherboard home?

                A weatherboard home is usually the more straightforward reclad and tends to sit at the standard rate of around $1,450 per square metre rather than the leaky-home rate. The two things that move it are rot in the framing behind the boards, and the fact that older weatherboard walls were often built without a drained cavity, so bringing the wall up to a current-code system forms part of the work.

                Why is recladding so expensive?

                Recladding is full exterior building work, not a cosmetic job. It needs a building consent, architectural plans, scaffolding around the whole house, and often structural repairs once the old cladding is removed. Those elements together, on top of the cladding itself, are what push the total into six figures.

                Do I need building consent to reclad my house?

                In most cases yes. A full reclad is building work that requires an Auckland Council building consent, plans and inspections. Only minor like-for-like repairs may be exempt. That is why architectural and consent fees belong in any realistic recladding budget. Confirm your own pathway with Auckland Council or a Licensed Building Practitioner.

                What is included in leaky home repair costs?

                On most Auckland jobs the leaky-home repair is the reclad. The per-square-metre rate covers removing the failed cladding and wrap, installing a drained and vented cavity, new flashings at every junction, and the new cladding. Structural framing replacement, internal repairs and window replacement sit outside that rate because nobody can price them until the cladding is off.

                Can I still make a Weathertight Homes claim?

                No. MBIE confirms the deadline to bring a claim to the Weathertight Homes Resolution Service expired on 31 December 2021, and no new claims can be lodged. If you think you have a legal position on a leaky home, that is a question for a property lawyer rather than a builder.

                Does the estimate include GST?

                Our calculator gives an indicative figure to help you plan. Always confirm whether a quote is GST-inclusive or exclusive when you receive a formal, measured quote, so you are comparing like with like.

                How long does a recladding project take?

                Design and consent come first and have their own timeline. Once on site, a straightforward single-storey reclad often runs several weeks, while a larger home or one needing significant structural repair takes longer. Your project manager gives you a realistic programme once the scope is confirmed after removal, which is the first point at which a date is meaningful.

                Can I live in my house during a reclad?

                Usually yes. The work happens on the outside of your walls, so the kitchen and bathroom keep running. You live with scaffolding, reduced light through the wrap, daytime noise, and some rooms being cooler while their wall is open. It gets harder if windows are being replaced or internal linings have to come off, so we sequence that room by room.

                Should I reroof at the same time as recladding?

                If the roof is near the end of its life, it is worth pricing both together. The scaffolding is already up and the site is already set up, so combining them avoids paying to mobilise twice. If the roof has years left in it, there is no benefit in bringing the spend forward.


                Further Resources for your recladding project

                1. Featured projects and Client stories to see specifications on some of the projects.
                2. Real client stories from Auckland

                Need more information?

                Take advantage of our FREE Complete Home Renovation Guide (48 pages), whether you’re already renovating or in the process of deciding to renovate, it’s not an easy process, this guide which includes a free 100+ point check list – will help you avoid costly mistakes.

                Download Free Renovation Guide (PDF)


                Q Mastercard 18 month interest free finance option for Superior Renovations recladding projects

                Have you been putting off getting renovations done?

                We have partnered with Q Mastercard ® to provide you an 18 Month Interest-Free Payment Option, you can enjoy your new home now and stress less.

                Learn More about Interest-Free Payment Options*

                *Lending criteria, fees, terms and conditions apply. Mastercard is a registered trademark and the circles design is a trademark of Mastercard International Incorporated.

                 

                 


                Still have questions unanswered?

                Book a no-obligation consultation with the team at Superior Renovations, we’d love to meet you to discuss your renovation ideas!

                  Services

                  Home RenovationKitchen RenovationBathroom RenovationOutdoor RenovationHouse ExtensionCommercialDesign ServicesOther

                  By submitting this form, you agree to receive communications from us via email or text regarding our services, you can unsubscribe at any time.

                  This site is protected by reCAPTCHA and the Google

                  Privacy Policy and Terms of Service apply.


                  References

                  1. Building Performance (MBIE) – E2 External moisture
                  2. Building Performance (MBIE) – Weathertight services and the closed claims deadline
                  3. Building Performance (MBIE) – Before building work starts (written contract threshold)
                  4. Auckland Council – building consents
                  house extension cost
                  House Extensions

                  House Extension Cost Calculator NZ — Estimate in 60 Seconds | Superior Renovations

                  Free cost calculator

                  How much will your house extension cost?

                  Get an instant Auckland price range for your project — no details required to see it.

                  Open the Extension Cost Calculator →

                  Quick answer: Get a personalised house extension cost estimate emailed straight to your inbox in under 60 seconds. No phone calls, no sales pitches, no waiting on a builder’s diary. Tell us your project basics, and we’ll send back a project-specific number based on real 2026 Auckland pricing.

                  You’re thinking about extending. You’ve done the basics, pulled up online ranges, looked at a few builder websites, probably had a mate at a barbecue throw out a figure that may or may not be from this decade. What you actually need is a number that fits your project. Your house. Your section. Your space.

                  That’s what this calculator gives you.

                  Why a Calculator Beats a Generic “Per m²” Estimate

                  Most online sources will tell you a house extension in Auckland costs $2,000–$5,500 per square metre. That’s accurate, and our full Auckland house extension cost guide works through where inside that band different projects land. It’s also useless for budget planning.

                  The range exists because extensions vary wildly. A 30m² bedroom addition on a flat section in Flat Bush sits at the bottom end. A 50m² addition with a new kitchen and bathroom on a sloping site in Titirangi sits near the top. Both are “house extensions in Auckland.” Both are technically inside that $2,000–$5,500 spread. Both cost vastly different amounts.

                  The per-m² range alone doesn’t tell you which one you are.

                  That’s where the calculator earns its keep. Instead of giving you a number that covers everyone, it asks the specific questions that move your number, size, type of rooms, whether you’re going up or out, site complexity, and gives you a tailored estimate based on what those choices actually cost in Auckland right now.

                  It takes about a minute. Results land in your inbox.


                  What Goes Into the Estimate

                  The calculator works through the same variables we use when we’re pricing a real project. None of it’s guesswork, every input maps to a cost driver we’ve seen on completed Superior Renovations jobs.

                  Built from data across hundreds of Auckland renovations completed since 2018, including ground-floor extensions, second-storey additions, and garage conversions.

                  Size of the extension. Square metres is the starting point, but it’s not linear. A 30m² extension often costs more per square metre than a 60m² one because fixed costs (consents, design, engineering) don’t scale down. The calculator factors that in instead of just multiplying area by a flat rate.

                  Type of space. A dry room, bedroom, living area, study, costs significantly less than a kitchen or bathroom. Wet areas need plumbing, waterproofing, ventilation, and higher-spec fixtures. Adding a bathroom to an extension typically adds $25,000–$45,000 on top of the dry-room build cost.

                  Single or double storey. Going up is more expensive than going out, usually 40–60% more per square metre once you factor in structural reinforcement, scaffolding, and the work needed to make the existing house carry a new floor.

                  Site conditions. Flat section or sloped? Easy access for trucks and trades, or a tight build? Volcanic clay, reactive soil, or a straightforward concrete slab job? Foundations alone can swing the budget by $30,000+.

                  Finish level. Standard weatherboard and vinyl plank, or cedar cladding and engineered timber? The choice between budget and premium materials makes a five-figure difference on most extensions.

                  You don’t need to know exact specs going in. The calculator gives you a sensible default for each input, your job is to tell it what you’re roughly planning, and the estimate adjusts to suit.

                  💡 Quick tip: If you’re not sure about an input, pick the option closest to what you’re imagining. You can always run it again with different inputs to see how the number shifts, it takes a minute.


                  See Your Personalised Number

                  Inputs take a minute. The estimate hits your inbox right after.

                  Open House Extension Cost Calculator →


                  Thinking about a house extension?
                  Open the calculator →

                  Going Up or Going Out: How the Calculator Treats a Two-Storey Extension

                  This is the single biggest fork in the estimate, and the one most people underestimate before they run the numbers.

                  A second-storey extension costs roughly 40 to 60% more per square metre than the same floor area added at ground level. That gap is not builder margin. It comes from work that a ground-floor extension simply never needs.

                  Why Going Up Costs More

                  • The existing house has to carry the new floor. That usually means steel beams, new or reinforced foundations under the load path, and an engineer’s involvement from the design stage.
                  • The roof comes off. Temporary weatherproofing over an occupied house is a real cost line and a real risk line, and it is the part of the programme most exposed to weather.
                  • Scaffolding all round, for the full duration, rather than the partial staging a single-storey build gets by with.
                  • A staircase has to go somewhere, and that somewhere is usually carved out of existing rooms, so part of the budget is spent renovating space you already had.
                  • Services run further. Plumbing, drainage and electrical all have to reach a floor that didn’t exist.

                  Why Going Out Isn’t Automatically Cheaper

                  Ground-floor extensions win on structure and lose on land. Going out consumes section, which matters on a small or awkward site, and it brings its own cost drivers: new foundations across the full footprint, site works, drainage relocation, and the planning rules that govern how close to a boundary you can build and how much of your site can be covered.

                  On a tight urban section, going up is often the only option that works, and the comparison stops being about cost per square metre. On a generous flat section in Flat Bush or Papakura, going out is usually the better value.

                  If a second storey is what you’re weighing, our breakdown of the cost of adding a second storey goes into the structural side properly. Worth checking the alternatives too: a loft or attic conversion can buy a bedroom without a new floor, and a garage conversion is usually the cheapest square metres on the property because the shell already exists.


                  What Different Extension Sizes Actually Buy You

                  Before you put a number into the calculator, it helps to know what the number is buying. These are the shapes of Auckland extension we’re asked to price most often.

                  Small Extensions (roughly 10–25m²)

                  A bump-out for a dining area, a bedroom added to the rear, an ensuite and walk-in wardrobe off the main bedroom, or a proper entry and mudroom on a house that never had one. Small extensions have the worst cost-per-square-metre and the best cost-per-outcome. Consent, design, engineering and site setup cost roughly what they cost on a bigger job, so the per-metre rate sits high, but the total is the lowest way to solve a specific problem.

                  The trap to avoid at this size is a small extension that triggers a large amount of work inside the existing house. Cutting a new opening through a load-bearing wall, or moving a bathroom to make the layout work, can cost more than the new floor area did.

                  Mid-Size Extensions (roughly 25–50m²)

                  The most common brief we see: open up the back of the house into a kitchen, dining and living space, usually with better indoor-outdoor flow than the original layout allowed. This is where a open-plan living renovation and an extension usually become the same project, because the new space only works if the existing walls change too.

                  Budget realistically for the existing house here, not just the new part. Reworking the old kitchen area, re-levelling floors between old and new, and matching or deliberately contrasting the cladding are all inside the scope, and all get left out of optimistic early numbers.

                  Large Extensions (50m²+)

                  A whole new wing, a second storey, or an extension that comes with a full renovation of what’s already there. Past a certain point the honest question stops being how much the extension costs and becomes whether extending is the right move at all, particularly on an older house where the existing structure, wiring and insulation will all need attention anyway. Our comparison of renovating versus rebuilding is the one to read before committing at this scale.

                  At every size, the constraint that decides what’s possible is your site and the planning rules that apply to it, not the build. Planning a house extension covers that groundwork, and if you want the whole thing handled as one job, that is what designing and building an extension onto an existing Auckland home involves.


                  What You Get in Your Inbox

                  A couple of minutes after you submit, you’ll receive an email with a project-specific estimate. Here’s what’s in it:

                  A low-to-high range based on the inputs you provided. Not a single point estimate, because no honest builder gives you one before a site visit. The range shows you where your project realistically sits.

                  A breakdown of the main cost categories, construction, finishes, professional fees, consents, so you can see where the money goes and where the biggest swings are.

                  Notes on what the estimate doesn’t include. Typically GST, resource consent (if triggered), and any unforeseen ground or structural issues that only become visible once construction starts. We’d rather flag the limits than pretend they don’t exist.

                  It’s not a quote. Quotes need site visits, drawings, and detailed scope. The estimate is the layer before that, the number that tells you whether your project sits in a budget you can work with, or whether you need to rescope before going further.

                  If the number looks workable, the next step is usually a feasibility consultation, where we walk through your specific property, what you’re trying to achieve, and what’s realistic on your section. That’s a separate conversation, and one you can book after you’ve seen the estimate, not before.


                  The Three Variables That Move Your Number the Most

                  If you’ve used the calculator and want to understand what drove your result, these three factors do most of the heavy lifting.

                  1. Foundations and structural work, 20–40% of the total. The single biggest swing factor on most Auckland extensions. A flat-section ground-floor extension on basic slab foundations is dramatically cheaper than a second-storey addition needing steel beams, reinforced foundations, and scaffolding. If you’re on a steep site in Titirangi, Mt Eden, or Remuera, expect this category to push higher because of piling and retaining work.

                  2. Wet areas, kitchen and bathroom additions. Adding either to your extension materially increases the per-m² rate. Bathrooms add $25,000–$45,000. Kitchens add $28,000–$50,000. If your goal is purely more living space, a bedroom or open-plan living extension is going to come in considerably lower than the same square metres with a kitchen or bathroom inside it.

                  3. Labour and trade coordination, 40–50% of the total. Auckland trade rates currently sit at $90–$120/hour depending on the trade. A 50m² extension typically needs 800–1,200 trade hours. The reason fixed-price builders quote higher than charge-up builders isn’t margin, it’s the risk premium for guaranteeing the number. The flip side: charge-up budgets often blow by 15–20% once schedule slip and coordination losses kick in.

                  Knowing which of these three is the biggest factor on your project tells you where to focus when you’re trying to bring the number down, or where to brace yourself if it has to stay where it is.


                  Get Your Free Estimate Now

                  Sixty seconds. Tailored to your project. Sent to your inbox. No sales call.

                  Open House Extension Cost Calculator →


                  Frequently Asked Questions

                  Is the house extension cost calculator free?

                  Yes. No charge, no obligation, no follow-up sales calls. Built by Superior Renovations to give Auckland homeowners a realistic starting estimate without having to chase a builder for one.

                  How accurate is the estimate?

                  The calculator uses 2026 Auckland market pricing and reflects real Superior Renovations project data. It's accurate enough for budget planning and feasibility, but it isn't a quote. Final pricing depends on detailed scope, site visit, and the specifications you settle on during design.

                  What's the average cost to extend a house per square metre in Auckland?

                  Single-storey ground-floor extensions in Auckland sit at $2,000–$5,500 per square metre. Basic dry-room additions are at the lower end. Wet-area extensions and complex sites push toward the top. Second-storey additions add another 40–60% on top of the ground-floor rate.

                  Does a house extension require building consent in Auckland?

                  Yes, almost every house extension triggers building consent because it changes the building footprint and usually involves structural work. Auckland Council consent fees depend on the scope of the work, and resource consent can add more if you breach boundary or height-to-boundary rules. Confirm the current fees with Auckland Council before you budget.

                  How much more does a second-storey extension cost than a single-storey?

                  Roughly 40–60% more per square metre. Second-storey additions need structural reinforcement of the existing house, steel beams, scaffolding, and temporary roof removal, none of which apply to a ground-floor extension.

                  Does the estimate include GST?

                  The estimate is GST-exclusive unless otherwise specified. You'll need to add GST when comparing the estimate to other builder quotes. Architect fees, structural engineering, and council consent fees are also typically excluded from the initial estimate, they get factored in during the detailed quoting stage.

                  How long does it take to get the estimate?

                  Under 60 seconds to complete the form. The estimate lands in your inbox within a couple of minutes.

                  Can I get a fixed quote without using the calculator first?

                  You can, but the calculator's the cheapest way to gauge whether your project fits your budget before committing time to a full design and quoting process. Fixed quotes need scope, drawings, and a site visit, which adds weeks before you see a number. The calculator gives you a starting figure today.

                  Can I use the calculator estimate for my mortgage or finance application?

                  The calculator gives you a realistic project range based on real Auckland pricing, which is useful for early budget conversations with your bank or broker. But banks usually require a signed fixed-price contract or a registered valuer's report before they'll release renovation finance against a property. Treat the estimate as the figure that tells you whether the conversation is worth having, then book a feasibility consultation if you need a quotable number.

                  What happens after I submit, will someone call me?

                  No sales call. The estimate lands in your inbox within a couple of minutes and that's it. If you want to take the next step, you book a feasibility consultation through the site, we don't chase you with phone calls or follow-up emails. Plenty of Auckland homeowners use the calculator to sense-check budget without ever speaking to us, and that's the point.


                  ➡ Book your free in-home consultation with Superior Renovations
                  ➡ Run your project through the house extension cost calculator
                  ➡ Request a free feasibility report for your project


                  Further Resources for your house extension

                  1. Featured projects and Client stories to see specifications on some of the projects.
                  2. Real client stories from Auckland
                  3. House extension cost in NZ and Auckland – the full cost guide
                  4. Planning a house extension – site, rules and sequence

                  Need more information?

                  Take advantage of our FREE Complete Home Renovation Guide (48 pages), whether you’re already renovating or in the process of deciding to renovate, it’s not an easy process, this guide which includes a free 100+ point check list – will help you avoid costly mistakes.

                  Download Free Renovation Guide (PDF)


                  Q Mastercard 18 month interest free finance option for Superior Renovations house extensions

                  Have you been putting off getting renovations done?

                  We have partnered with Q Mastercard ® to provide you an 18 Month Interest-Free Payment Option, you can enjoy your new home now and stress less.

                  Learn More about Interest-Free Payment Options*

                  *Lending criteria, fees, terms and conditions apply. Mastercard is a registered trademark and the circles design is a trademark of Mastercard International Incorporated.

                   

                   


                  Still have questions unanswered?

                  Book a no-obligation consultation with the team at Superior Renovations, we’d love to meet you to discuss your renovation ideas!

                    Services

                    Home RenovationKitchen RenovationBathroom RenovationOutdoor RenovationHouse ExtensionCommercialDesign ServicesOther

                    By submitting this form, you agree to receive communications from us via email or text regarding our services, you can unsubscribe at any time.

                    This site is protected by reCAPTCHA and the Google

                    Privacy Policy and Terms of Service apply.


                    References

                    1. Building Performance (MBIE) – Check if you need consents
                    2. Auckland Council – Building control fees

                    Please note: Cost factors vary project to project, and the calculator’s accuracy depends on the inputs you provide. The estimate is a planning tool, not a quote. Rates and material costs shift with the market, and final project pricing requires a site visit and detailed scope. While information is considered current at the date of publication, Superior Renovations isn’t liable for any decisions made solely on the calculator output.

                    reroofing cost
                    House Renovation

                    Roof Replacement Cost NZ (2026): What a New Roof Costs in Auckland

                    Quick answer: a full roof replacement on a standard Auckland home costs $10,000 to $45,000, and most homeowners pay $15,000 to $30,000 for Colorsteel long-run steel at $90 to $180 per square metre installed, including removal of the old roof. Corrugated iron sits lower at $70 to $140 per square metre and concrete tiles higher at $120 to $200. Roof size, pitch and access move the number more than the brand of sheet does.

                    Roof size is the main driver, so a per-square-metre figure only gets you halfway. Below you’ll find the rate by material, worked totals by roof size, what a quote should and shouldn’t include, how long the job takes, and a fast way to price your own roof.

                    Free tool
                    Get an indicative reroofing cost for your Auckland home

                    Open the reroofing cost calculator →


                    How much does a new roof cost in NZ?

                    For a standard Auckland home, a full reroof runs $10,000 to $45,000, and most land between $15,000 and $30,000. The material sets the rate per square metre and the roof sets how many square metres you pay for. These are the installed rates we publish for the three roofs we replace most:

                    Roofing material Installed rate Where it fits
                    Corrugated iron $70 to $140 per m² Like-for-like on older villas, bungalows and outbuildings where the classic profile suits the house
                    Colorsteel long-run steel $90 to $180 per m², including removal and disposal of the old roof The default Auckland reroof, and the usual replacement for tired iron or pressed-metal tiles
                    Concrete tiles $120 to $200 per m² Like-for-like on 1970s and 1980s tiled homes; heavier, so a switch to tiles needs a structural check

                    Rates are from our published renovation FAQ. Where a house falls inside each band comes down to the roof’s size, its pitch and how easy it is to get scaffold and a truck to it.

                    The base rates inside our reroofing calculator

                    The calculator works from roof area multiplied by a material base rate, then adds for pitch and for stripping the old roof. These are the figures it starts from:

                    Factor Indicative rate
                    Asphalt shingles from $106 per m²
                    Long-run steel from $150 per m²
                    Steep or complex roof around +10%
                    Removing the existing roof around +25%

                    These are indicative figures for planning, not a fixed quote. The steel base rate is before the strip: add the 25% and it lands near the top of the $90 to $180 installed band above, which is where a pitched Auckland roof with scaffold usually sits. The final number depends on your roof’s exact area, its pitch and complexity, the condition of the framing underneath, and the material you choose. If you’re leaning towards steel, our Colorsteel roofing cost guide goes deeper.

                    💡 Quick tip: Roof area is bigger than floor area because of the pitch and overhangs. A single-storey home with a 120m² footprint can have 150m² or more of actual roof, so don’t estimate off your floor plan alone.

                    Roof replacement cost by roof size in New Zealand

                    Because the rate is per square metre, the fastest way to sanity-check a quote is to work from your roof area. The figures below are worked straight off the two calculator base rates above, on a normal pitch with the old roof left in place. They are arithmetic, not quotes, and they don’t include scaffolding on a two-storey home or any framing repairs found once the old roof is lifted.

                    Roof area Asphalt shingles Long-run steel Steel, old roof stripped (+25%)
                    100m² (small home or unit) about $10,600 about $15,000 about $18,750
                    150m² (typical 3-bedroom) about $15,900 about $22,500 about $28,100
                    200m² (larger family home) about $21,200 about $30,000 about $37,500
                    250m² (large or cut-up roof) about $26,500 about $37,500 about $46,900

                    Two things move those numbers fast. A steep or multi-angle roof adds about 10% for the extra time, safety gear and offcuts. And a two-storey home needs scaffold, which is priced on the job rather than per square metre of roof. If your roof is bigger than you think, that’s normal: pitch and eaves overhangs mean roof area routinely runs 20% to 30% above floor area.

                    The 250m² stripped figure sits just above the $45,000 top of our published range. That’s the honest signal that a large, cut-up roof is where a proper site measure matters most, because small errors in area multiply fast.


                    What does it cost to reroof a typical home?

                    Say you’ve got a standard single-storey Auckland home with roughly 150 square metres of roof, going with long-run steel on a normal pitch. That’s about $22,500 for the new roof. If the existing roof needs stripping first, add around 25% and you’re near $28,000. Choose asphalt shingles instead and the base drops to about $15,900.

                    A steep or cut-up roof with lots of angles pushes it higher again. Enter your roof size, material and pitch into the reroofing cost calculator and it works out your figure in seconds – handy before you start ringing around for quotes.


                    Metal roof replacement, re-roofing iron and switching from tiles

                    Most Auckland reroofs are one of three jobs, and each one is priced and consented a little differently.

                    Replacing corrugated iron with new long-run steel

                    Old iron to new long-run steel is the most common reroof we price. The sheets come off in sections, the battens or purlins underneath get checked for rot and loose fixings, new underlay goes down, then the new sheets, flashings, ridge and barge capping. Because the new roof is the same kind of product in the same position, it usually sits inside the Building Act’s like-for-like exemption covered further down. The real variables are how much of the timber under the old iron needs replacing, and whether the spouting is worth keeping. If you’re weighing profiles and colours, our guide to what a Colorsteel roof costs goes through the options.

                    Replacing a tile roof

                    A tiled roof can be re-laid in new tiles or swapped for steel. Tiles to steel takes weight off the house, but it is not a straight sheet swap. Tile battens are set out for tiles, not for long-run sheets, so the roof usually needs new battens or purlins, and the hips, ridges and valleys are detailed differently. The look of the house changes too, which matters on a character street. Because the new material isn’t comparable to the old one, confirm the consent position with Auckland Council before you commit rather than assuming the like-for-like exemption applies.

                    Pressed-metal tiles and older cement sheet

                    Stone-chip pressed-metal tiles from the 1970s and 1980s often reach the point where the chip has gone and the steel underneath is exposed. Replacing them with long-run is a common upgrade. Older cement roofing needs more care: WorkSafe says a home built before 1 January 2000 may contain asbestos, and that asbestos cement was often used in roof sheeting and ridge capping. Test a sample before anyone lifts a sheet. Our asbestos and renovation guide covers what testing and licensed removal involve.

                    💡 Quick tip: If the sheets are sound and only the paint has failed, a roof repaint is the cheaper route. We publish $2,000 to $7,000 for repainting the roof on a standard 150m² home, and our house painting cost guide covers when paint is enough and when it isn’t.

                    What a new roof price should include (and what sits outside it)

                    Roofing quotes are notoriously hard to compare because two companies can price very different scopes. Before you weigh one against another, check what each one has actually allowed for.

                    Normally inside the price:

                    • Removing and disposing of the old roof, where a strip is part of the job.
                    • New roofing underlay, flashings, ridge and barge capping.
                    • Fixings suited to your site, which matters near the coast.
                    • Access and safety for a single-storey roof, plus site clean-up.

                    Usually priced separately, or once the roof is off:

                    • Scaffolding on a two-storey or steep roof.
                    • Repairs to battens, purlins or framing that only show up on the strip.
                    • New spouting and downpipes, if the existing ones are past it.
                    • Skylights, solar brackets, or moving a flue or aerial.
                    • Asbestos testing and licensed removal on older roofing. WorkSafe notes that asbestos cement was often used in roof sheeting and ridge capping, that homes built before 1 January 2000 may contain asbestos, and that the only way to confirm it is to test a sample. Budget for testing on any roof of that age.
                    💡 Quick tip: Ask every roofer to price the strip and the reroof as separate lines. It’s the single easiest way to see who has allowed for disposal and who hasn’t.

                    How to compare roofing quotes line by line

                    Two roofing quotes that are thousands of dollars apart are rarely the same job. Line them up against this list before you decide which one is cheaper:

                    • Roof area. Is it stated in square metres, and did someone measure it, or was it taken off a floor plan?
                    • Material, profile and colour. A named product, not “long-run” on its own.
                    • Underlay and flashings. New, or reusing what’s there?
                    • Strip and disposal. Included, and priced as its own line.
                    • Timber repairs. A rate for replacing rotten battens or purlins, so a surprise under the old roof has a known price rather than an open one.
                    • Scaffold and edge protection. Included, or a separate hire.
                    • Spouting and downpipes. Replaced, re-used or not mentioned.
                    • Warranties. The manufacturer’s material warranty and the roofer’s workmanship warranty are two different documents. Ask for both.

                    Once the job reaches $30,000 including GST, the paperwork stops being optional. Our guide to the $30,000 written-contract rule explains what your builder has to hand over before you sign.


                    How long does a reroof take, and what happens on site?

                    A straightforward single-storey reroof is often done in a few days to a week, weather permitting. A two-storey house, a steep roof or a strip that turns up rotten framing adds time. The order of work is much the same on every job:

                    1. Measure, quote and consent check. The roof is measured, the material chosen, and the consent pathway confirmed before a date is booked.
                    2. Access. Scaffold or edge protection goes up, especially on a two-storey home.
                    3. Strip in sections. The old roof comes off a section at a time, so the house is never left open and uncovered overnight.
                    4. Inspect and repair. Battens, purlins and framing are checked once they’re exposed, and anything rotten is replaced before the new roof goes on.
                    5. Underlay, sheets and flashings. New underlay, then the roofing, ridge, barge and any penetrations for flues, vents or skylights.
                    6. Spouting, clean-up and sign-off. New spouting if it’s in the scope, the site cleared, and a final walk-round.

                    On our jobs one project manager owns the schedule, the materials and the council communication from the strip to sign-off, so you’re not the one chasing the roofer about the weather. A roof that’s open for part of a day also changes your risk while the work is on. Our renovation insurance guide explains what to check with your insurer before work starts.

                    💡 Quick tip: Late spring through summer gives the driest run of weather for a reroof, so those slots book out first. Get your quotes in over winter and you’ll have more choice of dates.

                    Long-run steel vs asphalt shingles vs tiles

                    The two most common reroofing choices in Auckland sit at different price points and suit different homes.

                    Long-run steel

                    Long-run steel (including Colorsteel) is the Auckland workhorse – durable, quick to install on straightforward roofs, and well suited to our wind and rain. It’s the higher of the two rates but a long-life option.

                    Asphalt shingles

                    Shingles come in lower per square metre and give a different look, often chosen for character homes or steeper roofs where they sit well. They’re a solid mid-range option worth pricing alongside steel.

                    Concrete and pressed-metal tiles

                    Plenty of 1970s and 1980s Auckland homes still carry concrete tiles or the pressed-metal, stone-chip tiles of that era. Both can be replaced like for like, and both change the maths if you switch material: going from a light metal roof to heavy concrete tiles adds load the existing framing may not have been designed for, which pulls the job into consent territory. That’s covered below, and it’s worth settling before you fall in love with a different profile.


                    Signs it’s time to replace the roof rather than repair it

                    A patch is the right answer more often than roofers admit. These are the ones where a full replacement usually wins:

                    • You’ve paid for the same leak twice. Repeat repairs in the same area usually mean the substrate or the flashing detail is the problem, not the hole you keep patching.
                    • Rust at the laps and fixings, not just surface staining. Corrosion working out from the fixing lines is a sheet-life issue.
                    • Widespread chip loss on pressed-metal tiles, where the bitumen is exposed and going chalky.
                    • Sagging lines or soft spots underfoot, which point at the framing rather than the cladding.
                    • Age past the Building Code durability point. Clause B2 of the Building Code requires parts of the building envelope that are moderately difficult to replace, roof cladding among them, to last at least 15 years with only normal maintenance. Well beyond that, a reroof is maintenance catching up rather than an upgrade.
                    • You’re about to spend money on what’s underneath. New insulation, a new kitchen ceiling or a full interior repaint all argue for sorting the roof first.

                    Do you need a building consent to replace a roof?

                    Often not, but it hinges on whether the new roof is comparable to the old one. Schedule 1 of the Building Act exempts replacement of a component with a comparable component in the same position. MBIE’s guidance uses roofing as its worked example: replacing 20-year-old profiled metal roof cladding with comparable profiled metal roofing sits inside the exemption.

                    Where it tips the other way:

                    • Changing to a heavier material. MBIE’s counter-example is corrugated iron swapped for concrete tiles, where the added load is likely to affect the building’s structural behaviour. That needs consent.
                    • Structural work. Substantial replacement of components contributing to structural behaviour or fire safety is outside the exemption.
                    • A durability or weathertightness failure. The exemption doesn’t cover replacing something that failed to meet the Building Code, including external moisture requirements.

                    Consenting and Restricted Building Work calls belong with your council or a Licensed Building Practitioner, not a blog. Auckland Council is the consenting authority here, and we confirm the pathway with them as part of the project so you’re not guessing.


                    Should you reroof, or reroof and reclad together?

                    If your home is due for both, doing them together can save on scaffolding and disruption, since the same access serves both jobs. It’s common on older homes where the roof and cladding have aged at the same rate. If that’s you, it’s worth reading our Auckland home renovation guide to plan the sequence. Monolithic-clad homes are the obvious case, and our monolithic cladding guide covers how to tell whether the walls need attention at the same time as the roof.

                    On the cost side, our recladding cost guide sets out what the cladding half runs to, and you can see how we reclad and reroof in the same programme rather than paying for access twice.


                    What drives your reroofing cost

                    • Roof area – the biggest factor, and larger than your floor area.
                    • Material – long-run steel sits above asphalt shingles per square metre.
                    • Pitch and complexity – steep, multi-angle roofs take longer and cost more.
                    • Removing the old roof – stripping and disposing of the existing roof adds to the total.
                    • Access – scaffold on a two-storey home, or a tight site with no truck access.
                    • Underlying repairs – damaged battens, purlins or framing found during the strip.

                    A new roof protects everything under it, so it’s worth getting right. Start with the reroofing cost calculator for an instant estimate, see local context in our reroofing costs in Auckland guide, then request a free feasibility report for a measured quote from the Superior Renovations team.

                    ➡ Book your free in-home consultation with Superior Renovations
                    ➡ Price your reroof with the reroofing cost calculator
                    ➡ Request a free feasibility report for your project

                    Free tool
                    Price your reroof in under a minute

                    Open the reroofing cost calculator →

                    How much does it cost to replace a roof in NZ?

                    A full reroof on a standard Auckland home runs $10,000 to $45,000, and most homeowners pay $15,000 to $30,000 for Colorsteel long-run steel at $90 to $180 per square metre installed, including removal of the old roof. Corrugated iron sits lower at $70 to $140 per square metre and concrete tiles higher at $120 to $200. Roof size, pitch and access move the figure the most, and scaffold on a two-storey home is usually a separate line.

                    How much does a new roof cost in Auckland?

                    A standard single-storey Auckland home with around 150 square metres of roof in long-run steel is roughly $22,500 on a normal pitch, or near $28,000 if the old roof needs removing first. Asphalt shingles on the same roof come in around $15,900. Our calculator gives you a figure based on your actual roof.

                    What does a new roof cost for a 150m2 house?

                    Worked off our indicative rates, a 150 square metre roof on a normal pitch is about $15,900 in asphalt shingles or about $22,500 in long-run steel, before removing the old roof. Add roughly 25% for a strip and disposal, which takes the steel option to about $28,100. Scaffolding on a two-storey home and any framing repairs found during the strip are priced separately.

                    Is long-run steel or asphalt shingle cheaper?

                    Asphalt shingles are lower per square metre than long-run steel. Steel costs more but is durable, quick to install on straightforward roofs, and well suited to Auckland conditions. Both are worth pricing so you can weigh cost against look and longevity.

                    Can I replace a tile roof with long-run steel?

                    Yes, and it takes weight off the house, but it is not a straight sheet swap. Tile battens are set out for tiles, so the roof usually needs new battens or purlins, and hips, ridges and valleys are detailed differently. Because steel is not comparable to the tiles it replaces, confirm the consent position with Auckland Council before committing rather than assuming the like-for-like exemption applies.

                    Why does removing the old roof cost extra?

                    Stripping the existing roof means labour to remove it, disposal of the old material, and time to inspect and repair any damaged battens or framing underneath before the new roof goes on. In our calculator that adds around 25% to the base cost.

                    Does a steep roof cost more to replace?

                    Yes. Steep and complex roofs with multiple angles take longer, need more safety measures, and use more material for the same footprint. Our calculator adds around 10% for a steep or complex roof compared with a flat or normal pitch.

                    How long does a reroof take?

                    A straightforward single-storey reroof is often done in a few days to a week, weather permitting. A larger or steeper roof, or one needing framing repairs after the strip, takes longer. Your project manager gives you a realistic timeline before work starts.

                    Do I need consent to reroof my house?

                    Replacing roof cladding with a comparable product in the same position is exempt under Schedule 1 of the Building Act, and MBIE uses profiled metal replaced with profiled metal as its example. Consent is needed if you change to a heavier material such as concrete tiles, if the work affects structural behaviour, or if the existing roof failed the Building Code for durability or external moisture. Auckland Council confirms the pathway, and a Licensed Building Practitioner should make the call on any Restricted Building Work.

                    How do I know whether to repair or replace my roof?

                    Repeat leaks in the same spot, rust spreading from the laps and fixings, widespread chip loss on pressed-metal tiles, or sagging and soft spots underfoot all point at replacement rather than another patch. Roof cladding is expected to last at least 15 years under the Building Code, so well past that a reroof is simply maintenance catching up.

                    Is asbestos a risk when we strip the old roof?

                    It can be on older roofs. WorkSafe says homes built before 1 January 2000 may contain asbestos, that asbestos cement was often used in roof sheeting and ridge capping, and that the only way to confirm it is to test a sample. On a roof of that age, allow for testing before the strip, and licensed removal if it comes back positive. It is not a DIY job.

                    What is the best time of year to replace a roof?

                    Roofs get replaced year-round in Auckland, but late spring through summer gives the driest run of weather and the least risk of an open roof catching rain mid-job. Winter is doable - crews stage the work and cover nightly - but wet spells can add days. Booking a few weeks ahead lets you pick a drier window.


                    Further Resources for your reroofing project

                    1. Featured projects and Client stories to see specifications on some of the projects.
                    2. Real client stories from Auckland

                    Need more information?

                    Take advantage of our FREE Complete Home Renovation Guide (48 pages), whether you’re already renovating or in the process of deciding to renovate, it’s not an easy process, this guide which includes a free 100+ point check list – will help you avoid costly mistakes.

                    Download Free Renovation Guide (PDF)


                    18 months 0 percent interest long term finance badge

                    Have you been putting off getting renovations done?

                    We have partnered with Q Mastercard ® to provide you an 18 Month Interest-Free Payment Option, you can enjoy your new home now and stress less.

                    Learn More about Interest-Free Payment Options*

                    *Lending criteria, fees, terms and conditions apply. Mastercard is a registered trademark and the circles design is a trademark of Mastercard International Incorporated.

                     

                     


                    Still have questions unanswered?

                    Book a no-obligation consultation with the team at Superior Renovations, we’d love to meet you to discuss your renovation ideas!

                      Services

                      Home RenovationKitchen RenovationBathroom RenovationOutdoor RenovationHouse ExtensionCommercialDesign ServicesOther

                      By submitting this form, you agree to receive communications from us via email or text regarding our services, you can unsubscribe at any time.

                      This site is protected by reCAPTCHA and the Google

                      Privacy Policy and Terms of Service apply.


                      References

                      1. Building Performance (MBIE) – Schedule 1: general repair, maintenance and replacement
                      2. WorkSafe New Zealand – Asbestos in the home
                      3. New Zealand Legislation – Building Regulations 1992, Schedule 1 (Building Code), clause B2 Durability
                      Great work, good communication, very easy to work with. For downstairs bathroom upgrade.
                      We worked with Alison (kitchen design) and Neil (project management) during our kitchen renovation and had a great experience.

                      Communication was great, there was no 'hard sell', and the team was always available and extremely responsive. The works were completed to our satisfaction and even when things were done in a way we didn't like or was incorrect, all we had to do was point the error out and a team member was sent out immediately to rectify the issue.

                      The end result exceeded our expectations- all done without breaking the bank and within the timeline agreed to at the start.

                      We look forward to enjoying our new kitchen and are already thinking about our next project with the team from Superior renovations.
                      Exceptional Kitchen Renovation Experience

                      We recently had our kitchen renovated by Superior Renovations on Wairau Road, and we couldn’t be happier with the entire experience and, most importantly, the finished result.

                      From the very first day of demolition through to the final cabinet installation, every person involved in the project was exceptional. The quality of workmanship was consistently excellent, and it was clear that everyone took pride in the work they were doing.

                      A special mention has to go to Neil, who managed the entire project brilliantly. The biggest thing that stood out to us was how well organised everything was. The timeline was adhered to week after week, and we always knew exactly what was happening and who would be coming each day. It made what could have been a stressful renovation feel incredibly smooth and well managed.

                      Alison, who helped us with the initial design, was fantastic. She came up with a wonderful design that we immediately loved, and she was always happy to take the time to answer our questions, talk through options and make sure we were comfortable with every decision.

                      The plumber, electrician and cabinet maker were all outstanding, and the quality of their work really shows in the finished kitchen.

                      The transformation from our old kitchen to the new one has been incredible, and we absolutely love our new space. The attention to detail, workmanship, communication and project management were all first class.

                      We would recommend Superior Renovations to anyone and everyone without hesitation. If you’re looking for a company that delivers a quality renovation, keeps to its timeline and provides excellent value for money, we would definitely recommend giving them a call.

                      Thank you to Neil, Alison and the entire Superior Renovations team for giving us a kitchen we absolutely love! 👏👏
                      We have always loved working with Superior renovations and in particular Kevin. We felt like we were getting special one-on-one treatment at all hours of the day. They always produce their work super quick and to a good standard.
                      We added a new bathroom and upgraded the rumpus.
                      Superior Renovations offered a reasonable price and delivered professional services and work.
                      We recommend Superior Renovations for the house renovation.
                      This is our final and exceptionally positive review for Superior Renovations. First and foremost, we must emphasize that they are outstanding!

                      Superior Renovations has completed a comprehensive renovation of our entire house, both externally and internally, including the kitchen, bathroom, painting, carpeting, electronic gate, and more. Throughout the various projects over the past few months, we have been thoroughly impressed by their work and are delighted with the results. Their expertise and service continue to amaze us; they truly listen to our needs and engage in discussions whenever they believe improvements can be made.

                      We extend our gratitude to Cici, who not only served as the sales manager but also as the designer, transforming our kitchen from an early 2000s style to a modern and stylish new one. Neil, our project manager, worked with us daily, attending to every detail and going the extra mile to help us achieve an excellent result.

                      From the very first day of collaboration, we encountered no issues whatsoever, whether in communication, design discussions, or the execution by the on-site teams. We highly recommend Superior Renovations to anyone considering home renovation. Contacting them will reveal why we are so pleased with their work on our home.

                      David and Emily
                      SUPERIOR RENOVATIONS
                      Renovations on one full bathroom and one small ensuite at my home in Sunnynook, Auckland, were completed on 26th June 2026.
                      I am fully satisfied with the work done at my home by all workers and contractors and delighted with the results that I am now enjoying. All work is of a very high standard and attention to care leading to excellent results.
                      All staff of Superior Renovations and associated contractors were at all times helpful and happy to explain all aspects of their work and respectful in listening to any of my concerns or questions, with any changes where necessary being quickly and effectively carried out.
                      I have no hesitation in recommending Superior Renovations as your choice for any bathroom renovation.

                      Valerie Hepburn
                      4 Stoneleigh Court, Auckland
                      In early June, I hired Superior Renovation company to thoroughly renovate our two bathrooms. The project has now been completed and we are very satisfied. Thank you sincerely, and we highly recommend it.
                      Despite some delays, Eunice, Neil and the team at Little Giants have done a really good job on out kitchen renovation. Great finishing and very responsive to fixing up any little thing we weren't happy with.

                      Good work team!
                      ​From the very first consultation, our experience with this team has been nothing short of stellar.
                      ​
                      ​Working with Eunice, our sales consultant, set a high bar for the rest of the project.
                      Eunice is truly exceptional at what she does. When we first began our kitchen project, we went through several versions of our floor plan, and she was with us every step of the way—from the initial planning stages right through to the final concept. Her patience and dedication during the design process were remarkable.
                      Throughout the project, Eunice provided:
                      * **Invaluable Suggestions:** She has a keen eye for both aesthetics and functionality, pointing out details we never would have considered on our own.
                      * **Seamless Adjustments:** No matter how many tweaks we requested, she handled every change with professionalism and a "can-do" attitude.
                      * **Expert Guidance:** She transformed our vague ideas into a cohesive, stunning reality.
                      ​
                      ​Once the planning was complete, Neil, our project manager, took the reins and truly blew us away. Neil is a consummate professional who balances technical expertise with fantastic communication.
                      ​ He kept us informed at every stage, ensuring we knew exactly what to expect and when.
                      Whenever a minor pivot was needed, Neil handled it with grace and efficiency, keeping the timeline on track.
                      His standards for the renovation work were incredibly high, ensuring the final result was polished and beautiful.
                      ​
                      ​The transition from Eunice’s initial planning to Neil’s execution was flawless. If you are looking for a team that combines design expertise with top-tier project management, look no further. We are absolutely thrilled with our new kitchen and new flooring !
                      Superior Renovations has just finished a complete remodel of my bathroom. I can see, why the company has such a high reputation. At every stage, from sales, design, project management, and execution, the company excelled at every point. I am just so happy with the work that they have done and they have exceeded my expectations at every point.
                      Used Superior for a kitchen and bathroom renovation last year. They did an excellent job updating both rooms, communication was excellent ongoing tjrough the project, they coordinated all the tradies, synchronized so there was little downtime, and it all worked exactly as planned and on budget. Was really glad we chose Superior Renovations and plan to use again for our entrance way at some stage.
                      As I said to my work colleagues ‘I have just had the most pleasant experience’. When they realised it was with renovations at home they were shocked - ‘unheard of’ I was told.
                      Everything went to plan - timing, project management, costs, etc, etc. Neil communicated with me daily and made my whole bathroom renovation a pleasure.
                      The best decision I made was choosing Superior Renovations.
                      Thank you Kevin for our initial connection and for passing me on to Neil to manage the whole process.
                      We just finished a bathroom renovation and couldn’t be happier with the results. The craftsmanship is top-notch, and the attention to detail in the tiling and finishing is impressive. The team was professional, kept the workspace clean, and delivered exactly what we envisioned. Highly recommend them for anyone looking for a high-quality transformation.
                      Superior did an excellent job of renovating our ensuite. Project manager Jacob was easy to work with and communications were good.
                      This is our second review for Superior Renovations. They have done two projects earlier this year and we were so impressed by the work they have finished. After discussing and very careful consideration, we decided to go with more projects with them. So far, they have now completed stage 1 renovation of our house. We still amazed for their knowledge and services; they really listen to us and discuss anything with us if they feel/think could be better…
                      From the first day we work with them, we have no issue with them at all, from communication, discussing, designing to the teams working on the site.
                      Especially we are highly recommended to those who are considering doing the house renovation, please contact them and you will know why we are so pleased to have them to do our house renovation.
                      We are thanking Cici, Neil and the teams so much….
                      We are looking forward to seeing what the outcome will be.

                      David and Emily
                      We recently had our bathroom renovated by Superior Renovations and couldn’t be happier with the experience. Dorothy and Neil were an absolute pleasure to work with. They guided us through every step of the process, making what can be a stressful experience feel smooth and straightforward.
                      The quoting process was transparent and detailed, with no hidden fees or surprises. Neil was incredibly responsive and always available whenever we had questions or requests, which gave us real peace of mind throughout the project. We really love the end result and enjoy our new bathroom!
                      We’ll definitely be returning to the Superior Reno team for our next project. Highly recommended!
                      Our bathroom reno has just been completed & I am so happy. The whole process was easy & hassle free. Alison designed our bathroom & was very patient with our changes/then changes back again. Jacob our project manager was a delight to deal with. He always kept us informed of the scheduling & any other information we may have needed. All the tradies worked hard & the job was completed & signed off within 3 weeks. That's demo, full tiling, installation of new everything & delivery & pick up of the skip down a very tricky driveway. We absolutely love the new bathroom & would recommend Superior Renovations everyday. Future jobs I will definitely be contacting them again. Thank so much for your excellent work
                      Having explored our reno options, it was an easy decision to select Superior Renovations for our work. As first timers at anything like this we had to trust the system with grand old 100year old bungalow. We were so pleased to have Cici, Sonny and Kai working with us the whole way through. Be shout out to all the team, builders, plumbers, electricians, tilers and painters. A superb job delivered on budget and ahead of time. The communication from Cici and Sonny was first class. Would highly recommend working with Superior Renovations in fact, we already have more worked booked in. Thanks Superior you made Millie and Monty's parents very happy. 🐾
                      I am very happy with the recent renovation for my new kitchen.
                      The team worked really hard to get it done within the time frame.
                      The manager, Jacob, was very helpful and communicated well and always sorts out any issue immediately.
                      Thank you Irene
                      We couldn’t be happier with our new pergola! From start to finish, the team was professional, punctual, and easy to work with. They took the time to listen to what we wanted and offered great suggestions to make the design even better. The quality of the materials and workmanship is outstanding — everything feels solid, well-built, and beautifully finished. Kudos to Sinan Sun as she has been an amazing contact with the company.
                      We are very pleased with our bathroom reno by Superior Renovations! Jacob, Cici and the team always kept us up to date, were always friendly to deal with and finished ahead of schedule. Most importantly we are very happy with the quality of the work.
                      We have been working with Superior Renovations as a supplier now for over three years. In that time we have found the team to be very professional and well organised. Which is a welcome relief in this industry! Just recently we have become their sole supplier for portaloos, which recognises the collaboration we have forged over these three years.

                      In particular, Leanne and Elaine set a very high standard of communication and flexibility. This is of vital importance when scheduling deliveries and pickups with us, however, they understand not everything can be done at once and are willing to work with us for the best (supplier/contractor/client) outcome.

                      I would imagine this ethos would flow directly through to all their contracted renovation work. A pleasure to work with!
                      A very reliable supplier – we’ve been working with them for three years now, and they have never let us down. Well done to the team.
                      We have been working with these guys for the past 4 years and find them an awesome company to work with, very efficient and organised. I highly recommend!